Tag Archives: State Electricity Regulatory Commission

Implementation of Project for setting up of 15,000 MW of Grid-connected Solar PV Power plants through NTPC Ltd. / NTPC Vidyut Vyapar Nigam Limited (NVVN) under National Solar Mission

The scheme will be implemented through the NTPC / NVVN (the power trading arm of NTPC Limited) under Ministry of Power. The scheme envisages setting up of Grid-connected solar PV power plants of 15,000 MW aggregate capacity in three tranches: … Continue reading

Posted in Batch I, Batch II, Government, Grid Connected, India, JNNSM, Manufacturing, Ministry of Power, NTPC, NVVN, Phase I, Phase II, Power Generation, PV, Renewables, Solar, Solar Parks, Solar Policy, Tranche I, Transmission and Distribution | Tagged , , , , , , , , , , , , , , , , , , , , ,

Kerala Cabinet approves Solar Energy Policy

Ritesh – Finally! The Kerala Cabinet has approved a Solar Energy Policy that seeks to raise installed capacity of the solar sector to 500 MW by 2017 and 1,500 MW by 2030. The mission is to contribute to long-term energy … Continue reading

Posted in Commercial, Grid Connected, PV, Renewables, Solar | Tagged , , , , , , , ,