Monthly Archives: March 2016

Approval of Guidelines for implementation of Scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-IV of Phase-II of the National Solar Mission

Click here for the entire document  

Posted in Batch 4, Grid Interactive Distributed Solar Energy Systems, India, JNNSM, Ministry of Finance, MNRE, Power Generation, Renewables, Solar, Subsidy, VGF | Tagged , , , , , ,

Central Financial Assistance (Subsidy) Eligibility for Solar Rooftop Projects

SI. No. Category Coverage of buildings Central Financial Assistance/Achievement linked Incentives & awards (i) Residential All types of residential buildings CFA upto 30% of benchmark cost for General Category States/UTs and upto 70% of benchmark cost for Special Category States i.e., … Continue reading

Posted in Government, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, MNRE, Net Metering, PV, Renewables, Rooftop, Solar, Solar CFA, Solar PV, Subsidy | Tagged , , , , , , , , , , , , ,

List of Empanelled Chartered Engineers for certifying Bill of Material of Solar Power Developers for availing exemptions of Excise duty /concessional customs Duty Benefits

list-of-charted-engineer-certifying-BoM-SPD_ED_CCDB S.N Name of the Participant Con. No. Organisation Mail ID City and State 1 Shri. R.K. Khera 9810075736 R.K. Consultants, Govt. Regd. Valuer and Chartered Engineer, Off: 1076(GF) Sector 37 Noida 201303, ravi.khera@gmail.com NOIDA- Uttar Pradesh 2 Shri V.K. … Continue reading

Posted in India, MNRE, PV, Renewables, Solar, Subsidy, tax exemption | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Draft Guidelines for Implementation of scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding under Batch-IV of Phase-II of the JNNSM

The Draft Guidelines for Implementation of scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding under Batch-IV of Phase-II of the JNNSM. In this regard the views / comments are requested from … Continue reading

Posted in Batch 4, Government, India, MNRE, Power Generation, PV, Solar Parks, VGF | Tagged , , , , , ,