New PV Module Lift from Fluke Reduces Solar Installation Risks – Process and Control Today

In focus manufacturing
20/07/2026  OMRON Industrial Automation
20/07/2026  norelem LTD
20/07/2026  Trafag (UK) Ltd
20/07/2026  Fluke UK Ltd
Innovative lifting solution eliminates the need to carry solar panels up ladders, reducing installer fatigue and supporting regional ladder safety requirements
 
As rooftop solar installations continue to accelerate worldwide, Fluke Corporation is introducing a safer, simpler approach to moving photovoltaic (PV) modules onto roofs with the Fluke PV Module Lift™, a portable solution designed to reduce installer fatigue, improve productivity, and support ladder safety compliance regulations, including the UK Work at Height Regulations.
For solar installers, getting panels safely onto a rooftop remains one of the most physically demanding and overlooked aspects of the job. Because regulations require workers to maintain three points of contact when climbing ladders, the common method of carrying solar modules by hand creates both safety and compliance challenges. The Fluke PV Module Lift addresses this issue by providing a simple, reliable method for lifting solar panels to rooftops with an existing extension ladder.
“Solar installers shouldn’t have to choose between productivity and safety,” said Will White, Senior Solar Product Manager at Fluke Corporation. “The Fluke Module Lift gives crews a simple, practical way to move solar modules onto rooftops while reducing physical strain, supporting ladder safety requirements, and eliminating the complexity, cost, and setup time associated with traditional powered hoists. It’s a solution that easily solves a challenge installers face every day.”
Unlike traditional ladder hoists – commonly adapted from the roofing industry – the Fluke Module Lift requires no gas engine, electrical power source, or bulky equipment. The compact system fits easily in a service vehicle, sets up quickly, and costs significantly less than many powered alternatives, making it an ideal solution for residential and light commercial solar installations.
The Module Lift’s patent module hook securely grips the frame of a solar panel to prevent lateral movement during lifting. Integrated ladder ramps help panels move smoothly over ladder transitions, while a built-in braking mechanism prevents the module from sliding back down the ladder if the lifting rope is released prematurely.
Key Benefits of the Fluke PV Module Lift™
·         Supports ladder safety requirements including the Work at Height Regulations by eliminating the need to carry solar panels up ladders
·         Reduces worker fatigue and physical strain during rooftop installations
·         Sets up in less than five minutes by a single installer
·         Lightweight, rugged, and easy to transport
·         Compatible with existing Werner or Louisville fiberglass extension ladders
·         Requires no electricity, fuel, or external power source
·         Available with 60-foot and 80-foot rope configurations
 
For more information about the Fluke TMPV2 Module Lift, please visit  Fluke PV Module Lift
PrintPrint this article
For more information, please contact:
Olivia Kline
Fluke Corporation
Email: olivia.kline@fluke.com
Web: https://www.fluke.com
Visit company profile page
For safe switching commands and clear status indicators
Login or Register
Process and Control Today are not responsible for the content of submitted or externally produced articles and images. Click here to email us about any errors or omissions contained within this article.
eNewsletter sign-up
View our eNewsletter Archive
Sign-up for our weekly eNewsletter
Connect with us:
Advertise with us | Media pack
© Copyright 1999-2026 Process and Control Today Ltd
Registered in England No. 3733110 – studio44

source

This entry was posted in Renewables. Bookmark the permalink.

Leave a Reply