Links
WebSite
-
Join 5,059 other subscribers
Solar Now
Follow me on Twitter
My TweetsTop Posts & Pages
- Charanka - Gujarat Solar Park
- European Market Outlook For Residential Battery Storage 2021–2025
- RENEWABLE POWER GENERATION COSTS IN 2020
- บ.จีนแห่ลงทุน‘แผงโซลาร์เซลล์’ในไทย หวังเป็นฐานผลิตหลังยุโรปโต้ทุ่มตลาด
- About Us
- Renewable Energy Outlook: Thailand
- Photovoltaic Manufacturing Outlook in India
- PV WASTE MANAGEMENT IN INDIN
-
New Posts
- Solar Energy Policyin Uzbekistan: A Roadmap
- Southeast AsiaEnergy Outlook 2022
- Grid Integration ofElectric VehiclesA manual for policy makers
- Coal 2022 Analysis and forecast to 2025
- Mobilising Renewable Energy Projects in Small Island States
- Naturgy participa en el consorcio europeo NextFloat para acelerar el desarrollo industrial de la energía eólica marina
- RWE opera aerogeneradores en un dique
- Coal Analysis and forecast to 20242021
- An Energy SectorRoadmap to NetZero Emissions inIndonesia
- Security of CleanEnergy Transitions
Calendar
April 2023 M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Archives
Categories
Meta
- Andhra Pradesh
- Bioenergy
- Biomass
- capacity
- China
- Coal
- Concentrated Solar Power
- CSP
- Electricity
- Electricity generation
- energy
- Energy Storage
- environment
- First Solar
- Gas
- Generation
- Geothermal
- Germany
- Globally
- Government
- Grid
- Gujarat
- Hydro
- Hydropower
- India
- Japan
- Jawaharlal Nehru National Solar Mission
- JNNSM
- Karnataka
- Maharashtra
- Ministry of New and Renewable Energy
- mnre
- Nuclear
- Off-grid
- Oil
- Photovoltaic
- Photovoltaic system
- policy
- Power
- power generation
- power plants
- PV
- Rajasthan
- REC
- Renewable
- Renewable Energy
- Renewable Energy Certificates
- Renewables
- Solar
- solar blog india
- Solar cells
- Solar Development
- solar electricity
- solar energy
- solar hydrogen
- Solar India
- solar industry
- Solar Modules
- Solar Panel
- Solar Panels
- Solar Policy
- Solar Power
- solar power plants
- solar power projects
- Solar projects
- Solar PV
- solar renewable energy
- Solar Rooftop
- solar sector
- solar systems
- Tamil Nadu
- technology
- united states
- Wind
- Wind Power
Blog Followers
Category Archives: Tranche I
The WTO Just Ruled Against India’s Booming Solar Program
Cartoon by Courtenay Lewis On the heels of the recent global summit in Paris to tackle climate disruption, the World Trade Organization (WTO) has ruled against an important piece of the climate solution puzzle: India’s ambitious program to create homegrown … Continue reading
Posted in Batch I, Batch II, Government, India, JNNSM, MNRE, Phase I, Phase II, PV, Renewables, Rooftop, Solar, Solar Policy, Tranche I, USA, WTO
Tagged Jawaharlal Nehru National Solar Mission, JNNSM, Ministry of New and Renewable Energy, Photovoltaic, Renewables, Solar, Solar India, solar power plants, Solar PV, World Trade Organization, WTO
Leave a comment
Implementation of Project for setting up of 15,000 MW of Grid-connected Solar PV Power plants through NTPC Ltd. / NTPC Vidyut Vyapar Nigam Limited (NVVN) under National Solar Mission
The scheme will be implemented through the NTPC / NVVN (the power trading arm of NTPC Limited) under Ministry of Power. The scheme envisages setting up of Grid-connected solar PV power plants of 15,000 MW aggregate capacity in three tranches: … Continue reading
Posted in Batch I, Batch II, Government, Grid Connected, India, JNNSM, Manufacturing, Ministry of Power, NTPC, NVVN, Phase I, Phase II, Power Generation, PV, Renewables, Solar, Solar Parks, Solar Policy, Tranche I, Transmission and Distribution
Tagged central electricity regulatory commission, CERC, energy, environment, India, Jawaharlal Nehru National Solar Mission, JNNSM, Ministry of New and Renewable Energy, National Solar Mission, NSM, NTPC, NTPC Limited, NVVN, Photovoltaic system, PV, SERC, Solar India, Solar PV, State Electricity Regulatory Commission, Tranche-I, Tranche-II, Tranche-III
Leave a comment
India’s solar dream fuelled by global trends
The country plans to install 100 GW capacity of solar-generated electricity by 2022, a five-time increase from a previous target. India’s plan to install 100 GW capacity of solar-generated electricity by 2022, a five-time increase from a previous target, only … Continue reading
Posted in Batch I, Batch II, Climate Change, Coal, Commercial, Crystalline, Fossil Fuel, Global Warming, Grid Connected, Grid Interactive Distributed Solar Energy Systems, JNNSM, Phase I, Phase II, Power Generation, PV, Renewables, Residential, Rooftop, Rural Lighting, Solar, Solar Parks, Solar Pumps, Solar Thermal, Thin Film, Tranche I
Tagged Electricity generation, GW, India, Jawaharlal Nehru National Solar Mission, JNNSM, Renewables, Solar, solar electricity, Solar Power, solar power projects, Solar PV
Leave a comment
Final Draft Guidelines for Selection of 3000 MW Grid – Connected Solar PV Power Projects under Batch-II Tranche-I “State Specific Bundling Scheme”
Final-draft-3000-MW-Tranche-1-Draft-Guidelines-State-Specific-Bundling-Scheme-2015_29012015 Phase-II, Batch-II, Tranche-I : State Specific Bundling Scheme These guidelines are for 3000 MW. MNRE will indicate the total quantity for various States based on response received from the States. NVVN may then procure that quantity through one or … Continue reading
Posted in Batch II, Climate Change, Government, Grid Connected, India, JNNSM, MNRE, Phase II, Power Generation, Renewable Purchase Obligation, Renewables, Solar, Solar Policy, Subsidy, Tranche I
Tagged Electricity generation, energy, environment, India, Jawaharlal Nehru National Solar Mission, JNNSM, Ministry of New and Renewable Energy (India), mnre, NVVN, Phase-II Batch-II Tranche-I, Photovoltaic, Photovoltaic system, Solar Park, Solar Park Implementation Agency (SPIA), Solar Parks, Solar Power, solar power plants, solar power projects, Solar PV
Leave a comment
You must be logged in to post a comment.