Tag Archives: “Renew Solar Power Ltd. (Consortium with

Enercon installs 2.4 GW of wind turbines in 2023

German wind turbine manufacturer and installer Enercon GmbH installed 2,421 MW of wind power in 2023, a 28% increase over the previous year. With a total of 628 wind turbines, Enercon achieved its operational goals over the past year. In … Continue reading

Posted in Government, Grid Interactive Distributed Solar Energy Systems, Ministry of Power, Power Generation, Renewables, Solar, Solar Policy, Solar PV | Tagged , , , , , , , , , , , , , , | Leave a comment

Installed solar power photovoltaic (PV) capacity in China increased by 216 gigawatts (GW), up 55.2% in 2023

China’s installed solar photovoltaic (PV) generation capacity rose 55.2% in 2023, data released by the National Energy Agency showed on Friday.The country built more than 216 gigawatts (GW) of solar energy photovoltaic (PV) in 2023, underscoring the scale and pace … Continue reading

Posted in Bagasse, China, Cogeneration, Government, Grid Interactive Distributed Solar Energy Systems, Power Generation, Renewables, Solar, Solar Policy, Solar PV | Tagged , , , , , , , , , , , , , , , | Leave a comment

SolarPower Europe publishes guidelines for recycling of photovoltaics (PV) solar panels

Last year the European Union added photovoltac solar power plants and residential photovoltaic systems with a record-breaking total capacity again, 55 GW, bringing the level to 263 gigawatts. With the staggering expansion in the sector, responsible management of solar panels … Continue reading

Posted in Grid Interactive Distributed Solar Energy Systems, Renewables, Solar, Solar Policy, Solar PV | Tagged , , , , , , , , , , , , , , | Leave a comment

Dubai unveils world’s largest concentrated solar power project

His Highness Sheikh Mohammed Bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, on Wednesday unveiled the world’s largest concentrated solar power and photovoltaic power project in Dubai. On X platform, Sheikh Mohammed … Continue reading

Posted in Grid Interactive Distributed Solar Energy Systems, Low Carbon Emission, Renewables, Solar, Solar Parks, Solar Policy, Solar PV | Tagged , , , , , , , , , , , , , , , , | Leave a comment

Solar power has seen a remarkable increase in capacity worldwide

In 2010 it took an average of a month to install one gigawatt of solar capacity. By 2015, this pace quickened to a week, and in 2023, it is expected to exceed one gigawatt per day. In the last decade, … Continue reading

Posted in Grid Interactive Distributed Solar Energy Systems, Renewables, Solar, Solar Policy, Solar PV | Tagged , , , , , , , , , , , , , , , | Leave a comment

Chile, 17 hours of storage with Concentrated Solar Power

In the Atacama Desert, the driest in the world located in northern Chile, the only Concentrated Solar Power tower in Latin America operates, a symbol of an energy revolution in the making against climate change. Aerial view of Cerro Dominador, … Continue reading

Posted in Energy Storage, Grid Interactive Distributed Solar Energy Systems, Grid Storage, Renewables, Solar, Solar Policy, Solar PV, Storage | Tagged , , , , , , , , , , , , | Leave a comment

JNNSM Phase-II, Batch-I: Notification regarding Financial Bid opening and List of bidders found eligible for financial bid opening

SOLAR ENERGY CORPORATION OF INDIA NEW DELHI-110017 No. SECI/JNNSM/P-2/B-1/TC-Eval/2014                                                       Dated: 15th Feb, 2014 JNNSM Ph-II, B-I: Notification regarding Financial Bid opening and List of bidders found eligible for financial bid opening This has reference to the Request for Selection (RfS) … Continue reading

Posted in Batch I, JNNSM, MNRE, Phase II, Renewables, SECI, Solar | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Snapshot of Bid opening of 750 MW SOLAR PV Projects under JNNSM Phase-II, Batch-I

  Solar Energy Corporation of India New Delhi Ref: SECI/JNNSM PHASE-II B-I/RfS                                                                     21.01.2014 Snapshot of  Bid opening of 750 MW SOLAR PV Projects under JNNSM Phase-II, Batch-I Subsequent to issue of RfS (Request for selection) document by Solar energy Corporation … Continue reading

Posted in Batch I, Grid Connected, JNNSM, Phase II, Renewables, Solar | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment