0
Powered by :
Asian Development Bank, multilateral development bank, has approved a $160 million ordinary capital resources loan on 30 June 2026 for Bhutan’s Solar Farm Expansion Project. The project will add at least 310 MW of solar generation capacity across three sites. Druk Green Power Corporation will develop the 120 MW Wobthang and 40 MW Pedseling solar farms in Bumthang. A 150 MW Dramthang solar farm in Lhuentse is expected through a joint venture between DGPC and Tata Power Renewable Energy. Bhutan Power Corporation will build 46 km of transmission infrastructure to connect the solar farms to Bhutan’s national grid.
SOLARbytes brings you the latest news in solar world in bite size; essentially a gist of important solar news in few sentences.
Subscribe to our Newsletter!
Quick Links
© 2026 SOLARbytes | SOLARbytes is a publication of Wat(t) Bytes Media Pvt. Ltd. All rights reserved.