| Levellised Fixed Cost (₹/kWh) | Variable Cost (FY 2015-16) (₹/kWh) | Applicable Tariff Rate (₹/kWh) | Benefit of Accelerated Depreciation, if availed (₹/kWh) | Net Applicable Tariff Rate upon adjusting for Accelerated Depreciation benefit (3-4) (₹/kWh) |
| 1 | 2 | 3 | 4 | 5 |
| Biomass Power Projects(other than rice straw) with water cooled condenser | ||||
| 2.7 | 5.06 | 7.76 | 0.18 | 7.58 |
| Non-Fossil Fuel based Co-Generation Projects | ||||
| 2.23 | 4.57 | 6.8 | 0.14 | 6.66 |
| Biomass Gasifier Power Projects | ||||
| 2.66 | 4.86 | 7.52 | 0.13 | 7.39 |
| Biogas based Power Projects | ||||
| 3.57 | 4.29 | 7.86 | 0.26 | 7.6 |
| Particulars | Applicable Tariff Rate | Benefit of Accelerated Depreciation, if availed | Net Applicable Tariff Rate upon adjusting for Accelerated Depreciation benefit |
| (₹/kWh) | (₹/kWh) | (₹/kWh) | |
| 1 | 2 | 3 | 4 |
| Small Hydro Power Projects | |||
| Below 5 MW | 5.47 | – | 5.47 |
| 5 to 25 MW | 4.65 | – | 4.65 |
| Wind Energy Power Projects | |||
| Wind Zone-1 | 6.58 | 0.71 | 5.87 |
| Solar Power Projects | |||
| Solar PV | 7.04 | 0.69 | 6.35 |
| Solar Thermal | 12.05 | 1.25 | 10.8 |