0
Powered by :
Curtailment has cost renewable generators in Spain €140 million (~ $154.42 million) so far this year, according to Wood Mackenzie, a United Kingdom-based energy research and consultancy firm. The losses have remained high since the April 2025 blackout, because redispatch volumes have not returned to their earlier levels. Nationally, 4% of available renewable supply is being curtailed, but the share has exceeded 25% at certain nodes in Extremadura and Murcia. About half of this year’s curtailment has been caused by inertia and voltage control issues, rather than by line limits. Some 10 GW of utility-scale solar is still to join the congested network by 2028. More than 35 GW of the fleet could provide voltage control at no extra cost, whereas around 7 GW of solar PV would need inverter retrofits. If none of that 35 GW is brought to compliance, curtailment is forecast to reach 6.5 TWh by 2028, against 1.3 TWh in 2023.
SOLARbytes brings you the latest news in solar world in bite size; essentially a gist of important solar news in few sentences.
Subscribe to our Newsletter!
Quick Links
© 2026 SOLARbytes | SOLARbytes is a publication of Wat(t) Bytes Media Pvt. Ltd. All rights reserved.