Powered by :
Haryana Power Purchase Centre (HPPC) on behalf of the state discoms: Uttar Haryana Bijli Vitran Nigam Limited and Dakshin Haryana Bijli Vitran Nigam Limited, has invited bids for the selection of solar power developers to set up 500 MW of grid-connected solar photovoltaic (PV) projects integrated with 250 MW/1,000 MWh four-hour duration battery energy storage system (BESS) in Haryana. The tender will be conducted through a tariff-based competitive bidding process under a build-own-operate model. The selected developers will supply power under a 25-year power purchase agreement (PPA) with HPPC. The deadline for bid submission is November 17, 2026.
According to the tender guidelines, the scope of work includes setting up the solar-plus-BESS project, including the transmission line up to the delivery/interconnection point, along with the associated line bays, at the developer’s own cost. Additionally, it includes the identification and acquisition of land, installation and ownership of solar PV projects and associated BESS. The selected developers will also be responsible for obtaining statutory approvals and grid connectivity, developing transmission lines and associated equipment up to the delivery point, and installing remote terminal units and supervisory control and data acquisition systems. The developers must install at least 0.5 MW/2 MWh of BESS capacity for every 1 MW of contracted solar project capacity. The projects are required to be commissioned within 24 months of signing the PPA. Additionally, the tender also requires bidders to comply with the applicable technical standards for solar PV modules and use modules and cells listed under the relevant Approved List of Models and Manufacturers. The minimum and maximum contracted capacity under a single bid are 5 MW and 250 MW, respectively.
Furthermore, the bidders are required to submit an earnest money deposit of Rs 1.327 million per MW in the form of a bank guarantee, a document fee of Rs 50,000 plus GST, and a bid processing fee of Rs 10,000 per MW, plus GST. Under the financial eligibility criteria, the bidders must have a net worth of at least Rs 13.27 million per MW of quoted capacity, based on the last two financial years, or at least 7 days before bid submission. Additionally, they must have a minimum annual turnover of Rs 7.64 million per MW of quoted capacity, based on the last two financial years, at least 7 days before bid submission.
Subscribe to our Newsletter!
Sectors
Explore
Resources
COPYRIGHT © 2017-2026 | RENEWABLE WATCH