Tag Archives: Telangana

Solar Power Price drops to ₹3.15 per KWh in latest round of bidding

French company Solairedirect, which won the rights to put up 250 MW of solar plants and sell power to NTPC Ltd at a record-low tariff of Rs 3.15 a kWhr in the auction process that concluded on Tuesday, has created … Continue reading

Posted in Renewables | Tagged , , , , , , , , , , , , , , , , | Leave a comment

Grid Parity of Solar PV Rooftop Systems for the Commercial and Industrial Sectors

  Grid Parity of Solar PV Rooftop Systems for the Commercial and Industrial Sectors: New Delhi: The Energy and Resources Institute. 172 pp. Amazing Compilation of Details and a must read Grid Parity_SolarPV Rooftop

Posted in Commercial, DISCOM, Grid Connected, Ministry of Power, MSEDCL, Net Metering, PV, Renewables, Residential, Rooftop, Solar, Solar Policy, Solar PV, Tamil Nadu, Telangana, Transmission and Distribution | Tagged , , , , , , , , , , , | Leave a comment

Commissioning Status of Grid Connected Solar Power Projects under JNNSM upto 31st March 2016

Commissioning Status of Grid Connected Solar Power Projects under JNNSM Sr. No. State/UT Total cumulative commissioned capacity till 31-03-15 (MW) Total commissioned capacity during 2015-16 (MW) Total cumulative commissioned capacity till 31-03-16 (MW) 1 Andhra Pradesh 137.852 435.114 572.966 2 Arunachal Pradesh 0.025 0.240 0.265 3 Bihar 0 5.100 … Continue reading

Posted in Grid Interactive Distributed Solar Energy Systems, India, JNNSM, Power Generation, PV, Renewables, Solar | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Solar tariff trend in India from 2010-2016

Trend of Solar Tariff Previous bid results     Year Capacity on Offer (MW)   Highest Bid (Rs./KWh)   Lowest (Rs./KWh)   Weighted Avg. Price (Rs./KWh) NSM Batch 1 Dec’10 150 12.76 10.95 12.16 NSM Batch2 Dec’11 350 9.39 7.49 … Continue reading

Posted in Batch I, Batch II, Government, JNNSM, Phase I, Phase II, Power Generation, PV, Renewables, Solar, Solar Parks, Tranche I | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Commissioning Status of Grid Connected Solar Power Projects under JNNSM in 2015-16

Commissioned in 2015-16 as on 31/01/2016 Commissioning Status of Grid Connected Solar Power Projects under JNNSM in 2015-16   Sr. No.     State/UT Total MNRE Projects MW   State Policy MW   RPO MW   REC Scheme MW Pvt. … Continue reading

Posted in Government, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Karnataka, Madhya Pradesh, Maharashtra, New Delhi, Power Generation, Punjab, PV, Rajasthan, Renewables, Solar, Telangana, Uttar Pradesh | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Commissioning Status of Grid Connected Solar Power Projects as on 31 Jan 2016

Cumulative Commissioned as on 31-01-2016  Commissioning Status of Grid Connected Solar Power Projects     Sr. No.     State/UT   Total MNRE Projects MW   State Policy MW     RPO MW   REC Scheme MW   Pvt. Initiative … Continue reading

Posted in Andhra Pradesh, Bihar, Government, Grid Interactive Distributed Solar Energy Systems, Gujarat, Haryana, India, JNNSM, Karnataka, Madhya Pradesh, Maharashtra, Ministry of Power, MNRE, New Delhi, Power Generation, Punjab, PV, Rajasthan, Renewables, Solar, Solar PV, Telangana, Uttar Pradesh | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Telangana solar power: SkyPower offers lowest bid; ACME Group bags 446 MW

SkyPower South East Asia has come up with the lowest bid for supplying solar power to Telangana, with an offer of ₹5.17 per unit for one project of 50 MW and ₹5.26 for three projects of 50 MW each.The ACME … Continue reading

Posted in Climate Change, Commercial, DISCOM, Grid Connected, India, Power Generation, PV, Renewable Purchase Obligation, Renewables, Solar, Solar Parks, Solar Policy, Telangana, Telangana | Tagged , , , , , , , , , , , , , , , , , , , , | Leave a comment

TELANGANA SOLAR POWER POLICY 2015

APPLICABILITY OF THE POLICY This solar policy shall be applicable for the following solar projects set up within the state- 1) Solar Power Projects (SPPs) a) Grid connected solar power projects based on both Photo Voltaic (PV) as well as … Continue reading

Posted in DISCOM, Government, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Net Metering, Power Generation, Renewables, Residential, Rooftop, Solar, Solar Parks, Solar Policy, Solar Pumps, Telangana, Telangana, Transmission and Distribution | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Telangana issues RFS for procuring 2000 MW Through Solar Power Plants

Request for Selection (RFS) document for selection of Solar PV developers in the State of Telangana for procuring 2000 MW through tariff based competitive bidding process RFS (Bid) No. TSSPDCL/01/LTSPP/2015 dated 01 April 2015 Group 1 Bids Bidders injecting into … Continue reading

Posted in DISCOM, Grid Connected, India, Renewables, Solar, Solar Policy, Telangana | Tagged , , , , , , , , , , | Leave a comment

Telangana turns to solar power – Issues RFS for 500 MW

The Telangana government is placing its bets on the sun to help it tide over the energy crisis. With the state enjoying nearly 300 days of sunshine each year, the Telangana southern and northern power distribution companies have decided to … Continue reading

Posted in DISCOM, Grid Connected, India, PV, Renewables, Solar, Telangana, Transmission and Distribution | Tagged , , , , , , , , , , , , | Leave a comment