MNRE revises BIS Quality Control (Requirement for Compulsory Registration under BIS Act) Order 2017

The Ministry of New and Renewable Energy (MNRE) had notified the above mentioned Quality Control (Requirement for Compulsory Registration under BIS Act) Order 2017 vide Government of India Gazette notification No. 2561 dated 5th September 2017. As per this notification the specified standards shall come into force on expiry of one year from the date of its publication in the Official Gazette.

2. The MNRE has initiated action for implementation of the said order. The test labs are being set-up for performance testing and certification of all products as per standards given in the said Quality Control Order 2017. Later on it was felt that the date for enforcement of the Quality Control Order 2017 dated 5.9.2017 for quality assurance as per the specified standards should be brought forward in order to ensure that quality control benefits the industry at the earliest possible. In this regard, the Ministry had sought inputs and suggestions from the various stakeholders.

3. The preparedness of test labs has been reviewed in consultation with Bureau Indian Standards (BIS) and test labs. It has now been decided that the said order in respect of SPV Modules shall come into force w.e.f. 1.4.2018 except for fire test which will be effective w.e.f. 1.07.2018. All test labs will set up fire test facility as per the specified standards, with BIS approval by 1.07.2018. For supplies from 1.04.2018 to 30.06.2018, the representatives of the manufactures would submit samples to an authorised lab for testing and give a self- certification that the module adheres to the prescribed standards. In case the sample fails to conform to the Indian Standards, the project developer will be penalised as per the provision contained in the Quality Control Order and guidelines of the Ministry of New and Renewable Energy (MNRE), Government of India. For invertor testing, test labs have been requested to obtain approval of BIS by 31.03.2018 for testing invertors of capacities up to 100kW and by 1.09.2018 for capacities more than 100kW. The word “Power Convertors” is replaced with “Invertors” at Sl. No. 4 in the schedule of the Quality Control Order.

4. BIS has been requested to follow the guidelines for registration of products and test labs. The MNRE will bring out a list of test labs approved by BIS by the end of March, 2018, which will be uploaded on MNRE web for public information. The revised Quality Control Order 2017 with schedule as above will be notified.

Subject:

Revised
Systems/Devices/Components Goods Order 2017.

To
All stakeholders

schedule and enforcement date of Solar Photovoltaic

(Dr. B. S. Negi) Adviser/Scientist-G(R&D Coord.) Email: negi@nic.in Telefax: 24368581

Revised-Schedule-of-CRO_SPV-2017 (1)

About Ritesh Pothan

Ritesh Pothan, is an accomplished speaker and visionary in the Solar Energy space in India. Ritesh is from an Engineering Background with a Master’s Degree in Technology and had spent more than a decade as the Infrastructure Head for a public limited company with the last 9 years dedicated to Solar and Renewable Energy. He also runs the 2 largest India focused renewable energy groups on LinkedIn - Solar - India and Renewables - India
This entry was posted in Government, India, MNRE, PV, Solar, Solar Policy, Solar PV and tagged , , , , , , , , . Bookmark the permalink.

1 Response to MNRE revises BIS Quality Control (Requirement for Compulsory Registration under BIS Act) Order 2017

  1. I think we have one lab in India, this lab unable to finish the test within time line i.e 1st July, due to high demand from PV manfactureres.
    Is MNRE extend the due date ?? please inform

    Like

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s