As per Andhra Pradesh Solar Policy, 2012, vide G.O. Ms No: 39 Dt: 26.09.2012 & G.O. Ms. No. 44, dated: 16-11-2012 Vide item(9), Grid Connectivity and Evacuation facility, the power generated from a Solar Power Project shall be injected at an appropriate voltage to
the nearest sub-station of the APTRANSCO /APNPDCL.
The power evacuation line from project switchyard to interconnection point shall be laid by prospective developer at their own cost with the approval of APNPDCL /APTRANSCO duly taking the grid connectivity feasibility before executing the project.
Click here for the document with the evacuation details available at each district location for AP
Related articles
- Solar power now at grid parity! – AP receives bids for 350 MW solar PV power units at Rs 6.49 (natgrp.org)
- Guidelines for online submission of Total Bill of Material (BoM) and application for issue of Concessional Customs Duty Certificates (CCDC) and Excise Duty Exemption Certificate (EDEC) for availing Solar duty benefits (natgrp.org)
Pingback: Gujarat wants cut in solar power tariff for existing Solar Plants | Natural Group