The Essex outdoor centre can power its own buildings and keep grazing animals in the field under a 40-year solar permission.
by | 24th November 2026 20:26 | AppealsEnergyGreen BeltPlanning Policy
Lambourne End Outdoor Centre in Essex has won permission for 170 ground-mounted solar panels on grey belt land in a field east of the centre.
Inspector H Marriott allowed the appeal on 24th November 2026, giving the centre permission to generate its own electricity while continuing to graze animals around the panels.
I’d start with what the field does today, because the first question for the Inspector was how much this stretch of open countryside actually helps to keep towns apart.
The Inspector found that the field met the grey belt definition and that the energy scheme passed the other policy tests, so the centre did not have to demonstrate very special circumstances.
Epping Forest District Council refused the application on 24th March 2026, and the parties had an opportunity to comment when the Government revised national planning policy in August.
The Inspector used policy GB7 of the National Planning Policy Framework, which sets out the circumstances in which a proposal may qualify as appropriate development in England’s Green Belt.
The appeal site occupies part of an undeveloped field beside the outdoor centre on Manor Road, but the grey belt definition can include undeveloped land as well as previously developed sites.
The Inspector considered three purposes of the Green Belt, including checking the outward spread of large built-up areas and protecting the setting and special character of historic towns.
The field was outside any wider large built-up area, and the Inspector found that it made no strong contribution to either of those purposes.
The third question was whether the land kept neighbouring towns separate, and here the Inspector recognised that the field did form part of a gap.
Anyone looking across this landscape would still experience a much larger expanse of countryside, and substantial open land would continue to separate the towns with the panels in place.
Classifying this particular field as grey belt still left a second question about the effect of building on the Green Belt remaining across the whole plan area.
The panels would encroach on countryside to some extent, but their relatively small footprint meant the development would not fundamentally undermine the purposes of that wider Green Belt taken together.
Under the grey belt policy, the Inspector also had to consider the evidence of unmet need for this type of development and whether the location was sustainable.
National policy W3 recognises the contribution small energy projects can make and says applicants should not be required to demonstrate the need for renewable energy development.
The centre explained that generating its own electricity would help support its long-term finances, while national targets give weight to projects that cut greenhouse gas emissions.
The Inspector described this array as making a “modest yet meaningful contribution towards meeting net zero targets” and accepted that it contributed to an evidenced unmet need.
Most vehicle trips would come when workers install the panels or take them away, with only occasional maintenance visits once the equipment is running.
The Inspector accepted the location on that basis, and the Golden Rules that apply to major housing schemes in the Green Belt did not apply to the solar panels.
If you’re considering a project on grey belt land, I’d look at the power needs and likely travel separately, because a busier use could generate regular journeys that this equipment simply doesn’t need.
The centre has three years to begin development, but the 40-year operating period starts when the panels first supply electricity to the centre.
The operator must tell the council that date within ten working days and submit a scheme for removing the equipment before the permission ends, or sooner if generation stops early.
The council must approve details of the panels and associated structures before installation, including the design and materials of fencing, access tracks and any external lighting.
The application included stock fencing to permit grazing, and its biodiversity figures indicated that a wildflower meadow under the panels could improve habitat value by more than ten per cent.
The Inspector found no likely significant effect on the Epping Forest Special Area of Conservation given the nature of the work and the limited traffic it would generate.
The six-page appeal decision and conditions give the Inspector’s full reasoning on the grey belt and set out precisely when the operator must submit a removal scheme.
The Planning Inspectorate lists the case on its official appeal page under appeal reference 6008078.
The Planning Inspectorate quotation is reproduced under the Open Government Licence v3.0.
The appeal decision is also available on AppealBase.
Keep up with important planning changes, decisions, consultations and case law. We send one digest when there are new stories to read; if there is no new planning news, there is no email.
By subscribing, you agree to receive Planning Geek News by email. You can unsubscribe at any time. See our Privacy Policy.
Prefer to follow Planning Geek through Google?
Add Planning Geek as a preferred source so our stories are more likely to appear in your Top Stories.
Comments are open to Planning Geek members. Log in to join the discussion.
Get the latest Planning Geek stories in one daily digest.
One digest when there is new planning news. Unsubscribe anytime.
Finding Planning Geek useful?
Buy Ian a coffee to say thanks
Journalist, broadcaster or producer? Need a quick comment on a planning story, policy change or decision?
Request a comment →
Editorial standards & corrections →
Planning Geek on YouTube
Watch Ian explain permitted development, use classes, planning applications and current planning changes.
Watch on YouTube
Related planning topics
Permitted development
Use classes
Planning applications
Planning appeals
Planning enforcement
Latest planning news
24th November 2026
Natural England invites feedback by 10th December on standing advice for planning applications, with updated guidance expected in April 2027.
24th November 2026
Up to 21 residents would rely on two windowless kitchen and dining rooms as their only shared indoor space on the third floor.
24th November 2026
Drivers leaving the North Road site needed a 43-metre view across neighbouring gardens, and nobody could guarantee that it would stay clear.
24th November 2026
The existing garage already crossed Tameside’s daylight guideline, and the Inspector examined how the new link would affect a neighbouring child’s use of the garden.
24th November 2026
Croydon accepted the salon use on Westow Hill, but the Inspector found that the proposed glazing would harm the locally listed terrace.
24th November 2026
England retains its £8,100 minimum and £81,000 maximum for eligible owner-occupiers, while the qualifying tenant payment remains £8,100.
Videos from Ian Walmsley on permitted development, use classes, planning applications, appeals and the planning changes worth knowing about.
Planning consultancy backed by the UK's leading planning resource
Planning advice, applications, appeals, permitted development and planning strategy for homeowners, developers and businesses, including agricultural and equestrian clients.
Planning News
Permitted development
Use classes
Planning applications
Planning appeals
CIL
Building Regulations
Glossary
Get Planning Help
Book a Zoom call
About Planning Geek
Privacy policy
Disclaimer
Planning Geek provides general planning information, principally for England. Planning rules differ in Scotland, Wales and Northern Ireland. Nothing on this site constitutes legal or other professional advice. Read our full disclaimer and privacy policy. This site contains public sector information licensed under the Open Government Licence v3.0; official legislation is available at legislation.gov.uk.
© 2017–2026 Planning Geek Ltd
Planning Geek™ is a trading style of Planning Geek Ltd, established 2003
Planning Geek is part of isdoo Ltd