Bluebird Solar bags 439.35 MW Solar Module Supply Order for Lalitpur Project – Saur Energy

0
By clicking the button, I accept the Terms of Use of the service and its Privacy Policy, as well as consent to the processing of personal data.
Don’t have an account? Signup
Powered by :
Souece: Linkedin
Indian solar module manufacturer Bluebird Solar has secured a 439.35 MW solar module supply order from NTPC Renewable Energy Limited (NTPC REL), marking yet another large solar order from India’s PSU cohort for the market.
In a press release, Bluebird Solar said it will supply its M10R N-Type TOPCon Dual-Glass Bifacial Solar PV Modules under the contract. These modules will be deployed across NTPC Renewable Energy Limited’s utility-scale solar project in Lalitpur, Uttar Pradesh.
The project forms part of NTPC Renewable Energy Limited’s (NTPC REL) tender for the supply of solar modules for its 1,000 MW solar projects in Lalitpur and Chitrakoot. As part of the tender, issued by NTPC REL in April this year it has awarded a 439.35 MW module supply package to Bluebird Solar.
Originally, the tender was floated for the supply of solar modules for the two project sites, with 435 MWp allocated to Lalitpur (Units 1 and 2) and 580 MWp to Chitrakoot. The combined projects have a contracted AC capacity of 1,000 MW and a cumulative DC capacity of 1,450 MWp.
Bluebird Solar has consistently strengthened its manufacturing capabilities through investments in advanced technology, automation, and stringent quality control systems. The company operates a 2.5 GW fully automated solar PV module manufacturing facility in Greater Noida, Uttar Pradesh.
The facility is equipped with advanced production lines to manufacture high-quality solar PV modules with enhanced reliability. The company’s high-performance product portfolio is designed to maximise energy generation while ensuring long-term performance across diverse climatic conditions.
With merchant module prices under pressure from an ALMM list that has swollen past 204 GW of enrolled capacity, the most reliable demand in the Indian market is no longer the private IPP spot buyer. It is the PSU tender — NTPC REL, SECI, NHPC, SJVN — where domestic content is contractually locked, volumes are large and single-buyer, and payment security is sovereign-adjacent. For manufacturers navigating a brutal oversupply, a PSU letter of award is not just revenue; it is bankable revenue, the kind that supports working capital lines and IPO narratives.
SAEL’s Chitrakoot win, is another large order we have seen this week that falls inthe same category.
The risks deserve equal billing. Reverse-auction procurement compresses margins even in a protected market, and manufacturers winning PSU volumes at aggressive prices are trading profitability for order-book optics — a trade that looks better in an IPO prospectus than in a P&L. Concentration is the second concern: an order book dominated by a handful of PSU buyers carries its own fragility if tendering slows or payment cycles stretch. And the oversupply has not gone anywhere; it has merely been segmented.
Looking ahead, Bluebird Solar is accelerating its expansion strategy with plans to establish 2.5 GW of integrated manufacturing capacity for solar cells, wafers, ingots, and Battery Energy Storage Systems (BESS). This forward integration will strengthen the company’s domestic manufacturing ecosystem, enhance supply chain resilience, and support India’s vision of becoming a global manufacturing hub for clean energy technologies.

We are India’s leading B2B media house, reporting full-time on solar energy, wind, battery storage, solar inverters, and electric vehicle (EV)
Quick Links
© 2025 Saur Energy. All Rights Reserved.

source

This entry was posted in Renewables. Bookmark the permalink.

Leave a Reply