Tag Archives: solar blog india

Corporate Renewable PPAs in India:Market & Policy Update January 2021

More and more companies are procuring renewable power for their operations to help manage their electricity costs while contributing to corporate carbon emissions reduction targets. In India, the main drivers for many companies to do so are rising electricity tariffs … Continue reading

Posted in Coal, Electric and Hybrid Vehicles, Finance, India, News, Policy, Power Generation, PV, Renewables, Solar, Solar Policy, Solar PV | Tagged , , , , , , , , , , , , | Leave a comment

India Energy Outlook 2021

India has seen extraordinary successes in its recent energy development, but many challenges remain, and the Covid‐19 pandemic has been a major disruption. In recent years, India has brought electricity connections to hundreds of millions of its citizens; promoted the … Continue reading

Posted in Biomass, Electric and Hybrid Vehicles, Energy Efficiency, Greenhouse Gases, India, Nuclear, Off-grid, Power Generation, Renewables, Solar | Tagged , , , , , , , , , , , , | Leave a comment

Renewable Energy Policies in a Time of Transition: Heating and Cooling

Reducing the use of fossil energy for heating and cooling remains one of the biggest challenges of the energy transition. Heating and cooling needs – including those for space heating and cooling in buildings, domestic hot water, cooking, industrialprocess heat, … Continue reading

Posted in Electric and Hybrid Vehicles, Energy Efficiency, Energy Storage, Fossil Fuel, Grid Interactive Distributed Solar Energy Systems, GST, India, Solar BOOT, Solar PV, Storage | Tagged , , , , , , , , , | Leave a comment

Commissioning Status of Grid Connected Solar Power Projects under JNNSM in 2015-16

Commissioned in 2015-16 as on 31/01/2016 Commissioning Status of Grid Connected Solar Power Projects under JNNSM in 2015-16   Sr. No.     State/UT Total MNRE Projects MW   State Policy MW   RPO MW   REC Scheme MW Pvt. … Continue reading

Posted in Government, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Karnataka, Madhya Pradesh, Maharashtra, New Delhi, Power Generation, Punjab, PV, Rajasthan, Renewables, Solar, Telangana, Uttar Pradesh | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION (PSERC) Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2015-16

Levellised Fixed Cost (₹/kWh) Variable Cost (FY 2015-16) (₹/kWh) Applicable Tariff Rate (₹/kWh) Benefit of Accelerated Depreciation, if availed (₹/kWh) Net Applicable Tariff Rate upon adjusting for Accelerated Depreciation benefit (3-4) (₹/kWh) 1 2 3 4 5 Biomass Power Projects(other … Continue reading

Posted in Biofuels, Biomass, Commercial, CSP, DISCOM, Grid Interactive Distributed Solar Energy Systems, Hydro, India, Industrial, Punjab, PV, Renewables, Solar, Solar Parks, Solar Policy, Wind | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Joint Regulatory Commission for Goa and Union territories (JERC) has determined the solar tariff for ground-mounted and rooftop solar projects

Tariff is applicable for projects in the State of Goa and the Union Territories of Andaman and Nicobar Islands, Chandigarh, Dadra & Nagar Haveli, Daman & Diu, Lakshadweep, and Puducherry. Click Here for the Full document

Posted in Climate Change, DISCOM, Government, India, JERC, Ministry of Power, MNRE, Net Metering, PV, Renewables, Residential, Rooftop, Solar, Solar Policy | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Implementation of Scheme for setting up over 300 MW of Grid-Connected & Off-grid Solar PV Power Projects by Defence Establishments under Ministry of Defence and Para Military Forces (under MHA) with Viability Gap Funding (VGF) under Phase-II/III of JNNSM during 2014-15 and onwards

Applicability: The capacity  of 300 MW of Grid-Connected  and off-Grid  Solar PV power projects,   will  be  set  up  in  various  Establishments  of  Ministry  of  Defence  i.e Establishments of Army,  Navy, Air Force, Ordnance Factory  Board,  Defence Laboratories and Defence PSUs … Continue reading

Posted in Armed Forces, Crystalline, Defence Ministry, Government, Grid Interactive Distributed Solar Energy Systems, Grid Storage, India, MNRE, PV, Renewables, Rooftop, Solar, Solar Parks, Subsidy, Thin Film, VGF | Tagged , , , , , , , , , , , , , , , , , | Leave a comment

Natural Group Presentation at SolarTech – Solar Energy Policy July 2014 – Next Steps for Solar

Click here for the entire presentation Natural Group_Presentation at SolarTech – Solar Energy Policy July 2014 My presentation at Solartech 2014 encompassed the next steps for Solar in India moving forward. A few suggestions include A. Focus has to be … Continue reading

Posted in Commercial, DISCOM, Grid Connected, Presentations, Renewables, Ritesh Pothan, Solar, Transmission and Distribution | Tagged , , , , | Leave a comment

NSEFI Letter to SECI and MNRE regarding Issues with DCR category projects under JNNSM Phase II, Batch I

Ref. No.: NSEFI/08/MNRE/2014 Date: March 24, 2014 Shri Tarun Kapoor, I. A. S., Jt. Secretary, Government of India, Ministry of New and Renewable Energy, Block-14, CGO Complex, Lodhi Road, New Delhi-110 003, India Dear Sir, Subject: Domestic Content Requirement (DCR) … Continue reading

Posted in Batch I, Commercial, Grid Connected, JNNSM, MNRE, Phase II, Power Generation, PV, Renewable Purchase Obligation, Renewables, SECI, Solar, Subsidy | Tagged , , , , , , , , , , , , | 3 Comments

Tamil Nadu Solar Consultation Meeting On 23.11.12 2 4.30 pm With Solar Power Developers / Bidders Points Discussed

tamil-nadu-consultation-meeting-on-23-11-12-2-4-30-pm.pdf It is proposed by TANGEDCO to procure 1000 MW of solar power from the solar power developers / bidders through competitive bidding route. • Capacity requirement is 1 MW and above. • EMD is Rs.7 lakhs per MW in … Continue reading

Posted in PV, Renewables, Solar, Tamil Nadu | Tagged , , , , , , , , , | Leave a comment