NISE Proposes Revised Solar Pump Controller Specifications with Higher Efficiency, BESS Integration – Energetica India Magazine

The National Institute of Solar Energy’s draft revised specifications propose higher efficiency benchmarks, wider PV operating ranges, support for battery storage and grid interaction, and multifunctional use of solar pump controllers to enhance the utilisation and reliability of PM-KUSUM solar assets.
August 13, 2026. By Mrinmoy Dey

KP Group Eyes 10 GW by 2030 as Hybrid Power, BESS and Green Hydrogen Gain Momentum

EV Growth Won’t Displace ICE Vehicles Anytime Soon: Ravi Chawla

Hinduja Renewables MD Deepak Thakur Says RTC and Storage Will Shape India’s Clean Energy Future

Ashish Kauleshnam, Tata Elxsi on How AI, Digital Engineering, Advancing Sustainable Mobility

Continuous Innovation is Fundamental to RenewSys’ Growth Strategy: Avinash Hiranandani

source

This entry was posted in Renewables. Bookmark the permalink.

Leave a Reply