NHPC invites bids for BESS projects at 1.2 GW Jalaun Solar Park – pv magazine India

NHPC Ltd, on behalf of Bundelkhand Saur Urja Ltd (BSUL), has invited bids for the selection of developers to set up battery energy storage system (BESS) projects at BSUL’s 1.2 GW Jalaun Solar Park in Uttar Pradesh. The selected developer will establish BESS projects co-located with existing solar plants, use the available solar power to charge the storage systems, and schedule the remaining solar-plus-BESS power under either of two configurations: 300 MW/800 MW/4,800 MWh or 600 MW/800 MW/3,200 MWh, to meet the buying entity’s requirements during solar and non-solar hours.
The developer will be selected through tariff-based competitive bidding on a composite solar-plus-BESS tariff under the following configurations:
The developer may bid for either or both configurations. BSUL will enter into a power purchase agreement (PPA) with the successful bidder to procure solar-plus-BESS power. The PPA will be signed for the selected configuration based on the requirements of the buying entity.
BSUL has clarified that the BESS developer will procure the solar power from the co – located solar projects in Jalaun Solar Park at tariff as specified in the tender document.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].
Comments
Please login to comment
The new issue of pv magazine Global is out now!
Available in print and digital – get your copy today!
Friday, November 13, 2026
10:00 am – 11:00 am CET, Berlin, Paris, Madrid
Monday, November 23, 2026
11:00 am – 12:00 pm CEST, Berlin, Paris, Madrid

You have no items in your basket.

source

This entry was posted in Renewables. Bookmark the permalink.

Leave a Reply