Tag Archives: Ministry of New and Renewable Energy

CEEW Study on Impact of Safeguards Duty policy brief 24th June 2019

CEEW-Impact-of-Safeguards-Duty-policy-brief-24Jun19 Executive Summary i 1. Introduction Under what conditions can countries impose safeguard duties to protect their domestic industries? 2.1  The WTO regime on safeguard duties 2.2  The Indian regime on safeguard duties The road to the imposition of safeguard … Continue reading

Posted in India, Renewables | Tagged , , , , , , | Leave a comment

New MNRE Guidelines for Solar Manufacturers to Keep Project Quality in Check

The Ministry of New and Renewable Energy (MNRE) has issued a set of guidelines to be followed by solar manufacturers for models of modules that will be utilized in government-owned projects and those set up for the sale of electricity to … Continue reading

Posted in Government, India, JERC, Policy, Regulations and Procedures, Renewables | Tagged , , , , , , , , , , , , , , , | Leave a comment

India slaps anti-dumping duties on solar EVA sheets

India’s Directorate General of Foreign Trade (DGTR) has concluded that duties ranging from $537 to $1,559/metric ton will be needed to offset the impact of imports of solar ethylene vinyl acetate (EVA) sheets from China, Malaysia, Saudi Arabia and Thailand. … Continue reading

Posted in BackSheet, Cells & Modules, Climate Change, Crystalline, India, Manufacturing, PV, Renewables, Solar | Tagged , , , , , , , , , , , , , , | Leave a comment

SoftBank, Actis, and CDC Group Companies Win SECI’s 750 MW Solar Auction

The Solar Energy Corporation of India (SECI) has auctioned 750 MW of grid-connected solar photovoltaic (PV) capacity to be developed at the Kadapa Solar Park in the state of Andhra Pradesh. The capacity was tendered by SECI in January 2018 under … Continue reading

Posted in Andhra Pradesh, Crystalline, Grid Connected, India, Power Generation, PV, Renewables, Solar | Tagged , , , , , , , , , , , , | Leave a comment

India won’t levy duty on solar gear imports

Bengaluru: The government has decided not to impose safeguards duty on solar equipment from China and Malaysia, overruling the directorate general of safeguards’ recommendation of a 70% levy that had delighted local manufacturers but alarmed developers who felt that the … Continue reading

Posted in Anti Dumping Duty, Anti-Dumping, Cells & Modules, CERC, India, PV, Renewables, Solar, Solar PV | Tagged , , , , , , , , , , , , , | Leave a comment

Govt amends solar bidding norms, developers can now pass on duty hike

The government has amended solar bidding norms, allowing developers to pass on the burden of any increase in duties on solar equipment to discoms, ending the industry’s apprehensions about likely impact of possible anti-dumping and safeguard duties on imported equipment. … Continue reading

Posted in Cells & Modules, India, JNNSM, Ministry of Power, MNRE, PV, Renewables, Solar, tax exemption | Tagged , , , , , , , , , , | Leave a comment

Historic Solar Prices till May 2017, now at Rs. 2.44 per KWh

Posted in Government, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, JNNSM, Karnataka, Madhya Pradesh, New Delhi, Phase I, Phase II, Punjab, Rajasthan, Renewables, Solar, Solar Parks, Solar PV, Telangana, Uttar Pradesh | Tagged , , , , , , , , | 1 Comment

MNRE does not sanction projects to Channel Partners or release subsidy directly to users. The release subsidy is through State Nodal Agencies (SNAs) and other Government Agencies or SECI. (Dr. G Prasad) Scientist-F/ Director 01.03.2017

Notice The Ministry is in receipt of applications/representation from general public for release of subsidy against the Rooftop Solar Systems installed by MNRE empanelled channel partners or new entrepreneurs without any prior sanction/approval from MNRE/SNAs. It has been observed that … Continue reading

Posted in Climate Change, India, MNRE, PV, Renewables, Rooftop, Rural Lighting, Solar, Subsidy | Tagged , , , , , , , , , , , | Leave a comment

How will GST impact Solar Projects in India

Implications-of-GST-on-delivered-cost-of-Renewable-Energy Executive summary Multiple Indirect taxes are currently levied on transactions in India. Some of the taxes are levied and collected by the Central Government, while other taxes are collected by the State Governments. Accordingly, the current Indirect tax regime … Continue reading

Posted in Bagasse, Biofuels, Biomass, CERC, Cogeneration, Geothermal, Grid Connected, Grid Interactive Distributed Solar Energy Systems, Hydro, India, Maharashtra, MNRE, Power Generation, PV, Renewables, Solar, Solar Parks, Solar Policy, Solar Pumps, Waste, Waste To Energy, Wind | Tagged , , , , , , , , , , , , , , , , , , , , | Leave a comment

RAJASTHAN ELECTRICITY REGULATORY COMMISSION, JAIPUR In the matter of determination of generic tariff for sale of electricity to Distribution Licensee from Biomass, Biogas and Biomass Gasifier based power plants getting commissioned in the State during FY 2016-17 and revised variable charges of the Biomass power plants commissioned during the period 2009-2015 and during FY 2015-16.

RAJASTHAN ELECTRICITY REGULATORY COMMISSION, JAIPUR In the matter of determination of generic tariff for sale of electricity to Distribution Licensee from Biomass, Biogas and Biomass Gasifier based power plants getting commissioned in the State during FY 2016-17 and revised variable … Continue reading

Posted in Biomass, India, Rajasthan, Renewables, RERC | Tagged , , , , , , , | Leave a comment

STATE WISE LIST OF LOWEST DISCOVERED PRICES (TENTATIVE) FOR SECI 500 MW ROOFTOP TENDER

STATE WISE LIST OF LOWEST DISCOVERED PRICES (TENTATIVE) FOR SECI 500 MW ROOFTOP TENDER S.No Name of the State State wise lowest Price discovered PART A (Rs./kW) PART B (Rs/kWhr) PART C (Rs./kW) 1 Andaman & Nicobar Islands 74950 2 Andhra Pradesh 59950 5.25 62100 3 Bihar 71900 71270 4 Chandigarh 55500 3 … Continue reading

Posted in MNRE, PV, Rooftop, SECI, Solar Policy, Solar Pumps | Tagged , , , , , , , , | Leave a comment

Rooftops – Indian Solar’s New Frontier by Ritesh Pothan

Rooftops – Indian Solar’s New Frontier Post 2009, Solar has been buzzing with medium as well as large projects and has recently crossed 6500MW at the end of March 2016, though installed capacity with rooftops currently at less than 0.25% … Continue reading

Posted in CERC, Cross Subsidy Surcharge, DISCOM, Government, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Maharashtra, MNRE, Net Metering, Policy, Power Generation, Regulations and Procedures, Renewables, Residential, Rooftop, Solar, Subsidy | Tagged , , , , , , , , , , | Leave a comment

(REC) Renewable energy certificates, battling declining demand, could be scrapped

Renewable energy certificates, battling declining demand, could be scrapped, officials said. The industry, however, sees a turnaround by 2017-18 and does not want the certificates to meet the fate of carbon credits The market for these certificates, launched in 2010, … Continue reading

Posted in CERC, Climate Change, Government, Grid Interactive Distributed Solar Energy Systems, India, Renewable Energy Certificates, Renewable Purchase Obligation, Renewables, Solar, Solar Policy | Tagged , , , , , , , , , , , | Leave a comment

SECI DRAFT 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SCHEME FOR GOVERNMENT BUILDINGS UNDER CAPEX AND RESCO MODELS

SOLAR ENERGY CORPORATION OF INDIA LIMITED DRAFT 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SCHEME FOR GOVERNMENT BUILDINGS UNDER CAPEX AND RESCO MODELS Scheme with aggregate capacity of 1000 MWp rooftop solar PV system.  Two Models – CAPEX … Continue reading

Posted in Government, India, MNRE, Power Generation, Renewables, Rooftop, Solar, Subsidy | Tagged , , , , , , , , , , | Leave a comment

Draft Guidelines for Tariff Based Competitive Bidding Process for Grid Connected Solar PV Power Projects – 2016

Objectives of the Guidelines Promotion of competition in the electricity industry in India is one of the key objectives of the Electricity Act, 2003. Power purchase costs constitute the largest cost element for distribution licensees. Competitive procurement of electricity by … Continue reading

Posted in DISCOM, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Policy, Power Generation, Regulations and Procedures, Renewables, Solar | Tagged , , , , , , , , , , , | Leave a comment

Karnataka 920 MW SECI VGF Open Tender Results – June 2016

Karnataka 920 MW SECI VGF Open Tender Bidders Name VGF Tariff MW Hero Solar Energy Pvt Ltd ₹68,00,000 4.43 200 J K Petroenergy Pvt Ltd ₹73,48,990 4.43 10 PCIL Pune ₹73,49,000 4.43 40 Solitaire Powertech Pvt Ltd ₹73,49,000 4.43 30 … Continue reading

Posted in Grid Interactive Distributed Solar Energy Systems, India, Karnataka, Renewables, Solar, VGF | Tagged , , , , , , , , , , , , , , , , | Leave a comment

MNRE compilation of documents for Rooftop Solar

Click below http://mnre.gov.in/schemes/decentralized-systems/solar-rooftop-grid-connected/

Posted in MNRE, Policy, PV, Regulations and Procedures, Renewables, Solar, Subsidy | Tagged , , , , , , , | Leave a comment

Empanelment of Channel Partners, Channel Partners (New Entrepreneurs) and Government Agencies under Grid Connected Rooftop and Small Solar Power Plants Programme.

Empanelment of Channel Partners, Channel Partners (New Entrepreneurs) and Government Agencies under Grid Connected Rooftop and Small Solar Power Plants Programme.

Posted in Government, India, JNNSM, MNRE, PV, Renewables, SECI, Solar, Solar PV, Transmission and Distribution | Tagged , , , , , , , , | Leave a comment

Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Different States of India

The bidding process under this Rooftop scheme is for 500 MWp comprising of CAPEX Model (300 MWp) & RESCO Model (200 MWp) The bidding process under this rooftop scheme is for PART-A (CAPEX Only), PART-B (RESCO Only) and Part – … Continue reading

Posted in Grid Connected, India, Renewables, Rooftop, SECI, Solar, Solar PV | Tagged , , , , , , , , , , | Leave a comment

Commissioning Status of Grid Connected Solar Power Projects under JNNSM upto 31st March 2016

Commissioning Status of Grid Connected Solar Power Projects under JNNSM Sr. No. State/UT Total cumulative commissioned capacity till 31-03-15 (MW) Total commissioned capacity during 2015-16 (MW) Total cumulative commissioned capacity till 31-03-16 (MW) 1 Andhra Pradesh 137.852 435.114 572.966 2 Arunachal Pradesh 0.025 0.240 0.265 3 Bihar 0 5.100 … Continue reading

Posted in Grid Interactive Distributed Solar Energy Systems, India, JNNSM, Power Generation, PV, Renewables, Solar | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Determination of Benchmark Capital Cost Norm for Solar PV power projects and Solar Thermal power projects applicable during FY 2016-17

Determination of Benchmark Capital Cost Norm for Solar PV power projects and Solar Thermal power projects applicable during FY 2016-17 The Commission notified the Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 … Continue reading

Posted in CERC, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Power Generation, PV, Regulations and Procedures, Renewables, Solar | Tagged , , , , , , , , , , , , , , , | Leave a comment

Comments invited on Draft Guidelines for Tariff Based Competitive Bidding Process for Grid Connected Solar PV Power Projects

Comments invited on Draft Guidelines for Tariff Based Competitive Bidding Process for Grid Connected Solar PV Power Projects

Posted in India, MNRE, Regulations and Procedures, Renewables, Solar | Tagged , , , , , , , , | Leave a comment

Approval of Guidelines for implementation of Scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-IV of Phase-II of the National Solar Mission

Click here for the entire document  

Posted in Batch 4, Grid Interactive Distributed Solar Energy Systems, India, JNNSM, Ministry of Finance, MNRE, Power Generation, Renewables, Solar, Subsidy, VGF | Tagged , , , , , , | Leave a comment

Central Financial Assistance (Subsidy) Eligibility for Solar Rooftop Projects

SI. No. Category Coverage of buildings Central Financial Assistance/Achievement linked Incentives & awards (i) Residential All types of residential buildings CFA upto 30% of benchmark cost for General Category States/UTs and upto 70% of benchmark cost for Special Category States i.e., … Continue reading

Posted in Government, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, MNRE, Net Metering, PV, Renewables, Rooftop, Solar, Solar CFA, Solar PV, Subsidy | Tagged , , , , , , , , , , , , , | Leave a comment

List of Empanelled Chartered Engineers for certifying Bill of Material of Solar Power Developers for availing exemptions of Excise duty /concessional customs Duty Benefits

list-of-charted-engineer-certifying-BoM-SPD_ED_CCDB S.N Name of the Participant Con. No. Organisation Mail ID City and State 1 Shri. R.K. Khera 9810075736 R.K. Consultants, Govt. Regd. Valuer and Chartered Engineer, Off: 1076(GF) Sector 37 Noida 201303, ravi.khera@gmail.com NOIDA- Uttar Pradesh 2 Shri V.K. … Continue reading

Posted in India, MNRE, PV, Renewables, Solar, Subsidy, tax exemption | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Draft Guidelines for Implementation of scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding under Batch-IV of Phase-II of the JNNSM

The Draft Guidelines for Implementation of scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding under Batch-IV of Phase-II of the JNNSM. In this regard the views / comments are requested from … Continue reading

Posted in Batch 4, Government, India, MNRE, Power Generation, PV, Solar Parks, VGF | Tagged , , , , , , | Leave a comment

The WTO Just Ruled Against India’s Booming Solar Program

Cartoon by Courtenay Lewis On the heels of the recent global summit in Paris to tackle climate disruption, the World Trade Organization (WTO) has ruled against an important piece of the climate solution puzzle: India’s ambitious program to create homegrown … Continue reading

Posted in Batch I, Batch II, Government, India, JNNSM, MNRE, Phase I, Phase II, PV, Renewables, Rooftop, Solar, Solar Policy, Tranche I, USA, WTO | Tagged , , , , , , , , , , | Leave a comment

Solar tariff trend in India from 2010-2016

Trend of Solar Tariff Previous bid results     Year Capacity on Offer (MW)   Highest Bid (Rs./KWh)   Lowest (Rs./KWh)   Weighted Avg. Price (Rs./KWh) NSM Batch 1 Dec’10 150 12.76 10.95 12.16 NSM Batch2 Dec’11 350 9.39 7.49 … Continue reading

Posted in Batch I, Batch II, Government, JNNSM, Phase I, Phase II, Power Generation, PV, Renewables, Solar, Solar Parks, Tranche I | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Commissioning Status of Grid Connected Solar Power Projects as on 31 Jan 2016

Cumulative Commissioned as on 31-01-2016  Commissioning Status of Grid Connected Solar Power Projects     Sr. No.     State/UT   Total MNRE Projects MW   State Policy MW     RPO MW   REC Scheme MW   Pvt. Initiative … Continue reading

Posted in Andhra Pradesh, Bihar, Government, Grid Interactive Distributed Solar Energy Systems, Gujarat, Haryana, India, JNNSM, Karnataka, Madhya Pradesh, Maharashtra, Ministry of Power, MNRE, New Delhi, Power Generation, Punjab, PV, Rajasthan, Renewables, Solar, Solar PV, Telangana, Uttar Pradesh | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

MNRE brings back 30% subsidy for Solar Rooftops but excludes Commercial and Industrial establishments

In a surprising move, MNRE has brought back the 30% subsidy on Solar Rooftops but has excluded Industrial and Commercial Establishments. CFA Notice Grid Connected Rooftop Notice 19/11/2015 Subject: Installation  of  Grid  Connected          Solar  Rooftop  Power  Plants  – Central Financial … Continue reading

Posted in Andhra Pradesh, Bihar, Commercial, DISCOM, Grid Connected, Grid Interactive Distributed Solar Energy Systems, Gujarat, Haryana, India, Industrial, Karnataka, Madhya Pradesh, MNRE, Net Metering, New Delhi, Power Generation, Punjab, Rajasthan, Renewables, Rooftop, Rural Lighting, Solar, Solar Policy, Subsidy, Tamil Nadu, Telangana, Telangana, Transmission and Distribution, Uttar Pradesh | Tagged , , , , , , , , , , , , , , , , , , | Leave a comment

Free passage for green power soon

The government will allow free transmission of power from renewable sources and may also move to double the number of solar parks in the country to 50, power, coal and renewable energy minister Piyush Goyal said on Wednesday. “We are … Continue reading

Posted in Biomass, DISCOM, Energy Minister, Government, Grid Connected, Hydro, India, Ministry of Power, Solar, Transmission and Distribution, Transmission Charges, Wind | Tagged , , , , , , , , , , | Leave a comment

Draft of Indian Renewable Energy Act 2015

Request for comments/observations/feed-back on the Draft Renewable Energy Act 2015 In October 2014, the Ministry of New and Renewable Energy (MNRE) had constituted an Expert Committee to provide a draft Renewable Energy Act. The Committee met on 7 November 2014, … Continue reading

Posted in Commercial, Government, India, Industrial, JNNSM, Manufacturing, Ministry of Power, Prime Minister, PV, Residential, Rooftop, Solar, Solar Parks, Solar Policy, Solar Pumps, Solar Thermal, Tidal, Transmission and Distribution, Waste, Waste To Energy, Wind | Tagged , , , , , , , , , , , , , , , | Leave a comment

Price bid opening of 24 MW Grid Connected Roof Top Solar PV Projects

Solar Energy Corporation of India New Delhi-17 10-07-2015 Subject: Price bid opening of 24 MW Grid Connected Roof Top Solar PV Projects (Phase-IV-Part-2) In reference to RFS No: SECI/Cont./SRT-IV-P1/74/2014 dated 27.02.2015 ,this is to kindly inform that bidders are qualified … Continue reading

Posted in Government, Grid Interactive Distributed Solar Energy Systems, India, Madhya Pradesh, Maharashtra, MNRE, New Delhi, Power Generation, Punjab, PV, Rajasthan, Renewables, Rooftop, Solar, Subsidy, Telangana, VGF | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Determination of generic levellised tariffs for Solar PV Projects (Draft) under Regulation 17 of the Himachal Pradesh Electricity Regulatory Commission

The tariff so determined in respect the current financial year shall apply for the FY 2016-17 also in cases where PPA is signed by 31.03.2016 and the entire capacity covered by the PPA is commissioned on or before 31.03.2017. The Commission however observes that … Continue reading

Posted in Commercial, Crystalline, Government, HPERC, India, PV, Renewables, Residential, Rooftop, Solar, Thin Film | Tagged , , , , , , , , , , , , , , , , , , , | Leave a comment

Joint Regulatory Commission for Goa and Union territories (JERC) has determined the solar tariff for ground-mounted and rooftop solar projects

Tariff is applicable for projects in the State of Goa and the Union Territories of Andaman and Nicobar Islands, Chandigarh, Dadra & Nagar Haveli, Daman & Diu, Lakshadweep, and Puducherry. Click Here for the Full document

Posted in Climate Change, DISCOM, Government, India, JERC, Ministry of Power, MNRE, Net Metering, PV, Renewables, Residential, Rooftop, Solar, Solar Policy | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Implementation of 73 MW Grid Connected Roof Top Solar PV Power Scheme in Warehouses in Selected States in India

The bidding process is under Rooftop Warehouse Scheme (RWS) – Phase-I for aggregate capacity of 73 MW. The projects shall be implemented on Build Own Operate basis which include sale of the Solar Power to the concerned state DISCOMs. Bidder … Continue reading

Posted in Government, Grid Interactive Distributed Solar Energy Systems, India, MNRE, Renewables, Rooftop, SECI, Solar | Tagged , , , , , , , , , , | Leave a comment

Implementation of Project for setting up of 15,000 MW of Grid-connected Solar PV Power plants through NTPC Ltd. / NTPC Vidyut Vyapar Nigam Limited (NVVN) under National Solar Mission

The scheme will be implemented through the NTPC / NVVN (the power trading arm of NTPC Limited) under Ministry of Power. The scheme envisages setting up of Grid-connected solar PV power plants of 15,000 MW aggregate capacity in three tranches: … Continue reading

Posted in Batch I, Batch II, Government, Grid Connected, India, JNNSM, Manufacturing, Ministry of Power, NTPC, NVVN, Phase I, Phase II, Power Generation, PV, Renewables, Solar, Solar Parks, Solar Policy, Tranche I, Transmission and Distribution | Tagged , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Final Draft Guidelines for Selection of 3000 MW Grid – Connected Solar PV Power Projects under Batch-II

National Solar Mission  Phase-II (2013-17) Guidelines for Selection of 3000 MW Grid – Connected Solar PV Power Projects under Batch-II “State Specific Bundling Scheme” Government of India Ministry of New and Renewable Energy January 2015 Click here for the Final Draft … Continue reading

Posted in Climate Change, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, MNRE, Renewables, Solar, Solar Parks | Tagged , , , , , , , , , , , | Leave a comment

Revised Draft Guidelines for Implementation of Scheme for setting up of 2000 MW Grid-connected Solar PV Power Projects under JNNSM, Batch-III “State Specific VGF Scheme”

Revised Draft Guidelines for Implementation of Scheme for setting up of 2000 MW Grid-connected Solar PV Power Projects under JNNSM, Batch-III “State Specific VGF Scheme” Phase-II, Batch-III: State Specific VGF Scheme The Solar Projects of 2000 MW Capacity under the … Continue reading

Posted in Climate Change, Crystalline, Government, Grid Interactive Distributed Solar Energy Systems, India, MNRE, Renewables, Solar, Solar Policy, Thin Film, Transmission and Distribution, VGF | Tagged , , , , , , , , | Leave a comment

Implementation of Scheme for setting up of 1000 MW of Grid-Connected Solar PV Power Projects by Central Public Sector Undertakings (CPSUs) and Government of India Organizations under various Central / State Schemes / self-use / 3rd party sale / merchant sale with Viability Gap Funding under Batch-V of Phase-II of JNNSM

Implementation of the Scheme 2.1     Applicability: The CPSUs  and Government of India organi zations  would  set-up Grid­ connected solar  PV po wer projects  under  various  Central/  State  Schemes/ self-use/ 3rd  party sale/  merchant  sale with Viability  Gap Funding  under … Continue reading

Posted in Crystalline, Government, Grid Connected, India, MNRE, Phase II, PV, Renewables, SECI, Thin Film, VGF | Tagged , , , , , , , , , , , , , , | Leave a comment

Programme/ Scheme wise Physical Progress of Renewable Energy in 2014-15 (During the month of December)

Physical Progress (Achievements) Ministry of New & Renewable Energy Programme/ Scheme wise Physical Progress in 2014-15 (During the month of December) Sector FY- 2014-15 Cumulative Achievements Target  Achievement (as on 31.12.2014) I.   GRID-INTERACTIVE POWER (CAPACITIES IN MW) Wind Power 2000.00 … Continue reading

Posted in Batch II, Biofuels, Biomass, Cogeneration, Commercial, Geothermal, Hydro, India, JNNSM, MNRE, Phase II, PV, Renewables, Residential, Rooftop, Rural Lighting, Solar, Solar Parks, Solar Policy, Solar Pumps, Solar Thermal | Tagged , , , , , , , , , , , , , , , , , , | Leave a comment

Implementation of Scheme for setting up over 300 MW of Grid-Connected & Off-grid Solar PV Power Projects by Defence Establishments under Ministry of Defence and Para Military Forces (under MHA) with Viability Gap Funding (VGF) under Phase-II/III of JNNSM during 2014-15 and onwards

Applicability: The capacity  of 300 MW of Grid-Connected  and off-Grid  Solar PV power projects,   will  be  set  up  in  various  Establishments  of  Ministry  of  Defence  i.e Establishments of Army,  Navy, Air Force, Ordnance Factory  Board,  Defence Laboratories and Defence PSUs … Continue reading

Posted in Armed Forces, Crystalline, Defence Ministry, Government, Grid Interactive Distributed Solar Energy Systems, Grid Storage, India, MNRE, PV, Renewables, Rooftop, Solar, Solar Parks, Subsidy, Thin Film, VGF | Tagged , , , , , , , , , , , , , , , , , | Leave a comment

GUIDELINES FOR CAPITAL SUBSIDY SCHEME OF GOVERNMENT OF INDIA FOR PROMOTING SOLAR PHOTOVOLTAIC (SPV) WATER PUMPING SYSTEMS FOR IRRIGATION PURPOSE

A SPV water pumping system consists of PV array, a DC/AC surface mounted / submersible / floating motor pump set, electronics, if any, interconnect cables and an ‘on-off’ switch. PV array is mounted on a suitable structure with provision of … Continue reading

Posted in Climate Change, India, MNRE, Off-grid, Power Generation, Renewables, Solar, Solar Policy, Solar Pumps, Subsidy | Tagged , , , , , , , , , , , , , , , | Leave a comment

Department of Financial Services, Ministry of Finance issues notice to all public sector banks to include Solar Rooftops as part of their home loan programme

Government of India Ministry of New and Renewable Energy PRESS RELEASE Loan for Installation of Grid Interactive Rooftop Solar PV Plants The Government of India has set a challenging target of 40,000 MWp of Grid-Interactive Rooftop Solar PV Plants during … Continue reading

Posted in Climate Change, Department of Financial Services, Grid Interactive Distributed Solar Energy Systems, India, Ministry of Finance, Power Generation, Renewables, Rooftop, Solar, Solar Policy | Tagged , , , , , , , , , , , , , , | Leave a comment

MNRE reduces Solar Rooftop Subsidy from 30% to 15% and discourages Industrial and Commercial Customers who are currently at parity with grid

No. 5/34/2013-14/RT Ministry of New and Renewable Energy (Grid Connected SPV Rooftop, Solar Cities & Green Buildings Division) INFORMATION NOTICE Installation of Grid Connected Rooftop Solar Power Projects- Limitations for Subsidy of MNRE. The Ministry is implementing a ‘Grid Connected … Continue reading

Posted in India, MNRE, PV, Renewables, Rooftop, Solar Policy, Subsidy | Tagged , , , , , , , , , , | Leave a comment

Draft Guidelines for Selection of 3000 MW Grid-connected Solar PV Power Projects under Batch-II Tranche-I State Specific Scheme

Draft Guidelines for Selection of 3000 MW Grid-connected Solar PV Power Projects under Batch-II Tranche-I State Specific Scheme Government of India  Ministry of New and Renewable Energy – October 2014 The 1000 MW Bundling Scheme introduced under NSM Phase-I has been … Continue reading

Posted in Batch II, Commercial, Grid Connected, India, JNNSM, MNRE, Phase II, Power Generation, PV, Renewables, Solar, Solar Parks | Tagged , , , , , , , , , , , , , , , , | Leave a comment

MNRE invites proposals for 52MWp rooftop installations on Public Sector Utilities across India through MGAs

The Ministry of New and Renewable Energy invites offers/proposals for installation of Grid Connected Rooftop Solar Photovoltaic Power Plants in various States across the Country under National Clean Energy Funds from the Multi Government Agencies (MGAs) i.e. Govt. Deptts. Govt. Institutions, PSUs & their subsidiaries, DISCOMs, DMRC, National Housing Bank, Commercial Banks, Railways, Army, Financial Institutions/Financial Integrators, etc. in the country. These projects can be installed in the Government / Commercial/ Institutional/ residential buildings located in various States in the country. Continue reading

Posted in Climate Change, Commercial, Crystalline, Grid Interactive Distributed Solar Energy Systems, MNRE, Net Metering, PV, Renewables, Residential, Rooftop, Solar | Tagged , , , , , , , , , , , , , , , , | Leave a comment

India rooftop solar subsidy finally released, but industry says better off without

Installers are having to charge more for solar to mitigate the costs of chasing the subsidy, or risk of non-payment and delays. India’s Ministry of New and Renewable Energy (MNRE) has finally received funds to pay a 30% subsidy promised … Continue reading

Posted in Crystalline, Grid Connected, India, MNRE, PV, Renewables, Residential, Rooftop, Rural Lighting, Solar, Subsidy, Thin Film | Tagged , , , , , , , , , , , | Leave a comment

Government aims to add 10,000 MW per year to lift wind energy sector

Ritesh: Another ill conceived move to pacify wind industry lobbyists which will impact the growth of Solar in the country for a poor source of energy. The government plans to rapidly accelerate wind energy generation, adding an ambitious 10,000 MW every year, or … Continue reading

Posted in Power Generation, Renewables, Wind | Tagged , , , , , , , , , | Leave a comment

Draft Guidelines for selection of 1500 MW Grid Solar PV power projects under National Solar Mission, Phase-II Batch-II Scheme of Bundling with Thermal Power- Invitation of Comments

F. No. 32/8/2013-14/GSP Government of India Ministry of New and Renewable Energy Grid Solar Power Division Block No,. 14, C.G.O. Complex Lodi Road, New Delhi-110003 Dated: 16/07/2014 Subject: Draft Guidelines for selection of 1500 MW Grid Solar PV power projects … Continue reading

Posted in Batch II, CSP, Grid Connected, India, MNRE, Phase II, Power Generation, PV, Renewables, Solar | Tagged , , , , , , , , , , , , , , , | Leave a comment