Tag Archives: Solar PV Plants

Implementation of Scheme for setting up over 300 MW of Grid-Connected & Off-grid Solar PV Power Projects by Defence Establishments under Ministry of Defence and Para Military Forces (under MHA) with Viability Gap Funding (VGF) under Phase-II/III of JNNSM during 2014-15 and onwards

Applicability: The capacity  of 300 MW of Grid-Connected  and off-Grid  Solar PV power projects,   will  be  set  up  in  various  Establishments  of  Ministry  of  Defence  i.e Establishments of Army,  Navy, Air Force, Ordnance Factory  Board,  Defence Laboratories and Defence PSUs … Continue reading

Posted in Armed Forces, Crystalline, Defence Ministry, Government, Grid Interactive Distributed Solar Energy Systems, Grid Storage, India, MNRE, PV, Renewables, Rooftop, Solar, Solar Parks, Subsidy, Thin Film, VGF | Tagged , , , , , , , , , , , , , , , , ,

MNRE abolish’s affidavits and promotes self-certification with immediate effect for Solar Power Developers

In a bid to reduce onerous paperwork requirements, MNRE has  immediately abolished the need for Ministry’s OM  No.24/0 1/20 13-14/NSM dated  29.04.2013 regarding submission of an affidavit by the SPD on a hundred  rupees stamp paper. Click here for the entire … Continue reading

Posted in Commercial, Grid Connected, MNRE, PV, Regulations and Procedures, Renewables, Solar | Tagged , , , , , ,

BIDDING RESULTS : JNNSM Phase 2 Batch 1 : 750 MW Solar PV Grid Connected Projects

Solar Energy Corporation of India (SECI) opened bids for the allocation under batch one of phase two of the National Solar Mission (NSM). A total of 68 bids were received from 58 developers, covering 122 projects with a cumulative capacity … Continue reading

Posted in Batch I, Grid Connected, JNNSM, MNRE, Phase II, PV, Renewables, SECI, Solar, Subsidy | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

JNNSM Phase-II, Batch-I: Notification regarding Financial Bid opening and List of bidders found eligible for financial bid opening

SOLAR ENERGY CORPORATION OF INDIA NEW DELHI-110017 No. SECI/JNNSM/P-2/B-1/TC-Eval/2014                                                       Dated: 15th Feb, 2014 JNNSM Ph-II, B-I: Notification regarding Financial Bid opening and List of bidders found eligible for financial bid opening This has reference to the Request for Selection (RfS) … Continue reading

Posted in Batch I, JNNSM, MNRE, Phase II, Renewables, SECI, Solar | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

PV Power Plants 2012 – Industry Guide

Today’s PV market is now completely different to that of one year ago when the previous edition of this brochure was published. Thanks to a dramatic fall in the price of solar modules and an equally significant drop in the … Continue reading

Posted in Crystalline, Publications, PV, Renewables, Thin Film | Tagged , , , , , , , , , , ,