TCAD Simulations Identify Efficiency Gains for Sustainable CZTS Solar Cells – Bioengineer.org

TCAD Simulations Identify Efficiency Gains for Sustainable CZTS Solar Cells
A comprehensive numerical simulation study has provided new design guidelines for enhancing the performance of copper zinc tin sulfide (CZTS) thin-film solar cells. By utilizing the AMPS-1D and Silvaco-Atlas TCAD software platforms, researchers systematically investigated how various device parameters, including absorber layer characteristics and interfacial engineering, influence photovoltaic power conversion efficiency.
The study focused on optimizing device structures in both conventional substrate and tandem configurations. Researchers examined the effects of absorber thickness and acceptor concentration alongside the specific performance contributions of buffer layers and back-contact modifications.
For the substrate configuration, the simulation determined an optimal conversion efficiency of 13.86 percent. Under these parameters, the device yielded a short-circuit current density of 17.13 milliamperes per square centimeter, an open-circuit voltage of 0.98 volts, and a fill factor of 82.4 percent.
The investigation also evaluated the performance of environmentally friendly, cadmium-free buffer layers. The team assessed several materials, including indium sulfide (In2S3), zinc sulfide (ZnS), zinc oxysulfide (ZnS0.5O0.5), tin disulfide (SnS2), and molybdenum disulfide (MoS2). The simulations indicated that In2S3 and ZnS0.5O0.5 offer performance metrics comparable to or exceeding those of conventional cadmium sulfide buffers, largely due to superior band alignment and reduced rates of interface recombination.
The researchers also quantified the impact of integrating a thin molybdenum disulfide (MoS2) interfacial layer at the back contact. This addition was found to increase the short-circuit current density from 12.9 to 15.11 milliamperes per square centimeter. This improvement is attributed to enhanced carrier collection and the suppression of recombination processes. However, the study noted a trade-off, as excessive MoS2 thickness resulted in higher series resistance, which eventually degraded the device’s overall performance.
By detailing the interactions between absorber properties and interface engineering, these simulation results offer a clearer technical route toward developing sustainable photovoltaic technologies. The researchers emphasize that the synergy between Cd-free buffer integration and precise interfacial control at the back contact remains a viable pathway for improving CZTS solar cell output.
Optimization of the cadmium sulfide buffer layer revealed that thinner layers of approximately 50 nanometers combined with donor concentrations around 5 × 1016 cm−3 significantly enhance fill factor and conversion efficiency. This modeled enhancement resulted from minimizing parasitic absorption and series resistance within the simulated solar cell.
By connecting absorber thickness, acceptor concentrations, band alignment, and recombination suppression to back-contact interfacial engineering, the simulation provides clear computational design guidelines. These modeled insights demonstrate how pairing non-toxic buffer layers with controlled back contacts can advance sustainable, earth-abundant thin-film photovoltaic technologies.
Subject of Research: Numerical performance optimization of CZTS thin-film solar cells.
Article Title: Interface-engineered CZTS solar cells with Cd-free buffers and MoS2 back contacts: a TCAD route toward enhanced photovoltaic performance
Article References: Bouchama, I., Ali-Saoucha, S., Ghebouli, M. A., Fatmi, M., Alanazi, F. K., Saidi, S., Althagafi, T. M., Hammour, R. A., Alawaideh, Y. M., Ghannam, H., & Adaileh, A. D. (2026). Interface-engineered CZTS solar cells with Cd-free buffers and MoS2 back contacts: a TCAD route toward enhanced photovoltaic performance. Materials for Renewable and Sustainable Energy. https://doi.org/10.1007/s40243-026-00406-1
Image Credits: AI Generated
DOI: 10.1007/s40243-026-00406-1
Keywords: CZTS solar cells, thin-film photovoltaics, TCAD simulation, Cd-free buffer layers, In2S3, ZnS0.5O0.5, molybdenum disulfide, back contact engineering, photovoltaic efficiency, renewable energy materials, semiconductor modeling, AMPS-1D, Silvaco-Atlas, solar cell optimization, sustainable photovoltaics
News Source: Denise Maddox. (November 17, 2026). TCAD Simulations Identify Efficiency Gains for Sustainable CZTS Solar Cells. Scienmag.
We bring you the latest biotechnology news from best research centers and universities around the world. Check our website.
Enter your email address to subscribe to this blog and receive notifications of new posts by email.


Bioengineer.org © Copyright 2023 All Rights Reserved.
Login to your account below




Please enter your username or email address to reset your password.


Bioengineer.org © Copyright 2023 All Rights Reserved.

source

Posted in Renewables | Leave a comment

KPCL Invites Bids for 1 GW Solar and 1 GW/2 GWh BESS Projects – Construction World

The minimum bidding quantity is 50 MW of solar capacity integrated with 50 MW/100 MWh of BESS. The storage system must form an integral part of the solar project, with at least 1 MW/2 MWh of BESS installed for every 1 MW of solar capacity. Developers will be responsible for land acquisition or leasing, project construction and evacuation infrastructure up to the State Transmission Utility interconnection point.
The scope includes solar PV systems, inverters, module mounting structures, cabling, transformers, plant supervisory control and data acquisition systems, weather monitoring stations and balance-of-system equipment. Developers must also provide battery management, energy management and power conversion systems, along with fire protection, thermal management and associated protection and control equipment. The BESS must integrate with the solar plant and the scheduling and dispatch systems of KPCL and the State Load Despatch Centre.
Bidders must furnish Rs. 0.7 mn/MW for the solar component and Rs. 0.45 mn/MWh for the BESS component. Selected developers will provide performance bank guarantees of Rs. 1.75 mn/MW for solar and Rs. 1.125 mn/MWh for storage. KPCL will sign 25-year power purchase agreements with successful bidders, while modules must comply with the applicable open-category Approved List of Models and Manufacturers requirements.
The bid submission deadline is 23 November 2026, with techno-commercial bids scheduled to open on 24 November. Developers must maintain a minimum annual capacity utilisation factor of 19 per cent for the first 10 years and 16 per cent thereafter. Eligibility requirements include operational project experience, financial capacity of Rs. 24 mn/MW in average annual turnover for solar, and net worth thresholds of Rs. 7 mn/MW for solar and Rs. 4.5 mn/MWh for BESS.
Karnataka Power Corporation (KPCL) has invited bids to develop 1,000 MW of ground-mounted solar photovoltaic (PV) capacity integrated with 1,000 MW/2,000 MWh of battery energy storage systems (BESS) across Karnataka. The projects will be implemented on a build, own and operate (BOO) basis and will not be eligible for Viability Gap Funding support. The minimum bidding quantity is 50 MW of solar capacity integrated with 50 MW/100 MWh of BESS. The storage system must form an integral part of the solar project, with at least 1 MW/2 MWh of BESS installed for every 1 MW of solar capacity. Developers will be responsible for land acquisition or leasing, project construction and evacuation infrastructure up to the State Transmission Utility interconnection point. The scope includes solar PV systems, inverters, module mounting structures, cabling, transformers, plant supervisory control and data acquisition systems, weather monitoring stations and balance-of-system equipment. Developers must also provide battery management, energy management and power conversion systems, along with fire protection, thermal management and associated protection and control equipment. The BESS must integrate with the solar plant and the scheduling and dispatch systems of KPCL and the State Load Despatch Centre. Bidders must furnish Rs. 0.7 mn/MW for the solar component and Rs. 0.45 mn/MWh for the BESS component. Selected developers will provide performance bank guarantees of Rs. 1.75 mn/MW for solar and Rs. 1.125 mn/MWh for storage. KPCL will sign 25-year power purchase agreements with successful bidders, while modules must comply with the applicable open-category Approved List of Models and Manufacturers requirements. The bid submission deadline is 23 November 2026, with techno-commercial bids scheduled to open on 24 November. Developers must maintain a minimum annual capacity utilisation factor of 19 per cent for the first 10 years and 16 per cent thereafter. Eligibility requirements include operational project experience, financial capacity of Rs. 24 mn/MW in average annual turnover for solar, and net worth thresholds of Rs. 7 mn/MW for solar and Rs. 4.5 mn/MWh for BESS.
J. Kumar Infraprojects reported a 25 per cent year-on-year increase in net profit to Rs 1.13 billion in Q2 FY27, while revenue from operations grew 15 per cent to Rs 15.39 billion.Profitability improved faster than revenue, with EBITDA rising 18 per cent to Rs 2.29 billion. The EBITDA margin expanded to 14.9 per cent, supported by cost control and steady project execution. Net profit margin increased to 7.4 per cent from 6.7 per cent in the corresponding quarter last year.The company’s order book stood at Rs 227.11 billion, equivalent to nearly four times its annual revenue. It secured fresh o..
NORD Drivesystems India (NDPL) has commenced construction of a new manufacturing facility at RMK Industrial Park 3, near MIDC Talegaon Phase V, Pune, with a planned investment of Rs 4 billion. The expansion will double the company’s gearbox and geared motor production capacity and introduce gear-component manufacturing.The facility will cater to domestic demand and exports to other NORD subsidiaries, including its headquarters in Germany. The company also plans to manufacture gears and related components at the new plant, supporting both the Indian market and global operations.Dhanraj Kalbhor,..
SANY Group is preparing to mark its 40th anniversary with its largest-ever exhibition presence at bauma CHINA 2026, scheduled for 23–27 November in Shanghai. The company plans to introduce a new generation of artificial intelligence (AI) agents, robotic machinery and electrified construction equipment, highlighting its transition towards intelligent and autonomous operations.Spread across 9,797 sq m at two venues, the exhibition will feature more than 40 machines, predominantly electrified models, alongside several new product launches. The equipment will be showcased through five integrated..
Get daily newsletters around different themes from Construction world.
Don’t miss out on valuable insights and opportunities
to connect with like minded professionals

A-303, Navbharat Estates, Zakaria Bunder Road, Sewri (West), Mumbai – 400 015, Maharashtra, India
By creating an account, you agree to our Terms and Conditions and have read and acknowledge the Privacy Policy

test
Don’t miss out on valuable insights and opportunities
to connect with like minded professionals

By creating an account, you agree to our
Terms and Conditions and have read and acknowledge the Privacy Policy

test

source

Posted in Renewables | Leave a comment

China's Drinda scraps planned 5 GW Oman solar cell plant – Renewables Now

Renewables Now is a leading business news source for renewable energy professionals globally. Trust us for comprehensive coverage of major deals, projects and industry trends. We’ve done this since 2009.
Stay on top of sector news with with Renewables Now. Get access to extra articles and insights with our subscription plans and set up your own focused newsletters and alerts.

source

Posted in Renewables | Leave a comment

Sunlight on Concrete: Singapore Refreshes Solar Roadmap to Hit 4GW Target by 2035 – Vocal

Singapore is doubling down on its solar ambitions, announcing a major update to its Solar Photovoltaic (PV) Roadmap to support a new national target of deploying four gigawatts-peak (GWp) of solar capacity by 2035. The initiative, led by the Energy Market Authority (EMA), marks a significant escalation from previous goals and reflects the urgent need to decarbonize the nation’s electricity supply in a country where land is at a premium and renewable options are limited.
The EMA revealed that it will collaborate with the Solar Energy Research Institute of Singapore (SERIS) to refresh the roadmap, which was last updated in 2020. This revised strategic document will go beyond traditional assessments, evaluating solar deployment opportunities across a diverse array of surfaces from industrial rooftops and commercial buildings to vertical facades and even floating solar farms on reservoirs. The goal is to chart a clear, actionable pathway for maximizing solar uptake over the medium to long term, ensuring that every viable square meter contributes to the nation’s green energy mix.
Unlocking the Residential Market
A key pillar of the updated strategy is the push to unlock the potential of private residential landed properties. Historically, the adoption of solar panels among homeowners has been hindered by bureaucratic complexity, high upfront costs, and a lack of clear information. To address this, the EMA has signed a memorandum of understanding with the Sustainable Energy Association of Singapore (SEAS). Together, they will explore the development of a "one-stop digital portal" designed to simplify the entire adoption process for homeowners.
This proposed platform aims to demystify solar installation by providing centralized access to information on financing schemes, certified installers, regulatory requirements, and potential savings. By reducing friction and increasing transparency, the EMA hopes to transform solar panels from a niche luxury into a mainstream household utility, thereby tapping into a vast, underutilized resource of rooftop space across the island’s landed housing estates.
Strengthening the Grid for a Distributed Future
However, generating more solar power is only half the battle; integrating it safely and efficiently into the national grid is equally critical. As more households and businesses generate their own electricity, the grid must evolve from a one-way distribution system into a dynamic, two-way network capable of managing fluctuating inputs. To tackle this challenge, the EMA is embarking on a research collaboration with the Energy Research Institute @ Nanyang Technological University (ERI@N). This partnership will focus on studying and mapping the capacity of local electricity networks, identifying bottlenecks, and developing solutions to handle the increased load from distributed energy resources.
Complementing this research, the EMA has awarded grants totaling S$14.9 million (RM47.5 million) to four industry projects aimed at strengthening the resilience of Singapore’s electricity grid. These initiatives are designed to address four critical areas:
Improved Maintenance: Enhancing the operational efficiency and longevity of grid infrastructure.
Impact Management: Developing tools to better manage the variability and impact of growing distributed energy resources.
System Stability: Creating new mechanisms to support grid stability amidst higher penetration of intermittent renewable sources.
Active Participation: Enabling distributed resources, such as home batteries and electric vehicles, to contribute more actively to grid operations through vehicle-to-grid (V2G) technologies and smart energy management systems.
A Holistic Approach to Energy Security
The update to the Solar PV Roadmap is not just an environmental imperative but a strategic move toward energy security. By diversifying its energy sources and reducing reliance on imported natural gas, Singapore is building a more resilient and sustainable power system. The combination of aggressive capacity targets, streamlined residential adoption, and robust grid modernization efforts demonstrates a holistic approach to the energy transition.
As Singapore moves toward its 2035 target, the success of this refreshed roadmap will depend on seamless execution. It requires not just technological innovation but also active participation from homeowners, businesses, and industry players. By making solar easier to adopt and the grid smarter to manage, the EMA is laying the groundwork for a future where sunlight plays a central role in powering the Lion City’s continued growth and prosperity.
Hi I am mark an automotive student and a car, tech and food enthusiast ! Im gonna try and post daily & hope you enjoy what I write and do share my page with people you know. I would gladly appreciate it! Cheers
Subscribe for free to receive all their stories in your feed.
There are no comments for this story
Be the first to respond and start the conversation.
© 2026

Creatd, Inc. All Rights Reserved.

source

Posted in Renewables | Leave a comment

Oman sets early 2027 renewables bid deadlines – MEED

Wil Crisp
Gulf Keystone merger changes oil sector dynamics in Iraqi Kurdistan
Become a MEED subscriber for unlimited access to:
Alternatively Login to your account
17 November 2026
17 November 2026
17 November 2026
17 November 2026
Subscribe or upgrade your current MEED.com package to support your strategic planning with the MENA region’s best source of business information. Proceed to our online shop below to find out more about the features in each package.
Take advantage of our introductory offers below for new subscribers and purchase your access today! If you are an existing client, please reach out to your account manager.
© MEED MEDIA FZ LLC Company number 18693 (Dubai Creative Clusters Authority) Registered address: GBS building, 6th Floor, Al Falak Street, Dubai Media City, PO Box 25960, Dubai, UAE

source

Posted in Renewables | Leave a comment

Company shares footprint of large-scale solar project proposed near Barnesville – InForum

Sponsored By
ADVERTISEMENT
ADVERTISEMENT
BARNESVILLE, Minn. — A proposed solar development near Barnesville, Minnesota, could span for miles north and east of the town.
Area residents learned more about a proposed $1.1 billion solar project planned for land near Barnesville at an open house Monday, Nov. 16.
ADVERTISEMENT
Doral Renewables, the Pennsylvania-based company behind the proposed Buffalo Ridge Solar project, held the event. A steady stream of people attended the open house, looking at posters with facts about the project and mingling with Doral officials and project contractors.
The phased project could have a total capacity of 920 megawatts of generation, enough to power 138,800 homes, according to the company.
A map provided at the open house showed patches of land slated for solar panels starting at the Clay-Wilkin County line, fanning out east and north of the town.
The company has secured about 5,500 acres for the project through easement agreements with local landowners, according to Curtis Nordick, senior manager of development for Doral Renewables. About 4,000 of those acres may be used for solar panel arrays.
If built, the project would tie into the CapX2020 transmission line, which runs by Barnesville and along Interstate 29. The line runs from eastern North Dakota to central Minnesota.
Attendees at Monday’s open house had varying opinions about the project — some expressed full support, while others voiced questions and concerns about the proposed development.
Mark Carr, who serves as the chair of Elkton Township in Clay County, called the panels a “necessary evil.” He worries about setbacks from residences and wear and tear on township roads as the panels are installed.
ADVERTISEMENT
Even so, Carr owns land in Wilkin County that he has signed up for future Doral development. That land makes poor farmland, and the pay for a solar easement on the land was good.
“What they’re offering for it is too sweet of a deal to turn down,” Carr said.
Doral’s proposed solar project would place panels on the land for 30 years, while landowners retain ownership.
The proposed project could bring many jobs for tradespeople, said Jon Mahan, with Northern Midwest Carpenters, a union that represents tradespeople across Minnesota, North Dakota, South Dakota and Wisconsin. Mahan, from South Dakota, attended the open house with a group of union representatives.
Carpenters do about 90% of the work to install solar panels, Mahan said, including pile driving and panel assembly.
“We work with a lot of contractors who are doing these types of projects every day,” Mahan said, and expressed support for the project.
Doral aims to be transparent and will continue conversations with community members, said Vice President of Development Cliff Williams.
ADVERTISEMENT
He also talked about ways the company is already supporting the community with donations to community efforts. A poster displayed at the event said the company has donated to causes like the Barnesville Fire Department and Barnesville Potato Days. It has pledged a $10,000 annual scholarship award to Barnesville Public Schools, it said.
“Doral is very focused on that because we’re going to be here for a long time,” Williams said. “So we want to be good neighbors, good partners.”
Doral, an independent power producer, generally owns and operates its projects.
The proposed Buffalo Ridge Solar project would bring in more property taxes, bring jobs during and after construction and allow local farmers to diversify their incomes, Williams said.
“Solar projects are so benign, and they’re, I think, one of the safest ways to produce electricity,” Williams said. “As we decommission coal plants around the country, we need to replace the electricity, and solar projects are an ideal form of replacement.”
Doral plans to submit a permit application for the two phases of the project to the state Public Utilities Commission by late December or early January.

ADVERTISEMENT
ADVERTISEMENT

source

Posted in Renewables | Leave a comment

Is Tibet’s Solar Power About More Than Renewable Energy? – Central Tibetan Administration

Subscribe
Subscribe
Huge photovoltaic parks, a power line to Guangdong, data centers, and copper mines suggest that Beijing’s green agenda on the plateau also serves strategic goals.
– By Dhondup Wangmo for Bitter Winter, 10 November 2026 
In September 2020, President Xi Jinping announced China’s goals of peaking carbon emissions before 2030 and achieving carbon neutrality by 2060. Since then, renewable energy development has expanded rapidly across the country. Tibet has emerged as one of the main energy bases in this transition. According to the “South China Morning Post,” researchers from the China Society for Hydropower Engineering and the state-owned Power Construction Corporation of China estimate that Tibet’s solar power potential could reach 10,000 GW. A “China Daily” report citing the recently published “China Energy Development 2026,” issued by the China Electric Power Planning and Engineering Institute, states that China supplies approximately 70 percent of the global market for wind power equipment and 80 percent for solar photovoltaic modules. As a result, Tibet will gradually become a center of exploration for China’s energy transition.
Chinese officials claim that this green expansion will generate local employment and improve livelihoods. State media frequently portrays massive solar installations as triumphs of ecological modernization and sustainable development. Yet the unprecedented scale of these projects raises broader, less visible questions: are these initiatives purely environmental, or do they serve deeper geopolitical objectives?
Several studies emphasize the social and economic benefits of photovoltaic solar energy in China. One study describes the Photovoltaic Poverty Alleviation Program as a new energy model that can reduce poverty by raising local incomes, improving the ecosystem, and lowering air pollution. However, this land-intensive model can also transform local landscapes, with potentially far-reaching consequences when the land is damaged. Although official accounts tend to emphasize its benefits, the model’s wider social and environmental impacts receive far less attention.
For instance, the Talatan solar farm in Gonghe County, Qinghai, historically part of the Tibetan region of Amdo, generates 21 GW of power and is presented by state media as a model of ecological restoration and local benefit. In addition, construction has started in the region on the world’s highest-altitude parabolic trough solar thermal facility. Furthermore, the five-year plan China launched this year outlines the construction of 300 energy bases. In short, solar energy projects are multiplying across Tibet.
According to a 2024 research paper published in “Scientific Reports,” construction of the Gonghe Photovoltaic Park began in 2012 and was completed in 2015, with an expected operating life of 20 to 30 years. It is currently considered the world’s largest photovoltaic power station. Chinese sources say the area previously suffered from severe ecological problems, including drought, desertification, and sandstorms. State media now claims that agrivoltaic practices have restored grasslands, supported animal husbandry, and benefited local herders. Overall, this official narrative presents the solar farm as a “win-win” project that turns barren land into a source of clean energy. Yet the scale of the project, several times larger than Manhattan, raises concerns about its necessity, sustainability, and long-term effects. Covering vast areas with solar panels inevitably alters landscapes, affects traditional livelihoods, and reshapes local economies.
In June 2025, Dr. Y. Nithiyanandam of the Takshashila Institution used satellite imagery and geospatial analysis to study the expansion of solar energy infrastructure across the “Tibet Autonomous Region.” The study documented the rapid growth of solar facilities in several areas, including around Shigatse Peace Airport. Since 2020, this area has seen a significant increase in solar infrastructure. Building solar facilities near military installations does not necessarily imply a direct connection with them. However, the development of these projects near strategically important locations in the “TAR” raises an important question: are they genuinely intended for renewable energy generation, as claimed, or do they serve wider strategic and geopolitical objectives?
If such huge projects are to be built in Tibet, Tibetans should have an equal right to make their voices heard. They should also be properly informed about how, when, and why such projects are launched in their areas.
This year, China started building an ultra-high-power transmission line from Tibet to Guangdong Province. It is scheduled for completion by 2029 and is expected to carry an amount of electricity equivalent to about half the annual output of the Three Gorges Dam. Once completed, it will transmit more than 43 billion kilowatt-hours of electricity each year from a renewable energy base in the “Tibet Autonomous Region.” The main feature of this transmission line is that the renewable electricity generated in Tibet will be sent to Guangdong and Shenzhen, which China describes as major industrial and manufacturing hubs, including for the artificial intelligence industry. This shows how Tibet’s energy resources are being used to meet the growing demand for electricity in parts of southern China.
In addition to leveraging Tibet’s renewable resources for large-scale power transmission, China continues to expand the use of renewable energy in its national data centers. Launched in 2022, the “Eastern Data and Western Computing” megaproject aims to use renewable energy resources from the western regions to support data infrastructure in the eastern regions. As part of this strategy, China is extending its supercomputing and digital infrastructure into Tibet. One notable example is the development of the Yajiang-1 computing hub in Lhoka, which is intended to support China’s growing ambitions in AI and high-performance computing. Together, these initiatives show how Tibet’s renewable energy resources are increasingly being integrated into China’s broader digital and technological development strategy.
This growing green infrastructure can therefore also be viewed through the lens of resource dominance. China has stepped up the exploration and exploitation of mineral resources across Tibet, including strategic and critical minerals.
Recent reports in the “South China Morning Post” point to an increase in critical mineral exploration in Tibet. According to these reports, at least nine strategic minerals found in the region rank among the top three in China in terms of known reserves. They also note that the privately controlled Xizang Zhihui Mining and the state-owned Zhaojin Nonferrous plan to develop gold, copper, and other critical mineral projects in Tibet. For example, copper is vital for power transmission lines and grids, so if energy demand increases, the demand for this critical mineral will rise accordingly.
Tibet has abundant copper reserves, and some of China’s largest copper mines, such as Gyama, Yulong, and Qulong, are located in the region. Since 2021, more than 20 million metric tons of copper resources have been discovered there. Copper is also one of several strategic minerals, alongside antimony and chromium, for which Tibet ranks first in China. The Yulong mine alone, for instance, produced 152,000 metric tons of copper in 2025.
Thus, China’s rapid expansion of critical mineral exploitation goes beyond green energy and the so-called environmental efforts it claims to pursue. It is also a strategic move to secure China’s position in the global minerals market and to control these critical resources.
Beyond these strategic implications, renewable energy development raises deeper concerns about its effects on local communities. Sanggay Tashi has described how solar development affects the people living near these projects. The planning of large-scale projects raises important questions about information, consultation, and participation. Do the affected Tibetans receive information in a language they understand? Are land-use arrangements transparent? Can pastoralists meaningfully influence decisions affecting their grazing areas, livelihoods, and culturally significant places?
In conclusion, few would dispute that solar power in Tibet produces green energy; the deeper question is whether it also serves other purposes. Although renewable energy projects in Tibet are framed as clean energy initiatives, their location, scale, and installed capacity warrant closer scrutiny.
Click here to read the original report on Bitter Winter. 
FEATURED NEWS
Sikyong Concludes Washington, D.C. Visit with Congressional Engagements, Community Meetings, and Media Interactions
Sikyong Delivers Keynote Address as a Lightning Speaker at the 6th Annual Summit of the Inter-Parliamentary Alliance on China 
STATEMENT: Devastating Earthquake in Drachen County, Nagchu, Tibet
His Holiness the Dalai Lama Attends Long-Life Prayer Offering by Norbulingka Institute, TIPA, and Nepal Tibetan Lhamo Association
LATEST STORIES

Tibet at a Glance
Tibetan National Flag
Global Tibet Movement
Constitution
Leadership
Judiciary
Legislature
Executive
Election Commission
Public Service Commission
Auditor General
Religion and Culture
Home
Finance
Education
Security
Information & International Relations
Health
Issues Facing Tibet
Sino Tibetan Dialogue
Middle Way Approach
Dolgyal-Shugden
Subscribe
© Central Tibetan Administration • Privacy Policy • Terms of Service

source

Posted in Renewables | Leave a comment

Sungrow Introduces New Modular C&I ESS – TaiyangNews

Sungrow has launched PowerStack 3.0, a modular C&I ESS for standalone storage, solar-plus-storage, EV charging and microgrid applications
The system uses 684 Ah battery cells and a silicon carbide (SiC) power conversion system, with over 92% round-trip efficiency
Sungrow reports a 43% reduction in installation footprint for a 5 MWh system compared with its previous generation
Sungrow has expanded its commercial and industrial (C&I) energy storage portfolio with a new modular battery storage system called PowerStack 3.0. The new system, presented at the Global Energy Pioneer Summit 2026, can be configured for solar PV, battery storage, EV charging, and microgrid applications.
The system supports both 2-hour and 4-hour storage configurations. In solar-plus-storage applications, the system uses a common power conversion system (PCS) for both solar PV and battery storage. According to Sungrow, this removes the need for a separate solar inverter and allows the two systems to share a DC connection. The EV charging module extends this arrangement to charging equipment. For microgrid applications, Sungrow says the system can switch from grid-connected to off-grid operation without interruption, eliminating the need for a separate static transfer switch.
PowerStack 3.0 uses 684 Ah stacked battery cells and Sungrow’s silicon carbide (SiC) PCS. The company reports a peak PCS conversion efficiency of 99.2%, while the system’s round-trip efficiency exceeds 92%. The system offers an installation energy density of up to 256 kWh/m². According to Sungrow, a 5 MWh installation requires 43% less space than the previous generation. Up to 20 units can be connected in parallel. It has an IP55 protection rating and C5 corrosion resistance, with an operating temperature range of -30°C to 50°C. The company has also included 3-level fuse protection and a 4-layer fire safety system.
Sungrow has integrated its AI assistant, Bubbly, into the platform to support project planning, commissioning, and operation. During operation, it uses solar generation and electricity demand forecasts to manage battery charging and discharging. Sungrow claims this can improve returns by more than 12% compared with conventional self-consumption operation.
TaiyangNews 2024

source

Posted in Renewables | Leave a comment

Solarworld Energy Solutions Records 81.1% Revenue Growth In Q2 FY27; Plans 2.4 GW Solar Cell Manufacturing Facility – SolarQuarter

Solarworld Energy Solutions Records 81.1% Revenue Growth In Q2 FY27; Plans 2.4 GW Solar Cell Manufacturing Facility  SolarQuarter
source

Posted in Renewables | Leave a comment

ClearVue secures solar cladding supply deal for Singapore project – pv magazine Global

ClearVue Technologies has received a letter of award (LOA) for a sub-contract worth up to almost AUD 860,000 ($579.261,6) to supply its energy-generating solar cladding technology for a Singapore government-owned building in the city-state.
The contract, valued at between AUD 573,000 to AUD 859,800 and awarded through an unidentified Singapore-based façade contractor, covers approximately 4,000 square metres of façade area on the building.
ClearVue said it will manufacture and supply solar energy-generating laminated glass panels, finished in grey with matching aluminium edge framing, for the project. The system has been designed to deliver a combined 670 kW of electricity generation capacity, contributing to the building’s overall annual renewable energy target.
The company said it will also manufacture bespoke framing for the project and will utilise its thermal bridge junction box technology on a sealed-face façade, the specific application the technology was designed for.
While unable to name the contractor or the specific project due to commercial confidentiality, ClearVue Managing Director and Chief Executive Officer Doug Hunt said the contract is “strong commercial validation” of the company’s technology.
“Being selected to supply a government project in Singapore is a significant achievement, not just for this project, but for the business we have spent years building,” he said, adding that the importance goes well beyond the value of this project in revenue.
“We are taking Australian-developed technology into international government infrastructure,” he said. “That is a substantial commercial milestone and strengthens our credibility as we pursue major projects across Asia and around the world.”
The LOA remains subject to project design approvals and final approvals of the manufacturing plan. Final contract value will reflect quantities supplied and delivered.
This latest contract adds to ClearVue’s growing list of projects. It follows a contract to supply its building-integrated PV glazing for a 169 kW project in Cyprus, and a $600,000 subcontract to supply and install its solar products at Canva’s new global headquarters in Sydney.
Earlier this month, ClearVue secured a$500,000 (AUD 742,363) grant from the United States Department of Energy (DOE) to accelerate its push into the American market.
In partnership with North American solar manufacturer Silfab Solar, the company will use the funds to advance its spandrel technology. The grant will support technical development of the technology, performance validation, and evaluation of viable US manufacturing pathways.
ClearVue has also recently established an office and showroom in Hong Kong to support its growth ambitions in the region.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].
Comments
Please login to comment
Day 1 | Europe’s Solar and Storage Markets 2027: What works where?
Day 2 | Solar + Storage Co-location: Three markets, three business cases
Day 3 | Solar Quality: Which technical risks still need better answers?
Day 4 | Cybersecurity and Procurement: What can European solar projects source in 2027 and beyond?
The new issue of pv magazine Global is out now!
Available in print and digital – get your copy today!
Monday, November 23, 2026
11:00 am – 12:00 pm CEST, Berlin, Paris, Madrid
Wednesday, November 25, 2026
7:00 am – 8:00 am CET, Berlin, Paris, Madrid
Tuesday, November 24, 2026
3:00 pm – 4:00 pm CET, Berlin, Paris, Madrid
As a media partner of Genera 2026, pv magazine will organize and moderate a session in Spanish in Madrid, during International Electrification and Decarbonization Week.
Your guide to the U.S. solar and storage market!
Explore the free RE+ 26 Special Edition.
Book your 2027 advertising opportunities now!
Amplify your brand presence with the leading trade media platform for the solar and storage industry.
Reach your target audience across 13 websites in 7 languages, magazines, daily newsletters, industry events and more.
Tuesday, December 15, 2026
10:00 am – 11:00 am CET, Berlin, Paris, Madrid

You have no items in your basket.

source

Posted in Renewables | Leave a comment

Amazon Renewable Energy India: 934 MW Projects Unveiled – urbanacres.in

Amazon has announced plans to invest USD 7 billion, or about Rs 65,393 crore, in renewable energy projects in India by 2030, while unveiling four wind and solar projects with a combined capacity of 934 megawatts. The announcement places large corporate power procurement at the centre of India’s expanding clean-energy infrastructure.
The company said on November 17 that the planned investment will be in addition to the USD 4 billion already contracted for renewable-energy projects in the country. Amazon described itself as one of India’s leading corporate purchasers of carbon-free energy.
The four newly announced projects are being secured through power purchase agreements, under which electricity procurement is contracted from renewable-energy facilities. They include a 234 MW wind farm in Karnataka, a 200 MW hybrid solar-and-wind facility in the same state, a 300 MW solar installation in Madhya Pradesh and a 200 MW solar project in Rajasthan.
The Karnataka wind farm will be Amazon’s largest contracted wind project in Asia to date, according to the company. The combination of wind, solar and hybrid generation across three states will add to the renewable capacity being built to serve the company’s electricity requirements in India.
Amazon said its renewable-energy portfolio in India will exceed 2 gigawatts once the projects become operational. The company estimates that this capacity will generate electricity equivalent to the annual needs of more than 3.5 million Indian households.
The projects also illustrate how large corporate electricity consumers are using long-term procurement agreements to secure renewable power rather than relying only on conventional grid supply. In Amazon’s case, the agreements cover projects spread across states with different renewable-energy resources: wind in Karnataka, solar in Madhya Pradesh and Rajasthan, and a combined wind-and-solar facility in Karnataka.
The announcement comes as the electricity needs of digital infrastructure, logistics networks and large commercial operations continue to make energy procurement an important part of corporate expansion. Amazon’s statement, however, did not provide project-wise construction schedules, commissioning dates, investment allocations or details of the developers executing the four facilities.
The company also did not specify how the contracted electricity would be matched with its facilities in India, or whether the projects would supply power directly or through arrangements involving the wider electricity system. Those details will determine how the announced capacity translates into operational supply for Amazon’s Indian activities.
For the renewable-energy sector, the announcement represents a substantial corporate commitment spread across generation technologies and states. For India’s power infrastructure, it adds another large private-sector demand signal for wind and solar capacity. The four projects are expected to form part of Amazon’s broader contracted renewable-energy portfolio, which the company said will cross 2 GW when operational.

Welcome to Urban Acres, a leading think tank dedicated to promoting sustainable urban built environments in the face of climate change and the need for zero net carbon solutions.
© 2022 Urban Acres | All Rights Reserved

source

Posted in Renewables | Leave a comment

String Solar PV Inverters Market Size to Hit US$ 16,995 Million – openPR.com

String Solar PV Inverters Market Size to Hit US$ 16,995 Million  openPR.com
source

Posted in Renewables | Leave a comment

NAED Energy Holding Inc. Details the Rating of Its PV-1 Tandem Cell Line: 16,000 Wafers per Hour per Line, 4.6 GW from Six Lines – CleanTechnica


NAED Energy Holding Inc. (NAED) just published the rating of PV-1, its production line for T2X perovskite/silicon heterojunction tandem solar cells. Each PV-1 line is rated at 16,000 G12 half-cut wafers per hour: 400 wafers every 90-second index, a rate set by the line’s inline PVD tool (ITO-1). The line’s four PECVD modules are built for a faster 76-second index, about 18,950 wafers per hour.
At NAED’s planning basis—85% availability, 97.5% yield, and the T2X programme target of 30% cell efficiency—one PV-1 line produces about 116 million cells and 0.77 GW of tandem cells a year. NAED’s six-line site, at 96,000 wafers per hour, has a rated capacity of about 4.6 GW a year.
Throughput and capacity in this release are rated values, and cell efficiency is modelled. NAED will publish measured throughput, yield, and efficiency, with their test basis, as results are logged. For all technical information on PV-1 and the T2X cell, contact cto.fusion@naedcorp.com.

The 34.4% figure is NAED’s modelled T2X cell (Voc 1.969 V, Jsc 20.18 mA/cm², fill factor 0.867, 217.2 cm² half-cell). For context, the highest published efficiencies for perovskite/silicon tandem cells of this size are in the 32–33% range, including Maxwell’s certified 32.38% on a G12 half-cell reported in January 2026. NAED’s planning figures use the 30% programme target.
The comparisons below are rate-to-rate. A PV-1 figure describes a complete integrated line, while some benchmarks describe a single tool; supplier figures are the suppliers’ own published ratings.

A single PV-1 line runs at or above the rate of leading single deposition tools while carrying the full tandem process — wet clean, PECVD, PVD, top-cell deposition, printing and test — in one line. Six lines carry the output of about three large HJT lines or seven to eight commercial tandem lines.
One year of output from the six-line site is enough cells for about 7.7 million 600-watt panels, which would generate roughly enough electricity for about 650,000 U.S. homes for a year (17% capacity factor, 10,500 kWh per home; typical U.S. values, not site data). Panels keep generating for 25–30 years, so each year of production adds to that total.
News from NAED Energy Holding Inc.
CleanTechnica’s Comment Policy
Press releases about cleantech products, cleantech companies, or other cleantech news. Some of these may be underwritten by the companies. For more information, or to get your press release into our Newswire Corner, go to this link.
Press Release has 1043 posts and counting. See all posts by Press Release

source

Posted in Renewables | Leave a comment

Tigo Energy Highlights 25% Reclaimed Energy in Spanish C&I Solar Project at GENERA 2026 – Business Wire

Tigo Energy Highlights 25% Reclaimed Energy in Spanish C&I Solar Project at GENERA 2026  Business Wire
source

Posted in Renewables | Leave a comment

Frontier Energy builds 'largest SWIS-connected hybrid solar-plus-storage plant' in Western Australia – Energy-Storage.News

Frontier Energy builds ‘largest SWIS-connected hybrid solar-plus-storage plant’ in Western Australia  Energy-Storage.News
source

Posted in Renewables | Leave a comment

Florida's stormwater ponds become floating solar farms as costs fall and demand rises – Newsday

Florida’s stormwater ponds become floating solar farms as costs fall and demand rises  Newsday
source

Posted in Renewables | Leave a comment

Florida’s stormwater ponds become floating solar farms as costs fall and demand rises – WKMG

Aya Diab
Associated Press
Published: 
Updated: 
Aya Diab
Associated Press
Copyright 2026 The Associated Press. All rights reserved.
An array of solar panels floats atop a pond at Nova Southeastern University, Tuesday, Oct. 13, 2026, in Davie, Fla. (AP Photo/Rebecca Blackwell)
Of the tens of thousands of retention ponds designed to collect runoff during Florida’s frequent downpours, some are also being used to generate solar power, expanding sustainable energy production in the Sunshine State.
Floating photovoltaics — solar panels mounted on buoyant structures anchored in reservoirs and ponds — have become less expensive since the technology emerged two decades ago. They can generate electricity without competing for scarce available land, and the cooling effect of the water may even boost output. Researchers caution, though, that the cost of water-based solar remains high and the environmental impact is not fully understood.
Recommended Videos
After about 20 years, “people have started to believe, have started to see that it works, that it’s fairly reliable, and that lenders and investors have also gained confidence in the technology,” said Oktoviano Gandhi, a scientist at the Qatar Environment and Energy Research Institute.
While the United States has been slow to adopt the technology, Florida’s geography, climate and development history make it particularly well suited for floating solar projects to address growing electricity demand.
Sustainability goals fuel solar expansion
The median reported cost of floating solar projects fell from $2.41 per watt in 2015 to $1.25 per watt in 2024, a decline of about 48%, Gandhi said. Nevertheless, floating solar still costs more upfront than comparable land-based solar. He said published comparisons suggest a premium of roughly 10% to 25%.
While adoption of the technology has grown since the first pilot was installed in Japan in 2007, Gandhi said, floating solar accounts for less than 1% of global solar capacity.
By the end of 2024, more than 9.6 gigawatts of floating solar generating capacity had been installed in 66 countries and regions, Gandhi said.
Rafael Almeida, a freshwater ecosystem scientist and assistant professor at Indiana University Bloomington, said floating solar’s growth is part of the broader expansion of solar energy development, driven by demand for renewable and lower-carbon electricity.
“It’s not like only floating solar is increasing,” Almeida said. “All kinds of solar energy, ground-mounted, in particular, has been accelerating over the past decade.”
About 90% of global floating solar power-generating capacity is in Asia and about half of that is in mainland China, Gandhi said.
The technology is well established in China, Japan, Taiwan and South Korea, where land is at a premium, while the United States is lagging mainly because it has more land available for energy development, Almeida said.
His research group found about 95% of floating solar sites are on managed waters, including reservoirs in Japan, quarry lakes in Europe and aquaculture systems in China.
In the U.S., utilities, municipalities and other public agencies may already control bodies of water in places with high power demands. Floating solar systems have been installed on water treatment ponds and sewer facilities across the country, and even on a winery irrigation pond in Napa Valley, Gandhi said.
Florida opens stormwater ponds to floating solar
Florida explicitly supports floating solar through a state law that was enacted in 2022.
Justin Kramer, director of emerging technologies and data analytics at the Orlando Utilities Commission, said available land is limited and expensive.
“Floating solar provides locations that are within the city limits, but they’re not being used for anything else,” Kramer said.
The state’s towns and cities have an estimated 76,000 stormwater ponds, amounting to about 2.7% of its urban land area, according to University of Florida researchers, based on 2012 land-use data. AJ Reisinger, an associate professor at the university who specializes in urban soil and water quality, said Florida has so many stormwater ponds because of its heavy rainfall, flat terrain, sandy soil and development history.
Experts said the suitability of a body of water depends on proximity to the electrical grid, water levels, anchoring conditions, size, competing uses, economics and environmental considerations.
The commission started out with a 32-kilowatt system that it expanded and then developed a separate 120-kilowatt project. In November 2025, it launched the 2-megawatt Conway Road array, a floating system comprising more than 3,400 panels that the Orlando commission says is the state’s largest floating solar installation.
D3Energy says it holds exclusive rights to develop floating solar systems on eligible Florida Department of Transportation stormwater ponds within state highway rights-of-way, and estimates those systems could generate more than 1 gigawatt of energy.
Florida operators say systems have weathered hurricanes
The floating systems produce about 5% to 8% more power than a typical rooftop array because of the cooling effect of the water, Kramer said. Gandhi cautioned this benefit is sometimes overstated and varies considerably, depending on wind and ambient temperatures.
The panels can reduce evaporation, which Gandhi said is especially useful on irrigation reservoirs in dry regions.
Kramer said Orlando’s arrays are designed for changing pond levels and Florida wind speeds, and have operated through multiple hurricanes.
They are “designed to go up and down as the stormwater pond levels increase or decrease,” he said. “And they’re designed for the wind speeds that we have to deal with.”
D3Energy, which has more than 15 floating solar projects in Florida, said none of its systems suffered structural damage when Hurricane Milton slammed the Gulf Coast in 2024.
Scientists are studying ecological tradeoffs
Stormwater ponds are engineered infrastructure, but they also support algae, plants, bacteria, insects, fish and birds. They can also help manage nutrients, pollutants and sediments.
“They definitely do conduct and perform a lot of the same natural ecological processes and ecosystem functions that we would expect from a natural pond or a natural wetland,” said Reisinger at the University of Florida.
Floating solar can also limit the amount of sunlight entering the water. Reisinger said shading can alter photosynthesis and primary production, potentially changing algae, submerged plants, nutrient removal, habitat and aquatic food webs.
While covering part of a water surface can cool the water and reduce evaporation, it can also change the amount of oxygen available to the aquatic ecosystem, Almeida said.
The Orlando commission tries to limit the coverage to 70% to 80% of a pond’s surface; the exact amount depends on maintenance needs and the pond’s ecosystem, Kramer said.
Scientists do not yet know how much coverage is too much.
“Are there tipping points after which you start changing the system in ways that the nature of the system is dramatically changed?” Almeida said. “At what levels should we stop covering?”
___
The Associated Press’ climate and environmental coverage receives financial support from multiple private foundations. AP is solely responsible for all content. Find AP’s standards for working with philanthropies, a list of supporters and funded coverage areas at AP.org.
Copyright 2026 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed without permission.
TV Listings
Email Newsletters
RSS Feeds
Contests and Rules
Contact Us / Follow on Social Media
Careers at WKMG
Closed Captioning / Audio Description
Public File
Current EEO Report
Terms of Use
Privacy Policy
Do Not Sell My Info
FCC Applications
Disability Assistance

If you need help with the Public File, call (407) 291-6000
At WKMG, we are committed to informing and delighting our audience. In our commitment to covering our communities with innovation and excellence, we incorporate Artificial Intelligence (AI) technologies to enhance our news gathering, reporting, and presentation processes. Read our article to see how we are using Artificial Intelligence.
Copyright © 2026 ClickOrlando.com is managed by Graham Digital and published by Graham Media Group, a division of Graham Holdings.

source

Posted in Renewables | Leave a comment

Sonagazi Solar Power Project in Bangladesh Set for Major Expansion – Construction Review

Construction Review

Published on Nov 17, 2026
Eugene Frank
Bangladesh is advancing plans to build its largest solar power plant project, a 220-megawatt (MW) facility in Sonagazi, Feni District, as the country steps up efforts to expand renewable energy generation and reduce reliance on conventional power sources.
The Sonagazi solar power project, being developed by Electricity Generation Bangladesh (EGB), is estimated to cost Tk1,888.10 crore (approximately $155 million). Construction is expected to be completed by June 30, 2028, with electricity generation scheduled to begin around the same time.
The project is expected to generate approximately 441.18 gigawatt-hours (GWh) of electricity annually for Bangladesh’s national grid, making it a significant addition to the country’s utility-scale solar generation capacity.
State Minister for Power, Energy and Mineral Resources Anindya Islam Amit inaugurated a start-up workshop for the project on November 16, 2026. Speaking at the event, he highlighted the government’s ambition to generate 10,000MW of electricity from renewable sources by 2030. Amit also insisted in the need to meet 20% of national electricity demand through renewables.
The government also expects the Sonagazi solar power plant to contribute significantly towards achieving these targets.
The 220MW solar power plant is being implemented through joint financing. This will see funds from the Bangladesh government, the Islamic Development Bank (IsDB), and Electricity Generation Bangladesh (EGB).
Additionally, a financing agreement between Bangladesh’s Economic Relations Division (ERD) and the Islamic Development Bank was signed on August 3, 2026. This established an important funding arrangement for the project.
The estimated Tk1,888.10 crore investment will support the development of the solar generation facility and its associated electrical infrastructure.
Once complete, the project is expected to strengthen Bangladesh’s domestic electricity supply. This is while diversifying its energy mix through increased investment in utility-scale renewable energy infrastructure.
PV installation 
The Sonagazi solar power project will involve the installation of approximately 469,560 solar photovoltaic (PV) modules, 26 inverters, and two substations.
The major components will include:
Solar PV modules: Approximately 469,560 units for electricity generation.
Inverters: 26 units to convert the direct current (DC) generated by the solar panels into alternating current (AC).
Substations: Two facilities to support electrical infrastructure and power evacuation into the national grid.
One of the notable features of the development is the proposed incorporation of agri-voltaics. This approach will allow agricultural activities and livestock rearing to take place alongside solar electricity generation on the same land.
The approach could also help address one of Bangladesh’s major challenges in expanding utility-scale solar power: competition between energy infrastructure and agricultural land use.
The project also incorporates a community development component. This includes skills development training for approximately 1,000 unemployed local youths and women. It will also establish computer laboratories, and install rooftop solar panels at local educational institutions.
The 220MW project is part of a broader ambition to establish Sonagazi as a major renewable energy generation center.
On September 29, 2026, Bangladesh’s Executive Committee of the National Economic Council (ECNEC) approved a separate project involving the acquisition of 386 acres of land for another 130MW solar power plant in Sonagazi.
There are also plans to develop a 150MW floating solar power plant at Muchapur. This will further expand the area’s renewable energy potential.
Together with the 220MW facility, these proposed developments could establish approximately 500MW of additional solar generation capacity in the wider area. This is with a potential combined capacity of around 600MW when existing facilities are considered.
Furthermore, Electricity Generation Bangladesh already operates a 75MW solar power plant in Sonagazi, providing an existing renewable energy foundation for the expansion.
Bangladesh is seeking to diversify its electricity generation portfolio amid growing demand for power and concerns over dependence on imported fossil fuels.
The government’s target is to generate 10,000MW of electricity from renewable energy sources by 2030. This is while meeting 20% of national electricity demand through renewables.
The Sonagazi project is one of several large-scale solar initiatives being advanced to support this transition.
Another significant development is the proposed 442MW Rampal solar power plant in Bagerhat District. The Bangladesh Power Development Board (BPDB) is preparing for its construction, with commissioning targeted for June 2029.
The Rampal project is particularly notable because it will use land originally acquired for a coal-fired power development.
With the Sonagazi and Rampal projects, Bangladesh is positioning utility-scale solar power as an increasingly important component of its long-term electricity infrastructure.
The immediate priority for Electricity Generation Bangladesh and its financing partners will be advancing project implementation towards the June 2028 completion target.
The start-up workshop inaugurated on November 16, 2026, marks an important project implementation milestone. Subsequent progress will depend on the timely execution of construction activities, installation of the solar generation equipment, completion of the substations, and connection with the national electricity grid.
Sonagazi Solar Power Project in Bangladesh Set for Major Expansion
The project’s expected annual generation of 441.18GWh will also make its actual performance an important measure of Bangladesh’s progress towards its renewable energy targets.
If completed as scheduled, the Sonagazi solar power project will represent a major addition to Bangladesh’s renewable electricity infrastructure. It will also support local employment, skills development, and more efficient use of land through agri-voltaics.
Location: Sonagazi, Feni District, Bangladesh
Project developer: Electricity Generation Bangladesh PLC (EGB)
Installed capacity: 220MW
Estimated investment: Tk1,888.10 crore
Expected completion: June 30, 2028
Expected commissioning: June 2028
Annual electricity generation: 441.18GWh
Solar technology: Photovoltaic (PV)
PV modules: Approximately 469,560
Inverters: 26
Substations: Two
Financing: Government of Bangladesh, Islamic Development Bank and EGB
Community component: Skills training for approximately 1,000 local youths and women
Additional features: Agrivoltaics, computer laboratories and rooftop solar installations at educational institutions
Electricity Generation Bangladesh PLC (EGB) – Project developer
Government of Bangladesh – Project financing
Islamic Development Bank (IsDB) – Financing partner
Economic Relations Division (ERD) – Bangladesh government counterpart responsible for the financing agreement with IsDB.
Ministry of Power, Energy and Mineral Resources
Bangladesh Power Development Board (BPDB)
Source: constructionreviewonline.com All rights reserved. Unauthorized reproduction prohibited.
Name

Email

Sectors:


Your email address will not be published. Required fields are marked *





Welcome to Construction Review a portal that serves the building and construction industry through our blog, e-newsletter, social media presence and print publication

source

Posted in Renewables | Leave a comment

China Slowdown To Drag Down Global Solar Additions in 2026 Even as India Emerges As Bright Spot – Saur Energy

0
By clicking the button, I accept the Terms of Use of the service and its Privacy Policy, as well as consent to the processing of personal data.
Don’t have an account? Signup
Powered by :
Defying the trend of rising solar capacity additions, the latest research by GlobalData forecasts a decline in annual additions for the first time since 2018. In 2026, market was shaken up by the reforms in China, policy changes in the US, and a slowdown in Pakistan collectivelt, they weighing on global demand. 
Other forecasters agree on direction, if not size. SolarPower Europe’s medium scenario puts 2026 at 612 GW, down 8% from a record 664 GW in 2025. BloombergNEF sees 649 GW, a near-flat 0.9% slip, rebounding to 688 GW in 2027. The gap between those numbers matters less than what they share: the fall has one cause.
According to the Global Data report, global solar capacity additions had reached a record high in 2025. However, annual additions are now expected to decline by 17.5% year-on-year in 2026.
GlobalData’s report, Solar PV Market Report, Update 2026, indicates that this slowdown is likely to be temporary, with annual additions expected to recover from 2027 onwards.
Meanwhile, global cumulative solar capacity is forecast to grow at a compound annual growth rate (CAGR) of 12.5% between 2025 and 2035. Solar generation is expected to grow at a similar CAGR over the same period, more than doubling its share of global electricity generation by 2035.
One market, one cause
China installed 382 GW in 2025, some 57% of the global total, as developers rushed to connect before market-based pricing for new projects began in June 2025. The hangover is steep. The China Photovoltaic Industry Association (CPIA) reports 72.07 GW in the first half of 2026, down about 66% from 212.21 GW a year earlier, and forecasts 180 to 240 GW for the full year against roughly 315 GW in 2025 (the sources use different AC and DC accounting). Intertek CEA’s second-quarter report goes further, saying this year’s downturn is driven entirely by China, while most other regions are flat or growing faster.
Where the Growth Went 
Outside China, the picture is brighter. India installed 45.7 GW in 2025, up 49%, overtaking the United States as the world’s second-largest market, SolarPower Europe says. The Middle East and Africa added 23.7 GW, up 51%, with Saudi Arabia tripling its annual installations to 7.9 GW through utility tenders. Ember expects Africa to add a record 17 GW in 2026, up 45%, roughly three-quarters of it distributed, with six countries above 1 GW. Japan’s corporate solar PPAs rose about 30% in the first ten months of 2026.
Mature markets are not uniformly healthy. Germany’s pvXchange warns that module prices are stagnating, battery prices are expected to rise for the first time, and the market needs EEG reforms soon.
Pakistan recorded a 34.3% increase as households, businesses, and farmers installed rooftop and off-grid systems to avoid high grid tariffs, making it the world’s fourth-largest solar market. Saudi Arabia also more than tripled its additions as gigawatt-scale projects came online.
Attaurrahman Ojindaram Saibasan, Power Analyst at GlobalData, said, “Solar PV has become the default choice for new generating capacity in most markets due to low module prices, fast construction times, and strong government targets. The 2026 dip reflects policy shifts in a few large markets rather than a weakening of solar’s fundamentals, with China’s move to market-based tariffs accounting for most of the decline.”
Growth is also expanding across emerging regions. Solar additions in the Middle East and Africa nearly tripled in 2025, while South and Central America recorded a 32.9% increase. Europe’s additions rose by only 2.6% as rooftop demand weakened, while North America’s additions declined by 3.6%.
Over the forecast period, growth is expected to slow across all regions as markets mature. The Middle East and Africa is projected to become the fastest-growing region, with cumulative solar capacity rising at a CAGR of 20.9% between 2025 and 2035, compared with 26.7% during 2020–2025. This growth is expected to be driven by gigawatt-scale tenders in Saudi Arabia and the UAE.
global solar market
GlobalData expects India, Japan, Spain, France, and Egypt to exceed their 2030 solar targets, while Germany and Italy are projected to fall short. Germany’s shortfall is attributed to weaker rooftop demand.
The report also benchmarks official solar capacity targets against GlobalData’s forecasts across the 16 countries covered in the study.
The global solar PV market grew by 11.5% in 2025, even as the average installed cost declined by around 41% between 2020 and 2025.
However, the prolonged decline in module prices has stalled. Higher silver and cell costs, China’s export tax rebate adjustment effective April 2026, and consolidation efforts under its ‘anti-involution’ campaign pushed prices upwards in early 2026.
GlobalData expects the market to contract by 14.8% in 2026 before stabilising through 2035.
Saibasan added, “Grid and flexibility constraints are becoming the main barrier to growth in leading markets. Curtailment is rising in China, negative power prices are becoming more frequent in Europe, and grid connection queues are delaying projects in the US, India, and Brazil. Trade measures add further uncertainty, from US tariffs and Foreign Entity of Concern rules to India’s domestic content requirements and resilience criteria in EU auctions.”
Saibasan concluded, “Falling battery costs are the main counterweight to grid congestion, curtailment, and negative power prices. Solar-plus-storage is now competitive for firm supply in high-resource regions, allowing solar to move beyond daytime generation and compete for round-the-clock supply. Developers and investors that pair solar with storage and secure grid access early will be best placed to capture the recovery from 2027.”
We are India’s leading B2B media house, reporting full-time on solar energy, wind, battery storage, solar inverters, and electric vehicle (EV)
Quick Links
© 2025 Saur Energy. All Rights Reserved.

source

Posted in Renewables | Leave a comment

Simulated GaAs Thin-Film Solar Cells Achieve 24.96 Percent Efficiency with Selective Contacts – Bioengineer.org

Simulated GaAs Thin-Film Solar Cells Achieve 24.96 Percent Efficiency with Selective Contacts
In an optoelectronic simulation study, a gallium arsenide (GaAs) thin-film solar cell configuration employing selective contacts achieved a power conversion efficiency (PCE) of 24.96 percent under standard AM 1.5G illumination conditions. This investigation highlights how specific contact architectures and defect optimization can overcome traditional performance limitations inherent in thin-film semiconductor devices.
GaAs thin-film solar cells are recognized for their excellent charge mobility, superior optical absorption characteristics, and an ideal bandgap for solar energy harvesting. Despite these advantages, practical device performance has historically been constrained by high recombination losses, defect-assisted carrier trapping, and inefficient charge extraction caused by the limited absorber thickness required in thin-film architectures.
In this study, the research team performed a comprehensive optoelectronic simulation to analyze the impact of selective-contact layers on device performance. They utilized titanium dioxide (TiO2) as an electron selective contact and poly(3,4-ethylenedioxythiophene) polystyrene sulfonate (PEDOT:PSS) as a hole selective contact. These materials were chosen for their potential to enhance carrier transport while suppressing recombination at the interfaces.
The simulation framework examined several key parameters, including GaAs absorber thickness, doping concentration, selective-contact properties, and bulk-defect densities. By systematically adjusting these variables, the team sought to identify the configuration that provides the optimum optoelectronic performance. The analysis specifically focused on how these factors influence charge-transport dynamics and recombination mechanisms within the solar cell.
The study identified an optimal device configuration consisting of a GaAs absorber layer with a thickness of 800 nm, paired with selective-contact layers 20 nm thick. Along with these layer dimensions, a doping concentration of 1×1018 cm−3 provided optimum optoelectronic performance in the simulation.
Performance results for the optimized device included a short-circuit current density (Jsc) of 30.14 mAcm−2, an open-circuit voltage (Voc) of 1.11V, and a fill factor (FF) of 74.55 percent.
Spectral-response analysis indicated robust optical utilization across the incident wavelength range. The proposed cell structure demonstrated quantum efficiency consistently exceeding 90 percent, providing clear evidence of efficient photogeneration and subsequent carrier transport.
A comparative analysis using different selective-contact materials highlighted the critical role of band-alignment and carrier-selectivity properties in achieving efficient charge-extraction. The results highlight the effectiveness of selective-contact engineering for enhancing carrier transport and suppressing recombination losses, offering important design guidelines for next-generation thin-film photovoltaic devices.
Subject of Research: Optoelectronic optimization of thin-film GaAs photovoltaic devices using selective contacts.
Article Title: Optoelectronic investigation of GaAs thin film solar cells incorporating carrier selective contacts
Article References: Rai, K., Choukse, J., Sachchidanand, Ravidas, B. K., Agnihotri, S. K., Sahu, M. K., & Prashant, D. V. (2026). Optoelectronic investigation of GaAs thin film solar cells incorporating carrier selective contacts. Discover Applied Sciences. https://doi.org/10.1007/s42452-026-09820-6
Image Credits: AI Generated
DOI: 10.1007/s42452-026-09820-6
Keywords: GaAs, photovoltaics, thin-film, solar energy, selective contacts, TiO2, PEDOT:PSS, carrier transport, recombination, quantum efficiency, semiconductors, optoelectronics, solar cell efficiency, photogeneration, device simulation, band alignment, material engineering
News Source: Denise Maddox. (November 17, 2026). Simulated GaAs Thin-Film Solar Cells Achieve 24.96 Percent Efficiency with Selective Contacts. Scienmag.
We bring you the latest biotechnology news from best research centers and universities around the world. Check our website.
Enter your email address to subscribe to this blog and receive notifications of new posts by email.


Bioengineer.org © Copyright 2023 All Rights Reserved.
Login to your account below




Please enter your username or email address to reset your password.


Bioengineer.org © Copyright 2023 All Rights Reserved.

source

Posted in Renewables | Leave a comment

LONGi at COP31: Four enabling pathways to advance global green development – PV Tech

LONGi at COP31: Four enabling pathways to advance global green development  PV Tech
source

Posted in Renewables | Leave a comment

Luminous Power eyes 3x revenue by 2030, bets on rooftop solar business – ET EnergyWorld

By commenting, you agree to the Prohibited Content Policy
By commenting, you agree to the Prohibited Content Policy
News Arrow
See whats happening in Energy sector right now
Exclusive Arrow
Read and get insights from specially curated unique stories from editorial
Leaders Speak Arrow
Business leaders sharing their insights
Events Arrow
Explore and discuss challenges & trends in India’s leading B2B events
Awards Arrow
Recognise work that not only stood out but was also purposeful
Webinars Arrow
Join leaders & experts for roundtables, conferences, panels and discussions
Subscribe to our Daily Newsletter

By continuing you agree to our Privacy Policy & Terms & Conditions
Advertise With Us
We have various options to advertise with us including Events, Advertorials, Banners, Mailers, etc.
Download ETEnergyworld App
Save your favourite articles with seamless reading experience
Get updates on your preferred social platform
Follow us for the latest news, insider access to events and more.
About Us
Contact Us
Newsletters

source

Posted in Renewables | Leave a comment

Mandatory RE quotas for data centres brighten outlook for solar developers – The Edge Malaysia

This article first appeared in The Edge Malaysia Weekly on November 9, 2026 – November 15, 2026
Summary
A series of developments is lifting the prospects of solar farm developers as the government seeks to increase renewable energy (RE) adoption in the power-hungry data centre (DC) sector.
Last month, Minister of Energy Transition and Water Transformation Datuk Amar Fadillah Yusof said the government was drafting a framework for DC power consumption, which includes a minimum RE requirement of 30%.
Sources tell The Edge that the government is exploring even higher RE targets for future DC projects, particularly those powered off-grid.
It is understood that the 30% threshold has been floated since earlier this year. For DCs approved on the condition of using off-grid power, talk is that the RE requirement could go as high as 50%, although specific details are still being ironed out.
If implemented, the compulsory RE requirements could catalyse new solar farm developments under the Corporate Renewable Energy Supply Scheme (CRESS), which allows RE developers to sell electricity directly to industrial customers.
CRESS adoption has been moving slowly because its primary target market, the DCs, are weighing the programme’s total cost — how much one pays for solar energy plus fees to use Tenaga Nasional Bhd’s (KL:TENAGA) grid — against the cost of just drawing electricity directly from the grid via Tenaga.
A mandatory RE quota now leaves DCs with no choice but to comply and look for solar farms to partner with.
“Thirty per cent is a good number for the DCs. The requirement could be more after that,” says a source.
According to the latest publicly available data, CRESS has attracted the interest of 11 solar farm developers and eight end-consumers, representing more than 3gw in capacity.
One CRESS project making advanced progress is a 100mw solar farm under construction in Kedah, led by privately owned HLGY Energy Sdn Bhd and Singapore-headquartered Bridge Data Centres.
Recent CRESS awards include two projects totalling 189mw won by Northern Solar Holdings Bhd (KL:NORTHERN). Meanwhile, Tenaga is reportedly exploring a 500mw solar supply arrangement with DayOne DCs.
Nevertheless, some power generation developers remain cautious about CRESS’ prospects. “I won’t celebrate yet, not until we see [the conditions] in an official document,” says an executive, pointing to recent adjustments in grid usage fees under CRESS.
In September, the Ministry of Energy Transition and Water Transformation (Petra) announced a reduction in the System Access Charges (SAC) to 14 sen/kWh, down from 20 sen previously, for eligible participants. However, the Energy Commission then clarified in October that CRESS projects remain subject to an additional charge of 4 sen/kWh.
When asked whether a mandatory RE requirement will slow down DC projects, industry players suggest that approved DCs yet to begin construction will likely proceed. A more decisive factor to look at is the government’s push for DCs to source their own electricity off-grid, they say.
How much RE generation capacity needs to be planted up depends on the details in the upcoming framework.
Should the 30% RE requirement be based on gigawatt-hour (gwh) — the total energy consumed over a certain period — a solar farm’s peak generation capacity must be between 80% and 90% bigger than the DC’s capacity to meet the 30% requirement due to the intermittency of solar energy production. For example, a 100mw data centre would roughly require a 180mwp solar farm to meet its 30% RE energy consumption target.
Data from the Ministry of Investment, Trade and Industry (Miti) shows that the government has approved 23gw to 23.5gw of DC capacity, based on maximum demand. This includes 27 DCs that are expected to use off-grid electricity, which reports say carry a combined capacity of about 8gw.
As at August, operational DCs had contracted 2.3gw in capacity demand. By 2030, the total maximum DC demand is expected to cross 8gw, potentially requiring 14gwp of RE capacity to meet a 30% energy supply rule.
Nevertheless, the devil is in the details. Among the questions raised by industry players are whether programmes like CRESS is eligible to be considered as off-grid supply for DCs, or only dedicated self-consumption (Selco) solar installations qualify. Selco solar projects are more challenging logistically because they must be located close to the consumption point.
Another question is whether the Green Electricity Tariff (GET) — RE sold by Tenaga through the grid at a slight premium to the normal tariff — qualifies as RE for the DCs.
GET supply totalling 6.6TWh has been fully taken up, according to data from the Malaysia Green Attribute Tracking System (mGATS). Based on existing available RE capacity of nearly 6gw on the grid, back-of-the-envelope calculations indicate that the GET quota could easily be expanded.
If that quota is increased and is allowed to qualify for DCs’ mandatory 30% RE target, the GET could end up absorbing much of the demand from existing contracted DC capacity of 2.3gw.
One industry player views this outcome as unlikely, though, saying: “The government’s ultimate objective is new generation capacity. But nothing is official yet.”
Outside the DC space, rising fossil fuel costs continue to favour RE adoption.
Malaysia’s electricity tariff has incorporated a fuel surcharge since May, which official projections indicate will stabilise at a higher level in the coming months, potentially increasing to 6 to 8 sen/kWh based on the latest official projections.
Against this backdrop, CRESS is being explored by other industrial users. Among them is a major 680mw joint development between Gamuda Bhd (KL:GAMUDA), SD Guthrie Bhd (KL:SDG) and Petroliam Nasional Bhd’s (PETRONAS) Gentari Sdn Bhd for a US-based tech firm.
The appetite for rooftop solar has picked up again. Data from the Sustainable Energy Development Authority (Seda) shows more than 490mw in rooftop solar applications were submitted in the first 10 months of 2026, with 307mw already operational.
For solar developers, the momentum shows no sign of slowing. Malaysia’s latest Large-Scale Solar bidding round (LSS6) concluded in late October, offering a total allocation of 2,650mw, with the winning bids expected to be announced as early as January next year.
 
Save by subscribing to us for your print and/or digital copy.
P/S: The Edge is also available on Apple’s App Store and Android’s Google Play.

Copyright © 1999-2026 The Edge Communications Sdn. Bhd. 199301012242 (266980-X). All rights reserved

source

Posted in Renewables | Leave a comment

Esther McVey: 'Labour's solar panel plans for agricultural land are insane' – Northwich Guardian

Share
Plans by this Labour government to allow solar panels to be put on some of the country’s best agricultural land are completely insane and will threaten our food security.
I support a balanced energy mix but I cannot support the unnecessary loss of some of our highest-quality agricultural land when brownfield sites, commercial rooftops, warehouses and industrial land remain available alternatives.
Recently, I led a debate in Parliament against the use of solar panels on agricultural land and urged the government to toughen up official planning policy because there is a growing disconnect between government rhetoric that lower-quality land should be preferred, and the reality of what is happening up and down the country. 
Research from the Campaign to Protect Rural England found that 59 per cent of England’s largest solar farms are located on productive farmland, with almost a third occupying the very best agricultural land.
There are plans for a large solar panel development in Tabley and residents in both Tabley and Knutsford have told me they are both ‘distraught and mystified’ why a 150-acre agricultural site is even being considered.
They are understandably concerned over increased traffic levels and noise during the construction phase too and how the character of the area will change.
They were hoping to get answers (at a recent public meeting I organised) from Cheshire East Council and developer Aukera but neither attended.
Tabley Solar Farm – should it go ahead – is being classed as a temporary development. But I do not understand how a scheme, expected to remain in place for 40 years can be called temporary.
It will determine how this land is used for a generation. 
I recognise the financial pressures many farmers face particularly under the government’s savage policies, and why the certainty of a long-term income from solar development may be attractive.
The fault does not lie with individual farmers. It lies with a system that can make generating electricity more profitable than producing food on some of the country’s highest-quality agricultural land.
There are impacts on tenant farmers threatened with eviction and further pressure on land values, which makes it harder for new entrants to join the sector and begin farming.
The truth is this government’s colossal rush to achieve its net zero targets are coming at the expense of our nation’s food security and destroying the UK’s farming land.
Tabley Hill is about more than one planning application in one constituency.
It raises a broader question about food security and the unnecessary planning pressures being put on rural communities.
Share
This website and associated newspapers adhere to the Independent Press Standards Organisation’s Editors’ Code of Practice. If you have a complaint about the editorial content which relates to inaccuracy or intrusion, then please contact the editor here. If you are dissatisfied with the response provided you can contact IPSO here
© 2001-2026. The Northwich Guardian is owned and operated by Newsquest Media Group Ltd, an audited local newspaper network.
Visit newsquest.co.uk to view our policies, terms and legal agreements.
The Echo Building, 18 Albert Road, Bournemouth, England BH1 1BZ. Registered in England & Wales | 01676637
Data returned from the Piano ‘meterActive/meterExpired’ callback event.
As a subscriber, you are shown 80% less display advertising when reading our articles.
Those ads you do see are predominantly from local businesses promoting local services.
These adverts enable local businesses to get in front of their target audience – the local community.
It is important that we continue to promote these adverts as our local businesses need as much support as possible during these challenging times.

source

Posted in Renewables | Leave a comment

Climate COP31 Solutions Floating Solar – yoursun.com

The Daily Sun
An array of solar panels floats atop a pond at Nova Southeastern University, Tuesday, Oct. 13, 2026, in Davie, Fla.
To view our latest eEdition, click the image on the left.
Contact Customer Service
Cookie Preferences

source

Posted in Renewables | Leave a comment

Korea Zinc to establish US solar panel recycling venture with SolarCycle – The Korea Herald


Business Korea Zinc to establish US solar panel recycling venture with SolarCycle
Published : Nov. 17, 2026 – 14:55:33
Add The Korea Herald on Google

Link copied!

Korea Zinc is establishing a joint venture with US-based solar panel recycler SolarCycle to expand its resource recycling operations in the US.
The partnership will combine SolarCycle’s collection network with Korea Zinc’s refining capabilities to recover valuable metals from discarded panels.
Korea Zinc said Tuesday it had signed an agreement with SolarCycle to establish a joint venture called Jupiter. The venture will bring together Evterra, in which Korea Zinc’s US recycling subsidiary PedalPoint holds a stake, and SolarCycle’s business operations.
PedalPoint will contribute its Evterra shares, while SolarCycle will establish a separate entity and contribute its shares in that company. Once the transaction is completed, Korea Zinc will hold 70 percent of Jupiter’s voting rights, and SolarCycle will hold the remaining 30 percent.
SolarCycle has built a collection network for used solar panels in the US. Microsoft announced a strategic investment in the company in October 2024, citing the need for circular raw material supply chains as renewable energy installations expand.
Heritage Group, a US environmental and chemicals conglomerate, also invested through its venture capital arm HG Ventures in 2023. HG Ventures and global asset manager Fifth Wall jointly led a fundraising round of about $30 million.
Korea Zinc plans to use the network to secure discarded panels and recover silver, copper and other valuable metals through its existing refining operations.
As panels contain a mix of glass, aluminum and silicon, efficient pretreatment and processing are needed to extract metals economically. The company aims to apply its nonferrous metal processing expertise to improve recovery efficiency and control costs.
The recycling market is expected to grow as solar installations increase and older panels reach the end of their service lives.
“The joint venture will provide a stable supply of discarded solar panels in the US and combine it with our refining technology and recycling capabilities,” a Korea Zinc official said.
“We will strengthen the recovery of valuable metals and expand our local operations to secure future growth.”
Govt. to ban smart devices, monitor Wi-Fi to curb AI cheating on Suneung
Proctors will check every pair of glasses and every watch worn by test-takers at Thursday’s national college entrance exam, Prime Minister Han Seong-sook said Tuesday.
As Trump seeks talks, Kim heads to Mount Paektu. A political signal?
From paychecks to parcels, a guide to sending things home from Korea
Blackpink’s omission from YG contract list raises questions over group’s future
From paychecks to parcels, a guide to sending things home from Korea
Seoul Autumn Festa helps local artists find stages abroad
Herald Interview
From ballads to burgers: John Park finds viral fame with McDonald’s rap
Stars Up Close
The Ultrarich
Lifestyle of the ultrarich
Stars Up Close
A spotlight on Korean artists who rose to prominence in unexpected ways, and moments behind their breakthroughs
K-parenting 101
Dive into the world of Korean parenting
Herald Interview
A series of in-depth interviews.
Foreign student boom puts Seoul housing on global investors' radar
Seoul shares turn lower amid Nvidia controversies despite Wall Street rally
From chimaek to scandal: Jensen Huang's star loses luster in Korea
Huang's exit could give Korean HBM makers more leverage, raise doubts over Nvidia's AI ventures
Starbucks Korea's losses deepen as boycott fallout lingers
Why Korean actors are playing European royalty in K-drama's new fantasy trend
Telegram increases cooperation with Korean police in criminal investigations
Jennie earns two Grammy nominations as major K-pop agencies sit out new Asian pop category
South Korea races to curb AI cheating ahead of college entrance exam
Adult adoptions: A new side to Korea's multicultural families
Address : Huam-ro 4-gil 10, Yongsan-gu,Seoul, Korea Tel : +82-2-727-0114 Online newspaper registration No : Seoul 아03711
Date of registration : 2015.04.28 Publisher. Editor : Choi Jin-Young Juvenile Protection Manager : Choi He-suk
The Korea Herald by Herald Corporation. Copyright Herald Corporation. All Rights Reserved.

source

Posted in Renewables | Leave a comment

Virginia homeowner plans 12-kW solar system but says current battery isn't a whole-house solution – The Cool Down

© 2025 THE COOL DOWN COMPANY. All Rights Reserved. Do not sell or share my personal information. Reach us at hello@thecooldown.com.
“While the F3800 system has allowed me to do some modest peak shaving, a whole house BESS system, it is not.”
Photo Credit: SPAN
A planned 12-kilowatt solar array is part of a Virginia homeowner’s energy setup for a new, all-electric house. The homeowner is also deciding between two battery systems, with more to consider than a familiar brand.
In a Reddit post, the homeowner compared two options for whole-home storage — FranklinWH’s aPower 2 and the Anker Solix E10 — for a house they plan to build near Charlottesville, Virginia.
The E10 cannot communicate with the SPAN.io electrical panel the homeowner wants the builder to install.
“There’s about a $10k price difference between the two equivalent (20kW output) systems which is significant,” they assessed. “However, the loss in functionality with Anker’s closed system is also significant.”
For homeowners working through a similar comparison, EnergySage offers a resource for exploring battery products and comparing competitive installation estimates. That can help bring equipment choices and installation costs into the same planning process.
EnergySage has partnered with electrification company Qmerit with the stated aim of helping homeowners obtain the best available battery-storage pricing.
The new house’s energy needs include heat-pump heating and cooling, with a split heat-pump water heater also under consideration. According to the post, the homeowner’s existing setup has no solar and consists of an Anker F3800 Plus, a Power Panel, and one expansion battery.
For an all-electric home, appropriately sized battery storage can provide backup during an outage. It may also help lower electricity costs by shifting when the household draws power from the grid.
With energy prices through the roof, there’s never been a better time to go solar — and EasyHome can help you find the best prices from the best installers in your area.
EasyHome takes the guesswork and headaches out of energy upgrades by showing you estimated savings from a network of vetted local partners. To get started, just enter your ZIP and share a few details about your home — seeing your estimate is really that easy.
Another user started the conversation on how to optimize their setup: “Can you ask your electrician to install an Anker Power Dock and a smaller subpanel after it instead of the Span?”
They added that solution would be cheaper while giving the original poster the control they were looking for. They added that it was their setup and they were “very happy with it.”
The homeowner expects to sell the existing F3800 setup either through Marketplace or to the buyer of the current home.
“While the F3800 system has allowed me to do some modest peak shaving, a whole house BESS system, it is not,” they assessed.
The commenter’s suggestion did pique their interest, and they pressed them on how their setup worked and how much control it allowed. The commenter clarified how it worked.
“There are 12 circuits in the power dock,” they wrote. “Those I can control individually through the Anker app. Connected to the power dock is a downstream sub panel.”
They couldn’t control the subpanel’s circuits individually, but said it wasn’t a problem for them. The original poster then charted out how they would organize things, and the commenter obliged by sharing their own details. 
The original poster still had some work to do. They said the specifics could be the “deciding factor” if they went with the E10 and Power Dock.
“Forgot about the fact that some of my equipment/appliances will consume 2 spaces,” they admitted. “I’ll need to dig into that more but expect that I’ll need to start dropping some items on this list.”
For households considering a smaller backup option, Pila offers a plug-and-play alternative at a substantially lower price point than whole-home backup systems.
Other homeowners weighing solar batteries have also had to work out whether a system can cover their household’s needs.
• Two seniors considering backup power heard batteries might not suffice compared with generators.
• In the Pacific Northwest, a homeowner with 13.5-kW solar favored FranklinWH for backup.
• A U.K. homeowner’s £13,000 solar setup lacked outage backup and drained quickly without sunshine.
Get TCD’s free newsletters for easy tips, smart advice, and a chance to earn $5,000 toward home upgrades. To see more stories like this one, change your Google preferences here.
© 2025 THE COOL DOWN COMPANY. All Rights Reserved. Do not sell or share my personal information. Reach us at hello@thecooldown.com.

source

Posted in Renewables | Leave a comment

LONGI wins contract for Australia's Muswellbrook solar farm – Enlit World

At Enlit we’re on a mission to be the inclusive guide to the energy transition. All around the world. 365 days a year. Join us for the latest news, inspiring stories, insights, marketplace and virtual & live events.
LONGi will supply 300,000 solar modules for OX2’s 135MW Muswellbrook solar farm and 100MW battery storage project in New South Wales
Solar technology provider LONGi has been selected to supply its Hi-MO 9 solar modules for the Muswellbrook solar and storage project in the Upper Hunter region of New South Wales, Australia.
The utility scale project is being developed by OX2, with EPC delivery being led by a joint venture between Bouygues Construction Australia and Equans Solar & Storage.
The project includes a 135MW solar farm and a 100MW Battery Energy Storage System (BESS) located across 482 hectares of land on a former coal mine.
The solar plant will be equipped with approximately 300,000 LONGi photovoltaic modules, which will generate about 347GWh of clean electricity per year, enough to meet the power requirements of approximately 52,000 Australian households.
The is located within the Hunter Central Coast Renewable Energy Zone and will connect to NSW’s electricity network via a tee connection into the existing 132kV overhead line to the west of the site.
Have you read?


This will require the construction of approximately 2.4km of 132kV overhead line and a 132kV switching yard, states OX2.
Construction began in May this year, with full operations expected to begin by 2028.
Leon Zhang, President of Utility Europe at LONGi, commented on the project: “We are incredibly proud to partner with OX2, Bouygues Construction Australia, and Equans Solar & Storage on this flagship project. The Muswellbrook Solar Farm is a prime example of sustainable land rehabilitation.”
During the project’s peak construction phase, up to 200 jobs will be created in the Hunter region. Chandler Macleod will actively recruit as Muswellbrook progresses.
The project has secured a long-term hybrid power purchase agreement with an international offtaker, including both solar generation and battery energy storage.
According to LONGi, its Hi-MO 9 bifacial PV modules are well-suited to Australia's high-irradiance and harsh climatic conditions.
The technology will be powered by LONGi’s proprietary HPBC 2.0 (Hybrid Passivated Back Contact) cell technology and Tairay silicon wafers.
The company confirms module efficiencies of up to 24.8% and a highly stable temperature coefficient of -0.26%/°C, which will ensure optimal performance in hot summer temperatures.
LONGi also confirms its modules have an annual linear degradation rate that is 0.05 percentage points lower than standard N-type products, ultimately resulting in a 1.5% power increase after 30 years.
The Muswellbrook project is one of many that demonstrate rapid growth in Australia's solar and energy storage market.
Utility-scale battery energy storage specifically is attracting significant investment, as Australian territories incorporate more renewable energy into the energy mix.
According to the , in the first half of 2026, nine large battery projects were commissioned, adding 2.3GW/7.1GWh of storage. A further 13 storage projects, representing 1.6GW/6.5GWh, reached financial close in H1 2026.
And battery installations are increasingly being paired with solar farms to capture excess daytime generation and dispatch electricity during evening demand peaks, improving project economics and supporting grid stability.
The (AEMO) highlights that hybrid solar-and-battery projects accounted for 19% of the 80.9GW generation and storage connection pipeline in October 2026.
Project pipeline growth is being supported by the government's Capacity Investment Scheme (CIS), state renewable energy targets and growing demand for dispatchable renewable electricity.
This study outlines a socio-technical approach within HYSTORE to accelerate the deployment of thermal energy storage technologies, writes Valeria Palomba
The companies will combine local expertise and international experience to advance 500MW of battery storage projects in France
Solar, wind, hydro and beyond – discover all the latest news, analysis and innovations from the world of renewables. 
Octopus Energy has launched a new service to pay big businesses for using less electricity when the grid is under strain

source

Posted in Renewables | Leave a comment

Brewery founded by Jeremy Clarkson makes solar PV installation appointment – Insider Media Ltd

For further information regarding Insider events, please use the contact details below:
T: 0161 686 2451
E: [email protected]
It’s yet another packed edition of Insider – crammed full of news, profiles, thought-provoking articles and helpful guides to your money,…
A Cotswolds-based brewery, founded by broadcaster and TV farmer Jeremy Clarkson, has instructed a Nottinghamshire-based company to complete its first solar PV installation. 
Hawkstone Brewery has instructed Geo Green for the work on their brewing premises in Bourton-on-the-Water, Gloucestershire.
Work on the installation is set to begin in November of this year and the systems will be used to power processes within the brewery, from milling machines through to heating and cooling systems.
The rooftop solar PV system will comprise of Canadian Solar solar PV modules secured with Renusol fixings, a SolarEdge inverter and SolarEdge Optimizers. 
When fully operational, it will generate 24.25MWh of energy per annum and save 4.9 tonnes of CO₂ each year – the equivalent of planting 215 trees. 
The brewery will subsequently see substantial savings on its energy costs, alongside reduced Scope 2 emissions and increased energy security against the backdrop of continued rising energy prices that have seen many hospitality businesses struggling to make ends meet. 
Ben Bonham, head brewer of Hawkstone Brewery, said: “We're always looking for ways to improve how we operate, and investing in solar energy is a natural next step for us. Brewing is an energy-intensive process, so generating our own renewable electricity will help us reduce our environmental impact while making the brewery more efficient and resilient.”
James Cunningham, managing director of Geo Green Power, said: “We’re incredibly excited to get started on this fantastic project and with our extensive solar experience within the hospitality industry, we know what a great opportunity this is for Hawkstone Brewery.
“It’s also brilliant to be working with a business which also champions agriculture and Britain’s farms. This is something we’ve also seen first-hand, having shared an adjacent tent to the Hawkstone team at this year’s ‘Cereals Event’ held at Jeremy Clarkson’s Diddly Squat Farm.
“This approach is something we highly value at Geo Green Power as we proudly support farmers and farms across the country with commercial solar, and again, we have seen the positive impact investment in renewables has had for these communities.”
You can add us as a preferred source on Google (What’s this?).
Ansons Law reveals plans for new office – “We are investing in Burton for the long-term”
New McDonald’s opens its doors in Keighley – set to create 70 jobs
Future plc examining “strategic options” for B2B division
Collapse of Zavvigroup detailed in new report – assets of pop culture retailer acquired post administration
New ownership for clothing design business
Bluewater confirms opening dates for new winter arrivals
Greencore secures decade-long lease for new business park facility
Breweries team up on new hazy pale ale
Company behind Brothers Cider looks to ‘build on progress’ amid profit and turnover rise
“We are now naturally looking out of the county” – founder of distillery which makes vodka from potatoes targets national and international growth
Senior ESG appointment strengthens Go-Pak sustainability ambitions
Return to profit for PE-backed premium snack manufacturer in ‘turnaround’ year
Family-run physiotherapy practice stretches into new space amid “positive growth”
£6.2m revamp of Bristol city centre street completes – includes significant improvements to public spaces
Watersheds reveals role as electrical engineer acquired by LDC-backed Stonbury
Liquidators of theatre operator pledge to work with groups to re-open popular venue
Former care home hits the market for £1m
Medical manufacturer installs 1,800 rooftop solar panels at Crawley facility
Got a news story for us? Contact us using the details below:
Ben Butler, Senior Digital Staff Writer
T: 0161 686 2441
E: [email protected]
Read more by Ben Butler Publish your news
Interested in advertising with Insider? Contact us on:
Will Allen, Business Development Manager
T: 0117 981 4040
E: [email protected]
Know What’s Happening in Your Region Before the Working Day Starts
Daily coverage of deals, investment, property and senior appointments. Read by over 100,000 entrepreneurs and decision makers.
You can unsubscribe at any time.
Follow Us
Products & Services
Useful Links
About Insider
Part of
Iconic
© Newsco Insider Limited | Registered in England and Wales with Number 02709518 rights reserved
Sitemap | Terms & Conditions | Privacy Policy | Cookie Settings

source

Posted in Renewables | Leave a comment

Massive solar field the size of 36 football pitches opens in Indre-et-Loire – The Connexion

Subscribe to The Connexion
See prices & plans
HELP GUIDES
Income Tax in France
Healthcare in France
Inheritance Law and Wills in France
Visas and residency cards for France
Subscribe to The Connexion
See prices & plans
HELP GUIDES
Income Tax in France
Healthcare in France
Inheritance Law and Wills in France
Visas and residency cards for France
magazine
New 48,800-panel solar farm will produce enough electricity for 21,500 people
A solar farm with 48,800 solar panels (panneaux solaires) – the equivalent of 36 football pitches – has opened in Truyes, between Tours and Loches in Indre-et-Loire.
The south-facing farm, installed in one year by TotalEnergies and solar energy developer Altergie, covers 26 hectares on the site of a former quarry.
“Almost 50,000 photovoltaic panels produce the equivalent of the electricity consumption of 21,500 people,” Annick Noble, TotalEnergies’ director for Centre-Val de Loire, told ICI. “In addition, we estimate that a solar farm of this size prevents 1,100 tonnes of CO₂ from being emitted each year.”
To put 1,100 tonnes of CO₂ into perspective, it is roughly equivalent to the emissions generated by six million kilometres of car travel. It is ideally located away from residential areas, said Emilie Giassis, a project manager at Altergie. 
“It is a very large, flat area on a site that has already been used, so ultimately we are giving it a second life.”
Environmental issues were also part of the site selection. “There are few landscape concerns and little impact on the local flora and fauna. Two protected plant species were present on the site, and the panels completely avoided them,” added Ms Giassis.
Of all the low-carbon energy options, solar farms attract much less opposition than wind turbines, not just for ecological reasons but also aesthetic. “Although there can also be some reluctance, they [solar farms] are more readily accepted as they are easier to integrate into the landscape,” said Ms Noble. “We build the farm and then plant vegetation around it so that it cannot be seen from the road.”
An eco-grazing project is also being developed. “Grass grows beneath and around the panels, so what better solution than to involve nature in maintaining the site? We are currently formalising an agreement with a local farmer,” added Ms Nole.
Small game animals such as birds and rabbits were protected from hunters in areas affected by this summer’s wildfires in the Pyrénées-Orientales.
The decision was welcomed by the French League for the Protection of Birds (LPO), which said the move was “the least that hunters could do” after a particularly difficult summer for local biodiversity, marked by extreme heat and unprecedented wildfires. 
The organisation had also called for the opening of the hunting season to be postponed, to give nature time to recover.
“The animals are exhausted and facing great difficulties in finding food, resting and getting enough water. 
“All living things have been weakened. I also know mountain hunters who have told me they are not hunting given the current situation,” Rossano Pulpito, president of the LPO in the Pyrénées-Orientales, told ICI.
Gard Tourisme has launched a new app, free on Google Play and the Apple App Store, to make it easier for those hiking and exploring the department.
Called Latitude Gard, its “Around me” function uses geolocation to identify nearby heritage sites, outdoor activities, events and visits.
For each trail, users can find all the information they need to plan their outing, including distance, duration, difficulty, elevation gain, route, points of interest and recommendations.
Following checks by inspectors from the French Biodiversity Agency (OFB), Atosca, the company building the highly controversial A69 motorway between Toulouse and Castres, has been ordered to pay €863,500 for failing to comply with its obligations concerning the construction site boundaries.
Giant hogweed, Japanese knotweed and ragweed are spreading in France. Learn why cutting invasive plants can worsen the problem and how they are controlled

Investigators believe the couple had taken possession of at least 23 gold bars
It is important to look out for these terms when paying a deposit
Bourgogne-Franche-Comté, Auvergne-Rhône-Alpes and Corsica recorded highest rates
‘It is important for elderly residents’ to keep local service
South-east France was battered by storm yesterday, flooding remains in some areas

Subscribe to The Connexion
See prices & plans
HELP GUIDES
Income Tax in France
Healthcare in France
Inheritance Law and Wills in France
Visas and residency cards for France

source

Posted in Renewables | Leave a comment

Korea Zinc Forms U.S. Solar Panel Recycling JV with Microsoft-Backed SolarCycle – 아시아경제

Korea Zinc Forms U.S. Solar Panel Recycling JV with Microsoft-Backed SolarCycle
Language
KR
CN
Economic Content Platform for Investors
Language
KR
CN
by Seo Miteum
Published 17 Nov.2026 13:32(KST)
Korea Zinc is partnering with a U.S. solar panel recycling company to expand its local resource-circulation business.
Korea Zinc CI.
Korea Zinc said on November 17 that it recently signed an agreement with U.S. company SolarCycle to establish a joint venture called Jupiter. SolarCycle has built a network in the United States for collecting end-of-life solar panels and securing raw materials. The company drew attention in October 2024 when Microsoft (MS) announced a strategic investment in it.
The joint venture will be formed by combining the stake in Evterra held by Pedalpoint, Korea Zinc’s U.S. resource-circulation subsidiary, with a business division of SolarCycle. Pedalpoint will contribute its stake in Evterra to Jupiter in kind, while SolarCycle will contribute, also in kind, its stake in a separate entity formed by spinning off its business division.
Once the transaction is complete, Korea Zinc’s side will hold 70% of the voting rights in Jupiter, while SolarCycle’s side will hold 30%.
Korea Zinc plans to use SolarCycle’s collection network to secure a stable supply of recyclable materials in the United States. It will also increase its recovery of valuable metals, including silver and copper, by linking the operation with its existing smelting processes. The company will establish a value chain spanning raw material collection, pretreatment, recovery of valuable metals, and smelting and refining.

End-of-life solar panels have a complex structure comprising various materials, including glass, aluminum, and silicon. Efficient pretreatment and smelting processes are needed to recover valuable metals economically. As solar power systems installed in the past in the United States and elsewhere reach the end of their service lives in succession, the volume of end-of-life panels is expected to continue to grow.
A Korea Zinc representative said, “We will continue to improve our competitiveness in recovering valuable metals such as silver and copper while steadily expanding our local resource-circulation value chain in the United States to secure future growth engines.”
© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.
Share
Kakao
Facebook
X
Copy link
Text Size
Normal
Medium
Large
Language
KR
CN
The Asia Business Daily makes no express or implied warranties regarding the accuracy, reliability, or fitness for a particular purpose of translated content.
Please note that some content may be inaccurate due to limitations of the translation solution.
Unauthorized reproduction, redistribution, or use for AI training is strictly prohibited.
Please email us at content@asiae.co.kr for feedback or corrections on our coverage.
Copyright © The Asia Business Daily (www.asiae.co.kr). All rights reserved.

source

Posted in Renewables | Leave a comment

Korea Zinc Partners with SOLARCYCLE for U.S. Solar Panel Recycling – 조선일보

source

Posted in Renewables | Leave a comment

Muswellbrook coal mine makes way for 176MW solar farm – Utility Magazine

Muswellbrook coal mine makes way for 176MW solar farm  Utility Magazine
source

Posted in Renewables | Leave a comment

Where renters can and can’t install solar panels – UK rules explained – The Independent

Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in
Swipe for next article
Plug-in solar could help renters cut their electricity bills, but new regulations restrict where panels can be installed
Removed from bookmarks
Want to bookmark your favourite articles and stories to read or reference later? Start your Independent Membership today.
Already a member?
For years, installing solar panels was largely out of reach for renters. Unless you owned your home and had access to a suitable roof, generating your own electricity wasn’t really an option.
But the arrival of plug-in solar panels in the UK has changed that harsh reality for millions of people. These smaller, relatively affordable systems can be mounted on balconies (with some caveats), walls, patios or in gardens, allowing households to generate electricity simply by connecting them to a suitable socket.
The government estimates that households can save up to £110 a year on their electricity bills with plug-in solar panels, making them an attractive option for tenants who want to reduce their energy costs.
However, while the new rules make it easier to install plug-in solar panels, they don’t mean renters can put panels wherever they like. Regulations introduced in England on 27 August 2026 set out specific restrictions on where the panels can be installed, including a ban on mounting them on wooden balconies.
Here’s what renters need to know about where they can and cannot place them.
Under England’s updated permitted development rules, you can install plug-in solar panels in several locations without having to apply for planning permission. These include:
However, these aren’t automatic rights for renters. Even if planning permission isn’t required, tenants may still need permission from their landlord or freeholder before installing plug-in solar panels.
One of the clearest restrictions in the new regulations is around wooden surfaces.
Under Article 3 of the Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2026, plug-in solar installations are excluded from permitted development rights if any part of the system is installed on:
For freestanding solar installations, Article 4 of the regulations also excludes systems mounted on wooden fences, gates, walls or other wooden enclosures.
These restrictions are in place due to concerns about installing electrical equipment on combustible building materials.
It’s worth noting that these installations are specifically excluded from permitted development rights, which means they can’t go ahead under the usual planning exemption, rather than necessarily being prohibited in every circumstance.
Yes, potentially. Having a balcony doesn’t automatically mean you can install solar panels, but the regulations allow installations on suitable non-timber balcony enclosures, subject to certain conditions.
One important consideration is how far the panels extend beyond the balcony. Under the rules, solar equipment mounted on a non-wooden balcony enclosure generally cannot project more than 20cm beyond the enclosure if it abuts a highway or 40cm beyond the enclosure in other locations. This means renters can’t necessarily hang panels at any angle or extend them well beyond their balcony railings to capture more sunlight.
There are also additional restrictions for certain protected properties and locations, including listed buildings and some properties in conservation areas or World Heritage Sites.
Anyone living in a block of flats should also check whether the building owner or managing agent has specific requirements concerning external installations.
For renters with access to a private garden, freestanding plug-in solar panels may be an alternative to attaching them to the building. These types of systems can be supported by a suitable stand or frame rather than fixed to an external wall or balcony.
However, there are some restrictions around what is permitted for stand-alone solar installations. For starters, the total surface area of your solar panels can’t exceed 9 square metres. And there are also limits on their height and position, with further restrictions around certain protected properties and locations.
Crucially, renters can’t rely on permitted development rights to mount plug-in solar panels on wooden fences or gates.
Even if a proposed installation meets all the planning requirements, renters should check with their landlord before putting up any plug-in solar panels.
Permitted development rights determine whether an installation can go ahead without a planning application, and they don’t override tenancy agreements or permit tenants to alter parts of a building they don’t own. This is particularly important for renters in flats where balconies, exterior walls, gardens and communal areas may be subject to additional restrictions imposed by a freeholder or building management company.
Renters should also ensure that any system they purchase complies with the UK’s plug-in solar safety requirements, including the maximum 800W AC output limit and the government’s product specification.
Not every small solar kit advertised as ‘plug and play’ meets these requirements, so it’s worth checking that a plug-in solar system is UK compliant before buying. You should also make sure that your home’s electrical installation can support plug-in solar. The charity Electrical Safety First has warned that some homes may need electrical upgrades before using plug-in solar.
The bottom line is that plug-in solar offers renters a relatively simple way to generate their own electricity, but choosing the right location is important to figure out in advance. Before buying a kit, check that your proposed installation meets the planning rules, that the mounting surface is suitable and that you have any necessary permission from your landlord.
If you’re ready to take the next step, see our guide to the best plug-in solar panel kits in the UK to compare the options currently available.
Please refresh the page or navigate to another page on the site to be automatically logged inPlease refresh your browser to be logged in

source

Posted in Renewables | Leave a comment

Octopus launches plug-in solar panels for small businesses – BusinessGreen

Octopus launches plug-in solar panels for small businesses  BusinessGreen
source

Posted in Renewables | Leave a comment

Parapet completes six solar projects in Romania and Italy totaling 68.8 MWp – Romania Insider

Parapet completes six solar projects in Romania and Italy totaling 68.8 MWp  Romania Insider
source

Posted in Renewables | Leave a comment

Florida’s stormwater ponds become floating solar farms as costs fall and demand rises – kare11.com

Florida’s stormwater ponds become floating solar farms as costs fall and demand rises  kare11.com
source

Posted in Renewables | Leave a comment

Octopus Energy is bringing its sold-out plug-in solar panels to UK small businesses, says move was a 'no-brainer' following huge demand – TechRadar

Octopus Energy is bringing its sold-out plug-in solar panels to UK small businesses, says move was a ‘no-brainer’ following huge demand  TechRadar
source

Posted in Renewables | Leave a comment

Around 60% of home battery installs rated ‘substandard’ by Australian regulator – pv magazine Global

More than 60% of batteries and about 23% of solar systems installed under the Small-scale Renewable Energy Scheme (SRES) during the 2025–26 financial year were rated as “substandard” while less than 1% of both were deemed “unsafe,” according to a new report from the Clean Energy Regulator (CER).
The CER has published its annual inspection report for the 2025–26 financial identifying installation trends, risks and common areas of non-compliance.
Across the reporting period, the CER completed a record 6,554 inspections, including 3,425 solar battery systems and 3,129 solar inspections.
Just 23.11% of the inspected solar systems were rated as substandard – that is, the installation contains faults that need to be rectified – and 0.93%, or 29 of the 3,129 inspected installs were found to be unsafe – not safe to remain in operation as is.
Of the battery energy storage systems (BESS) inspected, 61.19% were found to be substandard while 0.95% were rated as unsafe.
Critically, the report reveals the common areas of non-compliance identified are almost entirely the result of poor workmanship rather than faulty products.
The most common issues leading to a solar system being rated substandard included incorrectly sized or fitted cabling and conduits, improper bonding or earthing of solar panel frames and other equipment, incompatible or incorrectly installed DC connectors, and improperly fitted mounting structures.
Out of the 29 solar systems deemed unsafe under the 2025–26 inspection program, 16 were due to unsafe installation work, 12 were due to a third-party incident such as weather damaging the system, and one was attributed to a product recall.
The main causes for a battery system being rated substandard included missing or incorrect labelling, incorrectly configured or missing wiring, insufficient rated circuit protection, and inadequate physical protection for cables and the battery.
Of the 32 battery systems rated unsafe, 23 related to unsafe installation work including loose connections, eight were due to a product recall, and one related to a third-party incident.
The CER said the inspection results are being used to support early intervention, targeted education and compliance actions against installers demonstrating ongoing non-compliance.
The regulator said since 1 July 2025 it has communicated with more than 830 installers regarding adverse inspection outcomes and their obligations under the scheme. This includes 716 initial advisory letters to installers for first time non-compliance, and 121 warning letters to installers with repeated non-compliance.
“Our message to installers is simple – do it once and do it well,” the regulator said. “There are serious consequences for repeated non-compliance. We can suspend installers from participating in the scheme if they have three or more inspection reports with adverse findings, or three or more written statements containing false or misleading information.”
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].
Comments
Please login to comment
Day 1 | Europe’s Solar and Storage Markets 2027: What works where?
Day 2 | Solar + Storage Co-location: Three markets, three business cases
Day 3 | Solar Quality: Which technical risks still need better answers?
Day 4 | Cybersecurity and Procurement: What can European solar projects source in 2027 and beyond?
The new issue of pv magazine Global is out now!
Available in print and digital – get your copy today!
Monday, November 23, 2026
11:00 am – 12:00 pm CEST, Berlin, Paris, Madrid
Wednesday, November 25, 2026
7:00 am – 8:00 am CET, Berlin, Paris, Madrid
Tuesday, November 24, 2026
3:00 pm – 4:00 pm CET, Berlin, Paris, Madrid
As a media partner of Genera 2026, pv magazine will organize and moderate a session in Spanish in Madrid, during International Electrification and Decarbonization Week.
Your guide to the U.S. solar and storage market!
Explore the free RE+ 26 Special Edition.
Book your 2027 advertising opportunities now!
Amplify your brand presence with the leading trade media platform for the solar and storage industry.
Reach your target audience across 13 websites in 7 languages, magazines, daily newsletters, industry events and more.
Tuesday, December 15, 2026
10:00 am – 11:00 am CET, Berlin, Paris, Madrid

You have no items in your basket.

source

Posted in Renewables | Leave a comment

Solex Energy’s Q2 FY27 revenue from operations rises 75.8% YoY to INR 2,726 million – pv magazine India

Solex Energy Ltd, a solar PV module manufacturer and EPC services provider, reported consolidated revenue from operations of INR 2,726 million for Q2 FY27, registering 75.8% year-on-year (YoY) growth. Total income for the quarter stood at INR 2,743 million, up 77.4% YoY.
The company said its revenue performance was supported by strong module volumes, healthy product realizations, and steady execution.
EBITDA stood at INR 284 million, 56% up YoY, with an EBITDA margin of 10.4%, compared with 11.8% in Q2 FY 2026. The margin movement was attributed to lower capacity utilisation during the regulatory procurement pause, while fixed costs remained unchanged, coupled with shifts in product mix and working capital utilisation.
Profit after tax (PAT) declined 32.7% YoY to INR 39 million.
“Q2 & H1 FY27 marked a period of transition for the solar module industry, with evolving ALMM List-II regulations and changes in customer delivery schedules impacting market visibility,” said Chetan Shah, Chairman and Managing Director. “During the quarter, Solex Energy reported revenue of INR 2,743 million, EBITDA of INR 284 million and PAT of INR 39 million. Uncertainty around regulatory requirements led the Company to defer fresh inventory procurement from May until clarity emerged in mid-July, with supplies received by September.”
Shah said the company continues to focus on strengthening its manufacturing capabilities through its 4 GW module manufacturing platform, automated production lines and MES-enabled traceability. It is also progressing with its planned 2.2 GW solar cell manufacturing facility as part of its backward-integration strategy.
The company has order book visibility of over INR 4,000 crore, including approximately INR 1,050 crore in confirmed orders backed by advance payments, while the remaining INR 3,000 crore is at an advanced closure stage, pending finalisation of pricing and production schedules.
Headquartered in Surat, Gujarat, Solex Energy operates a fully automated manufacturing facility at Tadkeshwar, Gujarat, with a production capacity of 4 GW for PV modules. It also provides comprehensive EPC solutions across utility-scale, commercial, industrial, and institutional segments.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].
Comments
Please login to comment
Book your 2027 advertising opportunities now!
Amplify your brand presence with the leading trade media platform for the solar and storage industry.
Reach your target audience across 13 websites in 7 languages, magazines, daily newsletters, industry events and more.
Tuesday, December 15, 2026
10:00 am – 11:00 am CET, Berlin, Paris, Madrid
Tuesday, November 24, 2026
3:00 pm – 4:00 pm CET, Berlin, Paris, Madrid
The new issue of pv magazine Global is out now!
Available in print and digital – get your copy today!
Monday, November 23, 2026
11:00 am – 12:00 pm CEST, Berlin, Paris, Madrid

You have no items in your basket.

source

Posted in Renewables | Leave a comment

Genetic Rough Set Fusion Model Identifies Photovoltaic Grid Risks with High Accuracy – Bioengineer.org

Genetic Rough Set Fusion Model Identifies Photovoltaic Grid Risks with High Accuracy
Modern photovoltaic power installations have rapidly evolved from isolated, static generation assets into interconnected, intelligent autonomous networks that serve as integral components of regional and national electrical grids. As these distributed solar arrays integrate remote edge computing nodes, wireless communication channels, and automated supervisory controls, their operational footprint exposes new cyber-physical vulnerabilities. Hostile cyber threats, including unauthorized command tampering, false measurement injections, energy deception, and covert privilege alterations, increasingly exploit these communication pathways to destabilize local generation or infiltrate broader electrical transmission infrastructures. Conventional perimeter-focused defenses and static, rule-based intrusion detection tools consistently struggle in these dynamic operational environments. Traditional security models rely heavily on predefined expert thresholds that create significant detection lags, exhibit severe vulnerability to evolving attack variations, and fail to provide coordinated real-time remediation across complex multi-tiered networks.
To overcome the operational vulnerabilities inherent in networked solar installations, a research team developed a dynamic risk identification and defense framework rooted in an endogenous security architecture driven by a Genetic Rough Set feature selection mechanism and a hybrid deep learning model. Rather than treating threat discovery and defensive mitigation as disconnected sequential tasks, the researchers designed an integrated, closed-loop paradigm structured around real-time identification, rapid multi-channel response, and coordinated defense. By fusing uncertainty-tolerant attribute reduction with global evolutionary search, the framework compresses redundant monitoring data while retaining essential discriminative patterns. The selected behavioral features are subsequently processed through a specialized neural sequence architecture combining multi-head self-attention and recurrent memory, allowing the defense framework to perceive immediate physical anomalies as well as slow-moving, distributed system compromises across the entire operating network.
The physical and logistical architecture of the photovoltaic endogenous security network encompasses five functional operational tiers: an initial data acquisition layer, a transmission and perception layer, a decentralized edge control layer, a centralized cloud decision-making layer, and a distributed local execution layer. Photovoltaic facilities continuously generate heterogeneous, non-uniform time series spanning electrical metrics such as operating voltage, current, power factor, and inverter status codes, alongside high-frequency communication packet parameters and local environmental readings. Because regional variations in equipment brands, solar irradiance, and electrical loads cause cyber-physical disturbances to diffuse along hierarchical pathways, the authors introduced Risk Propagation Graphs to model risk progression. Within these graph structures, individual network nodes symbolize discrete component operational states while directed edges represent propagation pathways. Mathematical edge weights represent state transition probabilities governed by learnable parameter matrices and nonlinear activation functions, capturing how silent incubations at peripheral edge units transition into localized anomalies and eventual system-wide operational disruptions.
Raw monitoring streams gathered from diverse sensor suites, including reference cells, thermocouples, solar radiometers, and multi-channel data acquisition devices, span twenty-six continuous and categorical feature dimensions characterized by nonlinear cross-correlations and high redundancy. To distill this complex data space into an optimized behavioral subset, the researchers formulated a specialized Genetic Rough Set mechanism. Standard rough set theory offers strong mathematical capabilities for analyzing fuzzy boundaries and incomplete operational measurements without requiring prior domain assumptions; however, standard heuristic reduction techniques frequently stall in local optima when applied to high-dimensional datasets. The researchers overcame this structural bottleneck by pairing rough set lower and upper approximations with an evolutionary genetic algorithm. In this hybrid optimization scheme, candidate attribute subsets are encoded as twenty-six-bit binary chromosomes, wherein individual bits designate whether a specific sensory parameter is selected or discarded during risk evaluation.
To balance classification precision against feature redundancy, the genetic algorithm operates on a composite fitness function that explicitly combines rough set dependency degree with a mathematical penalty for subset cardinality. In the experimental implementation, the population size was established at sixty individuals evaluated across a maximum of one hundred evolutionary generations, utilizing a crossover probability of 0.80 and an intergenerational mutation probability of 0.05. A redundancy penalty coefficient set at 0.30 prevented over-retention of redundant sensory channels. Parent chromosomes were selected through a roulette wheel selection mechanism, while elite retention preserved the highest-performing attribute combination across successive iterations. Evolution halted either upon reaching maximum generation thresholds or when best-fitness adjustments remained below 0.0001 for ten consecutive iterations. Through this evolutionary search, the initial twenty-six monitoring variables were successfully compressed into twelve highly discriminative features, primarily drawn from electrical operating measurements and communication traffic signals.
The refined twelve-dimensional feature vectors are ingested by a serial deep learning sequence architecture that couples a Transformer encoder with a gated recurrent unit network to track dynamic risk evolution. Multi-frequency input sequences are first synchronized within unified temporal windows, normalized using Z-score standardization, and smoothed with sliding windows to eliminate baseline distortion. Categorical event codes undergo one-hot transformation, while continuous operational parameters receive positional encodings before entering a shared embedding space protected by layer normalization and dropout regularization set at 0.40. Rather than executing parallel feature analysis, the architecture directs the embedded vectors through four self-attention heads with individual head dimensions of sixteen, establishing global associations across disparate operational, communication, control, and environmental layers. The resulting attention representations are immediately channeled into a sixty-four-unit gated recurrent unit layer, which preserves temporal memory and captures sequential state transitions before mapping the final hidden state through a fully connected softmax layer to yield categorical risk probabilities.
To translate automated risk classifications into immediate protective interventions, the researchers instituted a rule-linked defense response architecture coordinated by an adjustable confidence threshold and a high-speed Behavior-Risk Mapping Table. Built upon an indexed hash structure, the mapping table associates identified risk categories with specific rule quintuples defining rule identifiers, binding risk severity tiers, triggering behavioral patterns, executable response sets, and validity intervals. Once an output probability exceeds the predetermined confidence threshold, a Unified Response Scheduler activates a minimum-blocking scheduling algorithm that distributes tasks across edge and cloud execution channels based on operational priority and available channel capacity. Defenses range from edge-level physical disconnections and inverter power throttles to cloud alerts and user application warnings. To eliminate erroneous interventions stemming from transient sensor spikes, the system enforces a multi-confirmation window requiring consistent cross-frame threshold violations prior to executing high-impact defensive actions.
The experimental validation utilized a comprehensive hybrid dataset compiled from real distributed photovoltaic operational records, simulation-driven attack injections, and synthetic edge-interference anomalies. Authentic field logs accounted for 46.8% of the data corpus, incorporating voltage, current, inverter status, temperature, irradiance, and transmission metrics from operating plants. Simulated attack injections represented 38.6% of the dataset, introducing deliberate communication anomalies, false data injections, delayed commands, command replay sequences, identity spoofing, and privilege tampering ranging in duration from five to sixty seconds across varied disturbance intensities. Artificially synthesized edge anomalies accounted for the remaining 14.6%, reflecting low-frequency high-risk edge phenomena such as severe signal attenuation and burst packet drops. The compiled sequence dataset was split into training, validation, and testing partitions according to a 7:1:2 ratio, with five-fold cross-validation implemented during model training to guarantee generalizability.
Empirical testing on a dedicated workstation confirmed that the proposed Genetic Rough Set hybrid model achieved superior classification performance compared to conventional machine learning and recurrent baselines. On the standardized testing partition, the proposed model attained an overall classification accuracy of 94.27%, an F1-score of 93.64%, a precision rate of 93.41%, and a recall rate of 93.88%. By comparison, a standalone gated recurrent unit model achieved 93.56% accuracy, while a long short-term memory baseline recorded 92.84% accuracy, with both comparative networks exhibiting notably slower optimization convergence and greater vulnerability to early training instability. In temporal execution evaluations, the proposed architecture maintained an average processing time per frame of 8.25 milliseconds and achieved an average anomaly detection latency of 85 milliseconds, comfortably outperforming the conventional gated recurrent unit latency of 106 milliseconds and the long short-term memory latency of 113 milliseconds.
The coordinated defense architecture was subsequently evaluated across 3,200 simulated cyber-physical security events comprising communication anomalies, energy flow disruptions, and identity camouflage. Across these testing scenarios, the linked defense mechanism recorded an average response strategy trigger rate of 95.4% and an operational blocking success rate of approximately 89.6%, while restricting the false trigger probability across the entire linkage pipeline to 1.83%. The average execution latency for automated defense interventions reached 83 milliseconds, remaining well below the 100-millisecond operational safety threshold required for practical industrial deployment. System profiling verified that memory and processor resource consumption remained within manageable limits for commercial edge gateways and embedded field units, while tiered mapping reliably relegated mild electrical irregularities to low-level logging while escalating severe intrusions to automated command-interruption protocols.
To rigorously quantify the individual performance contributions of each architectural component, the investigators carried out systematic ablation trials across four distinct configurations: the complete proposed model, a variant retaining standard rough set reduction without genetic optimization, a model utilizing all original features without rough set selection, and an isolated recurrent model processing static feature inputs. The complete framework demonstrated superior accuracy alongside the lowest false alarm and false rejection rates, confirming that genetic search optimization prevents rough set reductions from settling into sub-optimal attribute spaces. Complete omission of rough set reduction triggered substantial degradation in classification accuracy, demonstrating the necessity of eliminating redundant noise in high-dimensional sensory feeds. The isolated static recurrent model exhibited the worst performance across all metrics, proving that capturing dynamic, time-dependent cross-layer correlations is essential for identifying progressive cyber threats.
Robustness and interpretability analyses further validated the operational stability of the proposed defense framework under challenging deployment conditions. When evaluated against an independent cross-scenario evaluation dataset containing novel, unseen combinations of communication latencies, command replays, and sensor perturbations, the model retained an accuracy of 92.74% and an F1-score of 92.35%. In targeted adversarial tests involving low-intensity stealth perturbations, constrained false data injection, and command replay sequences, the framework consistently maintained an F1-score exceeding 91% while keeping false trigger rates below 3%. Extraction of decision logic from the retained twelve-dimensional feature set confirmed clear physical interpretability, showing that concurrent increases in packet loss and latency map directly to communication disruptions, while electrical deviations occurring without corresponding solar irradiance shifts reliably signal false data manipulation.
While the experimental outcomes validate the efficacy of combining genetic rough set reductions with sequential attention models for photovoltaic infrastructure defense, the investigators noted specific boundaries in their current findings. A significant portion of the attack testbed relied on simulated mathematical injections and synthetic edge disturbances, which may not capture the full behavioral diversity of sophisticated human threat actors operating within production-scale power grids. Additionally, highly adaptive adversaries could potentially modify attack dynamics over time in response to observed defensive responses. Consequently, future research will focus on testing the framework against extensive industrial power-system intrusion datasets, refining online rule-updating mechanisms, and applying advanced neural model compression techniques to facilitate seamless deployment across resource-constrained photovoltaic hardware platforms.
Subject of Research: Dynamic risk identification and endogenous security defense for networked photovoltaic systems using genetic rough set fusion and temporal deep learning models
Article Title: Dynamic risk identification and defense for endogenous security networks in photovoltaic systems based on genetic rough set fusion mechanism
Article References: Su, W., Wang, S., Liu, D., Sun, X., & Xu, H. (2026). Dynamic risk identification and defense for endogenous security networks in photovoltaic systems based on genetic rough set fusion mechanism. Discover Internet of Things, 6(1), Article 142. https://doi.org/10.1007/s43926-026-00482-9
Image Credits: AI Generated
DOI: 10.1007/s43926-026-00482-9
Keywords: Photovoltaic systems, Endogenous security, Genetic rough set, Rough set theory, Genetic algorithms, Transformer encoder, Gated recurrent unit, Dynamic risk identification, Behavior-Risk Mapping Table, Unified Response Scheduler, Risk Propagation Graphs, Cyber-physical security, False data injection, Feature reduction, Industrial IoT security, Grid integration, Multi-head self-attention
News Source: Juliet Wilcox. (November 13, 2026). Genetic Rough Set Fusion Model Identifies Photovoltaic Grid Risks with High Accuracy. Scienmag.
We bring you the latest biotechnology news from best research centers and universities around the world. Check our website.
Enter your email address to subscribe to this blog and receive notifications of new posts by email.


Bioengineer.org © Copyright 2023 All Rights Reserved.
Login to your account below




Please enter your username or email address to reset your password.


Bioengineer.org © Copyright 2023 All Rights Reserved.

source

Posted in Renewables | Leave a comment

Solar Panel Recycling to open fifth PV recycling facility in California – PV Tech

Solar Panel Recycling to open fifth PV recycling facility in California  PV Tech
source

Posted in Renewables | Leave a comment

China Solar PV News Snippets: LONGi At TaiyangNews Flagship Conference & More – TaiyangNews

The High-Efficiency Solar Technologies 2026 Online Conference, TaiyangNews’ annual flagship conference, introduces a more fundamental parameter: where the contacts sit on the cell. Day 1 of the conference on November 11 focused on dual-sided contacting technologies.
Back-Contact technologies will take center stage on Day 2, on November 20, 2026. Zanliang Zhao, Product Marketing Expert at LONGi, will speak on the topic: From Technology Forest to Premium BC Modules with >25% Efficiency and Superior Reliability. The conference will run from 09:30 to 12:30 CET.
Registration is open and can be done for free here.
Energy storage system (ESS) solution provider RelyEZ Energy Storage Technology Co. Ltd. has listed on the Main Board of the Hong Kong Stock Exchange (SEHK) under stock code 9621, issuing 57.54 million H shares and raising gross proceeds of HKD 562.7 million. The company submitted its IPO application at the beginning of this year (see China Solar PV News Snippets).
The company provides utility-scale and commercial and industrial (C&I) energy storage systems, as well as software platforms, operations and maintenance (O&M), and power trading services.
The company reported that its revenue grew from RMB 434.6 million in 2023 to RMB 1.87 billion in 2025, while net profit rose from RMB 40.7 million to RMB 153.6 million over the same period. According to Frost & Sullivan data cited in the prospectus, RelyEZ ranked 10th in China’s ESS solutions industry by 2025 shipments, with 5.4 GWh and a 2.1% market share.
Of the net proceeds, the company has earmarked about 45% for hardware and software R&D, 25% for overseas expansion – including local teams, partnerships, and production opportunities – and 20% for a new factory in Wuzhen, Zhejiang province, with an estimated annual design capacity of around 10 GWh. Working capital and other general corporate purposes will be allocated the remaining 10%.
Fujian Province has published the results of its 2027 renewable energy mechanism price auction, setting a uniform mechanism price of RMB 0.388/kWh for all selected projects. Launched in October, the auction round offered 8.36 TWh of electricity volume across renewable technologies, with bids permitted between RMB 0.16/kWh and RMB 0.39/kWh.
The round allocated 3.322 TWh, entirely to solar projects. This comprised 19 centralized PV projects totaling 867 GWh and 38,004 distributed PV projects totaling 2.455 TWh.
In the previous 2026 mechanism price bidding, Fujian allocated 1.597 TWh to offshore PV at RMB 0.388/kWh and 661 GWh to all other new energy projects at RMB 0.35/kWh.
TÜV SÜD has released a white paper establishing a five-level maturity framework for the grid-forming capabilities of energy storage equipment and systems. Ranging from L0 to L4, the framework covers conventional grid-following, local voltage grid-forming, regional grid-forming support, conditional system-wide grid-forming, and advanced system-wide grid-forming, assessing the actual contribution of equipment and site-level systems to the power system.
On the same day, TÜV SÜD awarded the first L4 certification, the highest level under the framework, to Huawei Digital Power’s Smart String Grid-Forming ESS Platform for its capabilities in system support, dynamic stability, and coordinated restoration.
Last month, Huawei Digital Power’s solar-storage AI agent passed CAICT security assessment (see China Solar PV News Snippets).
Hunan-based energy storage developer Zhongbao Hengyuan Technology has signed an investment agreement with the Hongjiang High-tech Zone administration in Hongjiang City, Hunan Province, for a planned 200 MW/800 MWh independent energy storage project.
The single independent storage facility combines two electrochemical technologies: 175 MW/700 MWh of lithium iron phosphate (LFP) storage and 25 MW/100 MWh of semi-solid-state battery storage.
TaiyangNews 2024

source

Posted in Renewables | Leave a comment

Coal plant failure, not solar PV, triggered Sri Lanka’s latest blackout – pv magazine Global

The cause of Sri Lanka’s nationwide black occurred on Oct. 17 was the the loss of 187 MW of electricity from a coal power plant and not the high solar PV penetration as initially thought.
This emerges from a preliminary investigation report submitted by the National System Operator (NSO) to the Public Utilities Commission of Sri Lanka (PUCSL), which explicitly identifies the sudden loss of generation from Lakvijaya Coal Power Plant Unit 1 (LVPP Unit 01) as the initiating event of the blackout.
“LVPP Unit 01 rapidly de-loaded from the unit net generation of 187 MW to 5 MW within 450 ms,” the authors of the report state, noting that grid frequency fell from 49.906 Hz to 48.75 Hz within two seconds.
The unit has a capacity of 300 MW and is located at the 900 MW Norochcholai Power Station in Puttalam, in the country’s North Western Province.
The report does not fully explain why the coal unit lost output or whether distributed PV behaviour contributed to the cascading failure.
Following the blackout, the NSO instructed all PV system owners to disconnect their installations from the grid. The decision appeared to have been informed by a previous nationwide blackout on Feb. 9, 2025, when the Ceylon Electricity Board (CEB) identified high solar PV penetration as a major contributing factor.
According to a CEB investigation published in April 2025, the blackout was triggered at noon by a fault at the Panadura grid substation. At the time, solar PV accounted for more than 50% of electricity demand, leaving the grid with insufficient system inertia to withstand the disturbance. The resulting voltage drop and cascading disconnections led to a nationwide blackout.
At the time, the authorities also instructed rooftop solar system owners to disconnect their installations from the grid during restoration efforts.
Sri Lanka’s rooftop PV capacity reached 1.94 GW by the end of 2025, following rapid growth in installations and generation.
Sri Lanka’s daily electricity demand stood at approximately 58 GWh to 60 GWh in March 2026, equivalent to an average continuous power requirement of around 2,400 MW to 2,500 MW.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].
Comments
Please login to comment
Day 1 | Europe’s Solar and Storage Markets 2027: What works where?
Day 2 | Solar + Storage Co-location: Three markets, three business cases
Day 3 | Solar Quality: Which technical risks still need better answers?
Day 4 | Cybersecurity and Procurement: What can European solar projects source in 2027 and beyond?
The new issue of pv magazine Global is out now!
Available in print and digital – get your copy today!
Monday, November 23, 2026
11:00 am – 12:00 pm CEST, Berlin, Paris, Madrid
Wednesday, November 25, 2026
7:00 am – 8:00 am CET, Berlin, Paris, Madrid
Tuesday, November 24, 2026
3:00 pm – 4:00 pm CET, Berlin, Paris, Madrid
As a media partner of Genera 2026, pv magazine will organize and moderate a session in Spanish in Madrid, during International Electrification and Decarbonization Week.
Your guide to the U.S. solar and storage market!
Explore the free RE+ 26 Special Edition.
Book your 2027 advertising opportunities now!
Amplify your brand presence with the leading trade media platform for the solar and storage industry.
Reach your target audience across 13 websites in 7 languages, magazines, daily newsletters, industry events and more.
Tuesday, December 15, 2026
10:00 am – 11:00 am CET, Berlin, Paris, Madrid

You have no items in your basket.

source

Posted in Renewables | Leave a comment

Reflect Orbital raises US$73.5 million to advance space-based solar reflector technology – PV Tech

Reflect Orbital raises US$73.5 million to advance space-based solar reflector technology  PV Tech
source

Posted in Renewables | Leave a comment

Korea Zinc Forms Solar Recycling Venture – Businesskorea

source

Posted in Renewables | Leave a comment

Skyworth Group Updates Proposed Buyback, Photovoltaic Distribution and Delisting – TipRanks

Skyworth Group Updates Proposed Buyback, Photovoltaic Distribution and Delisting  TipRanks
source

Posted in Renewables | Leave a comment

Australian developer seeks suppliers for 450 MW BESS and solar project – ESS News

Renewables developer Central Queensland Power (CQP) has launched an expressions of interest (EOI) process seeking suppliers for the proposed Wooderson solar and battery energy storage project being developed near the Queensland industrial hub of Gladstone.
The project, planned for a site at Mount Alma, approximately 40 km southwest of Gladstone, includes a 450 MW solar facility along with a 450 MW DC-coupled battery energy storage system (BESS) with up to 3,600 MWh of storage.
CQP, a joint venture between Sydney-based Energy Estate and the Australian arm of United Kingdom-headquartered clean energy company RES, has now opened an EOI through Gateway by ICN.
Anticipated supply chain requirements span civil and electrical balance of plant works, equipment supply, high-voltage infrastructure, transport, logistics, commissioning and skilled labour.
The developer is aiming to secure the supply of about 980,000 solar panels, a 450 MW BESS, substation, switching yard, 275 kV transmission connection, electrical infrastructure, access roads and construction facilities.
Procurement for lead construction contractors is expected to progress later this year with construction currently targeted for the first quarter of 2028, with completion expected by December 2030, subject to approvals, financing and investment decisions. Small works procurement is expected to begin approximately six to nine months before construction.
CQP estimates the Wooderson project will generate up to 680 jobs during the construction phase, and, once operational, would deliver about 1,300 GWh of renewable energy into the National Electricity Market a year.
The project recently secured the first of three required planning approvals, covering a section of the proposed overhead transmission line within the Callide Infrastructure Corridor State Development Area (CICSDA). The project also holds an earlier environmental clearance from the Australian government, which determined it was not a controlled action under the EPBC Act.
The project needs to also go through the Queensland government State Assessment and Referral Agency (SARA) for the solar farm and ancillary infrastructure including the BESS, and the Gladstone Regional Council for sections of the proposed overhead transmission line and switchyard located outside the CICSDA.
From pv magazine Australia
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.
Your email address will not be published. Required fields are marked *

source

Posted in Renewables | Leave a comment

Benin signs agreement with developer for largest-ever solar PV plant – African Energy

A leading developer has signed a MoU with Cotonou to develop what would be Benin’s largest-ever solar PV plant.
Subscriber only content
An active subscription is required to view this article
Subscribe to African Energy
View subscription options
Tagged with:
Pin Power
Pin Benin
African Energy is a brand of
©Copyright 2026 African Energy
Head Office
4 Bank Buildings
Station Road
Hastings
TN34 1NG
United Kingdom

T: +44 (0)1424 721667

source

Posted in Renewables | Leave a comment

Hybrid Optimization Framework Enhances Efficiency and Management in Solar Systems – Bioengineer.org

Hybrid Optimization Framework Enhances Efficiency and Management in Solar Systems
Solar photovoltaic systems frequently struggle with nonlinear operating characteristics driven by fluctuations in solar irradiance and temperature. Inadequate coordination between power generation, battery storage systems, and grid interactions often leads to diminished energy utilization and poor economic performance. To address these challenges, researchers have introduced a novel hybrid framework that combines the Honey Badger Algorithm with a Dynamic Temporal Fusion Graph Neural Network, known as HBA-DTFGNN, to integrate maximum power point tracking and energy management within solar installations.
The Honey Badger Algorithm serves as a crucial component by optimizing maximum power point tracking control parameters. This allows the system to achieve rapid and accurate maximum power extraction even when operating conditions vary significantly. By refining these parameters, the framework minimizes the negative impacts of unpredictable environmental changes that typically hinder traditional tracking methods in photovoltaic systems.
Complementing this, the Dynamic Temporal Fusion Graph Neural Network is designed to capture complex temporal dependencies and critical interactions among photovoltaic generation, battery storage capacity, and grid variables. This layer provides the necessary support for adaptive energy management, ensuring that energy is stored or distributed effectively based on real-time system state and grid demands, thereby enhancing overall operational intelligence.
The proposed framework was subjected to rigorous evaluation within a MATLAB environment under a variety of operating conditions to benchmark its performance against established tracking and optimization methods. The experimental results demonstrate a maximum power point tracking efficiency of 98.74 percent, accompanied by a settling time of 25 milliseconds. The performance metrics further show an overshoot of 0.8 percent and a ripple level restricted to ± 0.5 percent, illustrating high stability and precision.
Beyond technical efficiency, the suggested framework yields significant economic benefits by achieving a cost of energy at 0.073 dollars per kilowatt-hour. This cost-effectiveness indicates improved energy utilization compared to existing approaches. Ultimately, these results validate the HBA-DTFGNN method as a highly accurate solution for power tracking, effective in energy coordination, and robust in overall photovoltaic system performance, offering a pathway toward more sustainable and economically viable solar energy integration.
Subject of Research: Solar Photovoltaic Energy Management
Article Title: Hybrid Optimization Framework for Adaptive MPPT and Enhanced Energy Management in Solar Photovoltaic Systems
Article References: R. R, R. G., Kathirvel, C., Kamarajugadda, K. K., & Selvarani, N. (2026). Hybrid Optimization Framework for Adaptive MPPT and Enhanced Energy Management in Solar Photovoltaic Systems. International Journal of Computational Intelligence Systems. https://doi.org/10.1007/s44196-026-01710-4
Image Credits: AI Generated
DOI: 10.1007/s44196-026-01710-4
Keywords: Solar Photovoltaic Systems, Maximum Power Point Tracking, Honey Badger Algorithm, Dynamic Temporal Fusion Graph Neural Network, Energy Management, Renewable Energy Efficiency, Power Extraction, MATLAB Simulation, Grid Interaction, Battery Storage, Energy Utilization, Economic Performance, Computational Intelligence, Irradiance Variation, Temperature Variation
News Source: Faith Mcneil. (November 16, 2026). Hybrid Optimization Framework Enhances Efficiency and Management in Solar Systems. Scienmag.
We bring you the latest biotechnology news from best research centers and universities around the world. Check our website.
Enter your email address to subscribe to this blog and receive notifications of new posts by email.


Bioengineer.org © Copyright 2023 All Rights Reserved.
Login to your account below




Please enter your username or email address to reset your password.


Bioengineer.org © Copyright 2023 All Rights Reserved.

source

Posted in Renewables | Leave a comment