Alberta bans solar panels from landfills, launches first recycling program – constructconnect.com

Click here to see Canada’s most comprehensive listing of projects in conceptual and planning stages
Click here to see Canada’s most comprehensive listing of projects in conceptual and planning stages
EDMONTON – Solar panel piles will be a thing of the past in Alberta landfills.
The provincial government has announced it is launching North America’s first solar panel recycling program to “protect landfill space, recover valuable resources and build a new recycling industry.”
Beginning Oct. 1, Alberta will become the first province in Canada to operate a solar panel recycling program and is banning solar panels from landfill disposal.
The release notes Alberta has the second-largest installed solar capacity in Canada. By 2045, more than 95 per cent of the solar panels currently installed in Alberta are expected to reach the end of their lives, generating as much as 72,700 tonnes of material.
The panels themselves contain glass, aluminum, silicon, silver, copper and other metals. “Instead of burying those resources, Alberta’s new system will recover them for use in new products, attract investment in collection and processing capacity, and help establish a new recycling industry here at home,” the release reads.
An environmental fee of $14 will apply to each new solar panel supplied in Alberta beginning Oct. 1. For a typical residential installation of 20 panels, the proposed fee would total $280.
The fee will ensure money is available to collect, transport and recycle panels when they reach the end of their lives. It will only apply to new panels supplied after the program begins.
Most solar panels have an expected lifespan of about 25 years. Alberta and the Alberta Recycling Management Authority will work with industry to build reuse and recycling capacity in Alberta as volumes increase.
comments for this post are closed
OTTAWA — Some of Canada’s leading environmental groups are pushing the federal g…
VICTORIA — Errors including botched currency conversions led the British Columbi…
EDMONTON — Despite severe weather in 2026, Alberta’s flood resilience projects h…
Barriers to dual ticketing are fast tumbling in Alberta as CLAC, employers, gove…
Top ten pre-bid library projects in Ontario, ranked by project value as of Septe…
OTTAWA – Ottawa’s retaliatory tariffs on American goods took effect just after m…
COQUITLAM, B.C. — Construction has officially stared on a new Hazel Trembath Ele…
Vancouver City Council recently approved rezoning of the downtown block formerly…
EDMONTON – Solar panel piles will be a thing of the past in Alberta landfills….
EDMONTON — Despite severe weather in 2026, Alberta’s flood resilience projects h…
Barriers to dual ticketing are fast tumbling in Alberta as CLAC, employers, gove…
GRAND PRAIRIE, ALTA. – Albertans now have a chance to provide feedback on how th…
GRAND PRARIE, ALTA. – Oil and gas exploration and development company Birchcliff…
OLDS, ALTA. – PCL Construction recently celebrated a milestone at Olds College o…
CALGARY, ALTA. — The Calgary Construction Association (CCA) is welcoming news th…
TORONTO — Alberta Minister of Transportation Devin Dreeshen issued a statement o…

source

This entry was posted in Renewables. Bookmark the permalink.

Leave a Reply