Zambia: Small delay for Maamba’s coal expansion, as solar and biomass additions advance – African Energy

Maamba Energy Ltd’s major expansion of generation capacity has seen small delays owing to logistical challenges caused by Gulf War III, but the IPP remains confident of bringing significant, additional capacity online in the near term
Tagged with:
Pin Zambia
Subscribe to African Energy
View subscription options
Issue 546 – 29 July 2026
Pin Nigeria
Pin Power, Commercial & industrial, Renewable energy
Issue 545 – 01 July 2026
Pin Nigeria
Pin Resources, Upstream oil & gas
Issue 544 – 29 June 2026
Pin Power, Strategy & risk, Climate change, Finance & investment
African Energy is a brand of
©Copyright 2026 African Energy
Head Office
4 Bank Buildings
Station Road
Hastings
TN34 1NG
United Kingdom

T: +44 (0)1424 721667

source

This entry was posted in Renewables. Bookmark the permalink.

Leave a Reply