Total Capacity to be Procured Bids are invited for the procurement of 150 MW power at the Delivery Point, from the Grid connected solar PV projects located in Bihar, to be developed on the maun/chaur/pond where pisci-culture is being practiced, for a period of 25 years from the Scheduled Commissioning Date in accordance with the terms of the Power Purchase Agreement (PPA).
Size of each project to be Considered The bidders shall note that the minimum and maximum size of project which can be considered for evaluation and from which the solar power may be procured are as follows:
Minimum capacity of any individual Project – 2 MW (with a tolerance of +5%)
Maximum capacity of any individual Project – 10 MW (with a tolerance of +5%).
Note: – The Capacity of the Project in MW is the installed Capacity of the Project / Maximum Power Output (AC) from the Solar Power Plant which can be scheduled at the point of injection to the Grid during any time block of the day.
Number of Response to RfP by a Company
The total capacity of Solar PV Projects to be allocated to any Bidder including its Parent,
Affiliate or Ultimate Parent-or any Group Company shall be limited to 30 MW. A Bidder,
including its Parent, Affiliate or Ultimate Parent-or any Group Company may submit
application for a maximum of three projects at different locations subject to a maximum
aggregate capacity of 30 MW. In such cases, the Bidder shall submit one single application
in the prescribed format detailing all projects at multiple locations for which the developer is submitting the application.
Pingback: Karnataka calls for 130MW Solar in IInd Phase | Natural Group
Pingback: Punjab Request For Proposal Document For New Grid Connected Solar Photo Voltaic Power Projects – 300 MW Capacity Under Phase – I | Natural Group
Pingback: Inviting comments on Draft Guidelines for setting up of 750 MW Grid Solar PV power projects with Viability Gap Funding (VGF) under Jawaharlal Nehru National Solar Mission (JNNSM), Phase-II, Batch-I | Natural Group