A simulation-based techno-economic assessment of a proposed 503.5 kilowatt-peak rooftop photovoltaic system atop an industrial garment facility in Chittagong, Bangladesh, indicates that on-site solar deployment could generate 713.0 megawatt-hours of clean electricity annually while recovering its initial capital investment in roughly ten years. Conducted by an academic research team examining the readymade garments sector, the investigation modeled the operational performance, financial feasibility, and lifecycle environmental emissions of a grid-connected solar installation on the NHT Fashion building, located within the Chittagong Export Processing Zone. The export processing zone represents the earliest of eight such designated zones across Bangladesh, where energy-intensive apparel manufacturing operations remain heavily reliant on fossil-fuel-generated grid electricity. By employing detailed meteorological data, commercial solar equipment specifications, and systematic loss modeling, the study outlines a structured engineering pathway for industrial facilities seeking to reduce power overheads and limit workplace carbon footprints through distributed rooftop generation.
The readymade garments industry constitutes the primary export-earning sector of Bangladesh, contributing substantially to national economic expansion with apparel exports reaching 385,142.09 million dollars during the 2022 to 2023 fiscal year. During the 2021 to 2022 fiscal year, the domestic electricity supply remained overwhelmingly dependent on conventional fossil fuels, including coal, diesel, and natural gas, with grid-connected renewable energy representing a modest 0.38 percent of national generation while electricity imports met roughly 9.01 percent of total energy demand. Transitioning manufacturing hubs toward clean energy sources offers a viable mechanism to mitigate greenhouse gas emissions and safeguard the long-term operational resilience of critical export sectors.
Although building-integrated photovoltaic installations that incorporate solar cell layers into building facades, windows, and structural components have emerged as an alternative in global architectural studies, the researchers noted that retrofitting operational industrial factories with fully integrated systems remains severely constrained across developing nations. High capital installation expenses, specialized maintenance requirements, and architectural limitations frequently impede building-integrated retrofits in existing manufacturing centers. Consequently, deploying conventional arrays directly across unutilized industrial rooftop surfaces offers a far more realistic, cost-effective, and rapidly adoptable engineering intervention. While previous regional literature evaluated rooftop arrays in residential, commercial, or academic contexts, rigorous facility-specific assessments that simultaneously quantify real-world historical utility draw, comprehensive financial payback indicators, and complete equipment lifecycle emissions within Bangladesh’s garment industry had remained comparatively scarce.
To evaluate the technical potential of the specific facility, the researchers analyzed the baseline electricity demand of the NHT Fashion building using historical power records collected throughout the 2022 calendar year. Over that annual period, total facility electricity demand reached approximately 8430.995 megawatt-hours. The factory purchased approximately 8335.920 megawatt-hours from the national utility grid, while an existing on-site rooftop solar arrangement supplied approximately 95.075 megawatt-hours to the site. Monthly electricity consumption varied across the operating year, with grid-purchased electricity ranging from 519,570 kilowatt-hours in July to 802,410 kilowatt-hours in October. These verified consumption metrics served as an empirical baseline to characterize building demand before modeling the prospective contribution of an expanded, modern 503.5 kilowatt-peak rooftop photovoltaic array across the available industrial roof space.
The engineering simulation was executed using PVsyst Professional version 7.2.5, an established computational design package for modeling grid-connected photovoltaic arrays and estimating system loss mechanisms. Geographical coordinates of 22.294 degrees North and 91.775 degrees East established the site context in Dakshin Halishahar, where local atmospheric data was derived from the NASA Surface Meteorology and Solar Energy database. The meteorological profile indicated annual horizontal solar irradiation of approximately 1661.9 kilowatt-hours per square meter, with measured daily irradiation ranging between 4.02 and 5.51 kilowatt-hours per square meter per day. Peak solar resources were observed in April, while the minimum occurred in September. The clearness index varied between 0.354 and 0.655 across the year, and the average ambient temperature was determined to be 25 degrees Celsius, providing favorable climatic conditions for photovoltaic semiconductor operation.
The proposed physical design specified an array of 1007 Longi Solar LR5-66 HPH 500 M monocrystalline solar modules, each rated at 500 watts-peak with a photoconversion efficiency of 21.3 percent at standard testing conditions. To optimize power capture at the northern hemisphere latitude, the modules were modeled facing due south at a tilt angle of 19 degrees. The modules were divided into 53 parallel strings, with each string containing 19 panels connected in series. Power conversion was assigned to four commercial SMA Sunny Highpower grid-tied inverters, each possessing a rated alternating-current output capacity of 100 kilowatts and an efficiency rating of 98.8 percent.
To produce realistic generation forecasts rather than ideal theoretical limits, the software model incorporated detailed thermal, optical, and electrical loss parameters. The thermal behavior of the roof-mounted array was modeled using a constant thermal loss coefficient of 20 watts per square meter Kelvin and a wind-dependent coefficient of zero. Optical soiling and light-induced degradation were each assigned an initial loss fraction of 1.0 percent, while module mismatch and string mismatch were set at 2.0 percent and 0.1 percent, respectively. Direct-current ohmic wiring losses were specified at 1.5 percent at standard test conditions, and an annual module degradation rate of 0.2 percent was incorporated for long-term aging. When evaluated under simulated operating conditions, initial estimated annual generation of 892 megawatt-hours was reduced to a net annual output of 713.0 megawatt-hours, resulting in a specific annual production of 1416 kilowatt-hours per kilowatt-peak and an overall performance ratio of 77.85 percent.
The comprehensive financial assessment estimated the total capital expenditure for the proposed facility at 584,060.00 dollars, reflecting per-watt installed equipment and commissioning expenses. Hardware procurement represented the dominant share, with the 1007 solar modules accounting for 201,400.00 dollars, the four central inverters totaling 110,770.00 dollars, structural support systems requiring 25,175.00 dollars, and wiring, combiner boxes, apparatus, and monitoring units making up the remaining component expenses. Annual operational and maintenance expenditure was projected at 12,084.00 dollars per year to cover cleaning, equipment repairs, and routine monitoring personnel. Over a projected 25-year operational lifecycle, economic modeling demonstrated a levelized cost of electricity of 0.050 dollars per kilowatt-hour, a net present value of 718,322.08 dollars, and a cumulative return on investment of 123 percent, with cash-flow balances turning net positive after a simple payback period of 9.9 years.
The environmental assessment modeled greenhouse gas mitigation by calculating the volume of fossil-fuel grid power displaced by clean rooftop generation against the embodied carbon footprint of the photovoltaic infrastructure. Applying a Bangladesh grid lifecycle emission factor of 584 grams of carbon dioxide per kilowatt-hour alongside an assumed annual PV degradation factor of 1.0 percent, cumulative avoided grid emissions were calculated at 9251.47 metric tons of carbon dioxide over 25 years. Factoring in the lifecycle greenhouse emissions generated during equipment manufacturing and installation—comprising 862.355 tons for the solar modules, 39.225 tons for mounting structures, and 1.544 tons for the inverter units, totaling 903.12 tons—the net lifecycle carbon dioxide emission benefit of the proposed rooftop system was calculated at 8348.35 metric tons.
In their risk analysis and review of study constraints, the authors highlighted both physical vulnerabilities and computational limitations inherent to the investigation. Situated along the Bay of Bengal coastline, the factory faces severe coastal weather risks, including seasonal cyclones, heavy thunderstorms, and elevated wind loads that necessitate robust aerodynamic and structural support engineering. Furthermore, the researchers emphasized that their findings reflect predictive computational modeling via PVsyst rather than empirical field measurements from an operational installation. Because the financial and energy matching calculations relied on historical monthly utility billing data, the analysis could not evaluate fine-grained hourly load variations, manufacturing shift schedules, or weekend operational fluctuations. The authors concluded that future research must incorporate real-time industrial load monitoring, conduct long-term module degradation tracking under high regional humidity, and validate these simulated projections through pilot installations in operating garment factories.
Subject of Research: Simulation and techno-economic evaluation of an industrial rooftop photovoltaic system in Chittagong, Bangladesh
Article Title: Simulation-based performance evaluation, techno-economic, and environmental assessment of a rooftop PV system for the garment industry in Chittagong, Bangladesh
Article References: Islam, T., Shahjahan, M., Salam, A., Hoque, M. N., Haque, M. A., & Kowsar, A. (2026). Simulation-based performance evaluation, techno-economic, and environmental assessment of a rooftop PV system for the garment industry in Chittagong, Bangladesh. Measurement: Energy, 12, Article 100118. https://doi.org/10.1016/j.meaene.2026.100118
Image Credits: AI Generated
DOI: 10.1016/j.meaene.2026.100118
Keywords: rooftop photovoltaics, garment industry, Chittagong Export Processing Zone, PVsyst simulation, levelized cost of electricity, industrial decarbonization, monocrystalline solar panels, grid electricity displacement, solar irradiance, capital expenditure, operational expenditure, carbon mitigation, performance ratio, inverter efficiency, Bangladesh renewable energy, net present value, clean energy transition
News Source: Faith Mcneil. (November 28, 2026). Rooftop Solar Model for Bangladesh Garment Plant Predicts Decade Payback Period. Scienmag.
We bring you the latest biotechnology news from best research centers and universities around the world. Check our website.
Enter your email address to subscribe to this blog and receive notifications of new posts by email.


Bioengineer.org © Copyright 2023 All Rights Reserved.
Login to your account below




Please enter your username or email address to reset your password.


Bioengineer.org © Copyright 2023 All Rights Reserved.

source

This entry was posted in Renewables. Bookmark the permalink.

Leave a Reply