Electric buses operated by Titsa in Tenerife will now run on solar energy generated at the Santa Cruz Interchange. This initiative, backed by an investment of nearly €429,000 from the Cabildo de Tenerife, will involve installing a solar plant with up to 332 panels on the roofs of the interchange’s office building and vehicle wash.
The new solar facility, with a capacity of 215 kW—equivalent to the energy needs of around 60 homes—aims to provide self-consumption energy and cut down on carbon emissions. According to Eulalia García, the island’s Mobility Councillor, the project will address the growing energy demands resulting from the electrification of Titsa’s fleet.
The upgrade will contribute to Titsa’s transition from 29 hybrid vehicles to 298, which now represent 44% of its fleet, including ten zero-emission buses purchased since 2023. This transformation has also reduced diesel vehicles by 36%, leading to a decrease of approximately 8,661 tonnes of CO2 emissions.
Eulalia García highlighted that Titsa is now making “600 more daily trips than in 2023,” achieving a 15.2% reduction in emissions per kilometre. The island government expects Titsa will close the year with over 92 million passengers, a figure described as “historic” by President Rosa Dávila, indicating changing travel habits among the people of Tenerife.
Alongside the solar installation, renovations are underway at the Santa Cruz Interchange to improve access and external stops, costing over €82,000 and expected to take a month. The Cabildo plans further improvements in 2027, including a major overhaul of the La Laguna Interchange costing €8.1 million. For the next financial year, €138 million is allocated for Mobility, with a portion designated for purchasing an additional 35 buses.
Source link
Your email address will not be published.
A 29-year-old motorcyclist sustained injuries after colliding with a vehicle on the TF-1 motorway near Adeje, Tenerife,…
© 2026 Tenerife Weekly
© 2026 Tenerife Weekly