Links
WebSite
-
Join 5,060 other subscribers
Solar Now
Follow me on Twitter
My TweetsTop Posts & Pages
- Coal 2022 Analysis and forecast to 2025
- Interview with ROMAIN RICHE - MESIA International Business Director
- บ.จีนแห่ลงทุน‘แผงโซลาร์เซลล์’ในไทย หวังเป็นฐานผลิตหลังยุโรปโต้ทุ่มตลาด
- About Us
- Charanka - Gujarat Solar Park
- MSEDCL Net Metering Procedure and Guidelines
- Planning and prospects for renewable power: Eastern and Southern Africa
- Webinar Reliable Solar Pv Structure Design and Innovation
-
New Posts
- Solar Energy Policyin Uzbekistan: A Roadmap
- Southeast AsiaEnergy Outlook 2022
- Grid Integration ofElectric VehiclesA manual for policy makers
- Coal 2022 Analysis and forecast to 2025
- Mobilising Renewable Energy Projects in Small Island States
- Naturgy participa en el consorcio europeo NextFloat para acelerar el desarrollo industrial de la energía eólica marina
- RWE opera aerogeneradores en un dique
- Coal Analysis and forecast to 20242021
- An Energy SectorRoadmap to NetZero Emissions inIndonesia
- Security of CleanEnergy Transitions
Calendar
May 2023 M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Archives
Categories
Meta
- Andhra Pradesh
- Bioenergy
- Biomass
- capacity
- China
- Coal
- Concentrated Solar Power
- CSP
- Electricity
- Electricity generation
- energy
- Energy Storage
- environment
- First Solar
- Gas
- Generation
- Geothermal
- Germany
- Globally
- Government
- Grid
- Gujarat
- Hydro
- Hydropower
- India
- Japan
- Jawaharlal Nehru National Solar Mission
- JNNSM
- Karnataka
- Maharashtra
- Ministry of New and Renewable Energy
- mnre
- Nuclear
- Off-grid
- Oil
- Photovoltaic
- Photovoltaic system
- policy
- Power
- power generation
- power plants
- PV
- Rajasthan
- REC
- Renewable
- Renewable Energy
- Renewable Energy Certificates
- Renewables
- Solar
- solar blog india
- Solar cells
- Solar Development
- solar electricity
- solar energy
- solar hydrogen
- Solar India
- solar industry
- Solar Modules
- Solar Panel
- Solar Panels
- Solar Policy
- Solar Power
- solar power plants
- solar power projects
- Solar projects
- Solar PV
- solar renewable energy
- Solar Rooftop
- solar sector
- solar systems
- Tamil Nadu
- technology
- united states
- Wind
- Wind Power
Blog Followers
Tag Archives: Viability Gap Funding
Centre offers 50 paise/unit support for solar projects using locally produced equipment
The Centre has offered a viability gap support of ₹70 lakh per MegaWatt (MW) for solar projects that will be built using domestically sourced cells and modules. This support will be implemented through the Central Public Sector Undertaking (CPSU) Scheme … Continue reading
Implementation of scheme for setting up over 2,000 MW of Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-III of Phase II of the JNNSM.
The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, has given its approval for setting up of over 2,000 MW of Grid-Connected Solar PV Power Projects on Build, Own and Operate basis by Solar Power … Continue reading
Posted in Batch III, Crystalline, Government, Grid Interactive Distributed Solar Energy Systems, India, JNNSM, Ministry of Finance, Ministry of Power, MNRE, News, NTPC, NVVN, Phase II, Power Generation, Prime Minister, PV, Renewables, Solar, Solar Parks, Solar Policy, Thin Film, VGF
Tagged 2000MW, DCR, Domestic Content Requiremnt, Narendra Modi, National Clean Energy Fund, NCEF, SECI, Solar PV, VGF, Viability Gap Funding
Leave a comment
Nearly half of capacities recently bid under JNNSM to face the heat
Following delays in signing power purchase agreements (PPAs) under various state solar policies, developers have shifted focus to solar projects initiated under the Central Government’s National Solar Mission which received bids nearly three times the capacity on offer. However, Crisil … Continue reading
Posted in Anti-Dumping, Batch I, JNNSM, Manufacturing, MNRE, Phase II, PV, Renewables, Solar, Subsidy, Transmission and Distribution
Tagged Crisil Research, DCR, Domestic Content Requirement, JNNSM, mnre, Power purchase agreements, SECI, solar power projects, VGF, Viability Gap Funding
Leave a comment
Standard PPA and VGF Securitization Agreement for JNNSM Phase II Batch I
As of 20th December Corrigendum-final-VGF_750MW_Guidelines_for-grid-solar-power-projects Clarification_amendment-in-final-VGF_750MW_Guidelines_for-grid-solar-power-projects Latest Documents as of 12 Dec 2013 Amendments in the RfS document-01 JNNSM Phase II Batch I dated 30th November, 2013 Standard Power Purchase Agreement-JNNSM Phase II Batch I-Final (V01) dated 30th November, 2013 Clarifications on … Continue reading
Revised Draft Guidelines for setting up of 750 MW Grid Solar PV power projects with Viability Gap Funding (VGF) under Jawaharlal Nehru National Solar Mission (JNNSM), Phase-II, Batch-I.
No. 29/5/2012-13/JNNSNM Government of India Ministry of New and Renewable Energy Solar Power Division Dated: 4/10/2013 Subject: Revised Draft Guidelines for setting up of 750 MW Grid Solar PV power projects with Viability Gap Funding (VGF) under Jawaharlal Nehru National … Continue reading
Posted in Crystalline, Grid Connected, JNNSM, Phase II, PV, Renewables, Solar, Thin Film
Tagged Draft Guidelines, energy, Government of India, Grid Solar PV power, India, Jawaharlal Nehru National Solar Mission, Ministry of New and Renewable Energy (India), Photovoltaic system, Revised Draft Guidelines, Solar Power, Southeast European Cooperative Initiative, VGF, Viability Gap Funding
1 Comment