Tata Power Renewables commissions 72.5 MW captive solar project for Tata Steel – pv magazine India

Tata Power Renewable Energy Ltd (TPREL) has commissioned a 72.5 MW solar project in Rajasthan for captive consumption by Tata Steel Ltd. The project, located in Kalasar, Bikaner, will supply green power to support Tata Steel’s decarbonisation efforts.
The project is expected to generate 166 million units of green energy annually and offset 1,18,856 tonnes of carbon emissions annually. The project deploys 1,71,360 PV modules, manufactured by TP Solar Ltd. 
TPREL said this project underscores its strong engineering expertise and execution excellence, highlighting its capability to deliver complex, technology-driven renewable energy assets within demanding timelines.
With the addition of this project, TPREL’s total utility-scale renewable energy capacity has reached 12.3 GW. Out of this, around 7 GW capacity (5.7 GW solar and 1.3 GW wind) is operational. Around 5.3 GW is under various stages of implementation, which includes 2.2 GW solar and 3.1 GW wind and is expected to be commissioned in phases over the next 6-24 months.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].
Comments
Please login to comment
Entries open in seven categories: Modules, Inverters, BoS, BESS, Manufacturing, Sustainability, Projects.
April 01 – August 31, 2026
Thursday, October 7, 2026
11:00 am – 12:30 pm CEST, Berlin, Paris, Madrid

You have no items in your basket.

source

This entry was posted in Renewables. Bookmark the permalink.

Leave a Reply