Prime Minister Narendra Modi virtually lays foundation stone for 110 MW floating solar project at Gujarat’s Kadana Dam – pv magazine India

Prime Minister Narendra Modi has virtually laid the foundation stone for a 110 MW AC (142 MW DC) floating solar project at the Kadana Dam reservoir in Gujarat’s Mahisagar district.
The project will be executed by KPI Green Energy Ltd, part of the Gujarat-based KP Group, for Gujarat State Electricity Corp. Ltd. (GSECL). KPI Green Energy’s scope includes engineering, procurement and construction (EPC) of the project.
Separately, KP Group company K.P. Energy Ltd has received a Letter of Intent from Emmvee Energy to develop a 42 MW wind-solar hybrid project in Karnataka under the group captive model. The project will comprise 21 MW of wind capacity and 21 MWp of solar capacity and will supply power to Emmvee Energy’s manufacturing facilities in the state.
The Karnataka project marks K.P. Energy’s first order in the state and expands the company’s geographical footprint beyond its traditional markets.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].
Comments
Please login to comment
The new issue of pv magazine Global is out now!
Available in print and digital – get your copy today!

You have no items in your basket.

source

This entry was posted in Renewables. Bookmark the permalink.

Leave a Reply