LONGi Hi-MO 9 for Muswellbrook Solar Farm: power and load notes for miners – Geomechanics.io

Geomechanics, Streamlined.
© 2026 Geomechanics.io. All rights reserved.
Reviewed by Joe Ashwell
First reported on International Mining – News
LONGi will supply 135 MW AC / 176 MW DC of its Hi-MO 9 solar modules to the Muswellbrook Solar Farm and battery energy storage system (BESS) project in the Upper Hunter region of New South Wales, Australia. The utility-scale hybrid plant, located near the coal-dominated Muswellbrook mining hub, is designed to pair large-scale PV with grid-connected storage to stabilise output and support local load. For miners in the Hunter Valley, the project signals growing availability of firmed renewable power for electrified fleets, ventilation and processing loads.
With 135 MW AC / 176 MW DC of capacity, Muswellbrook sits at the larger end of the utility-scale renewables projects in our mining-category database, signalling that grid-scale solar-plus-storage is now being treated as core infrastructure for mining regions rather than a peripheral add-on.
The Upper Hunter in New South Wales is traditionally coal-heavy, so a LONGi-backed solar and BESS build of this scale is likely to be watched closely by operators considering repowering or hybridising nearby coal assets with renewables to manage closure risk and long-term energy costs.
Cancel at any time.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Cornish Lithium has awarded Marriott Drilling a major contract for a two-well programme at the Cross Lanes Geothermal Lithium Project near Truro, with each well planned to reach about 2,000 m depth. Marriott will deploy specialist geothermal drilling services tailored to high-temperature, deep hard-rock conditions typical of Cornish granites. The wells are intended to access lithium-enriched geothermal brines, a key step towards assessing commercial extraction potential and informing future wellfield design.
FLSmidth & Co. A/S has agreed to acquire 100% of Crushing Equipment Africa via its FLSmidth South Africa (Pty) Ltd subsidiary, expanding its installed base and service footprint in Southern Africa’s quarrying and mid-tier mining segment. The deal folds CE Africa’s compact jaw and cone crusher lines into FLSmidth’s portfolio, adding locally engineered machines suited to modular plants, mobile contractors and space-constrained sites. For regional operators, the move signals shorter spares lead times, stronger field service coverage and tighter integration between primary crushing, screening and downstream comminution circuits.
Containerised ultrafiltration and reverse-osmosis plants for remote mine camps only perform reliably when raw water quality, pre-treatment (including cartridge filtration and antiscalant dosing), recovery rates and disinfection are engineered as a single system rather than sized just for daily volume and container footprint, Victor Zhang writes. The piece stresses matching membrane selection and flux to variable borehole or surface sources, managing concentrate disposal from high-recovery RO, and designing for intermittent camp demand profiles. For operators, clear SOPs, remote monitoring and straightforward CIP procedures are flagged as critical to avoid fouling, microbiological failures and unplanned outages.
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
Quality control software for construction companies with material testing, batch tracking, and compliance management.
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

source

This entry was posted in Renewables. Bookmark the permalink.

Leave a Reply