Standard PPA and VGF Securitization Agreement for JNNSM Phase II Batch I

As of 20th December

Corrigendum-final-VGF_750MW_Guidelines_for-grid-solar-power-projects

Clarification_amendment-in-final-VGF_750MW_Guidelines_for-grid-solar-power-projects

Latest Documents as of 12 Dec 2013

Amendments in the RfS document-01 JNNSM Phase II Batch I dated 30th November, 2013

Standard Power Purchase Agreement-JNNSM Phase II Batch I-Final (V01) dated 30th November, 2013

Clarifications on the queries raised by various stakeholders, dated 30th November, 2013 JNNSM VGF Phase II 750MW

________________________________________________________________
IMPORTANT:
 As mentioned in the RfS document, the Pre-bid meeting has been scheduled for the various stakeholders. The details are as follows:

Venue: Auditorium, SCOPE Convention Centre, SCOPE Complex, 7, Lodhi Road, New Delhi-110003

Date: 19.11.2013

Time: 11.00 A.M.-2.00 P.M. On-spot Registration shall commence from 09.00 A.M. Advanced registrations shall not be done.

Note: In view of space constraint at the venue, at most 2 representatives from each organization shall be allowed to participate in the meeting. Stakeholders are requested to cooperate with the same. 

Bidders are requested that all the clarifications to be sought by them during the Pre-bid meeting may preferably be brought in hard copies, which would be deposited in a drop-box put up at the registration counter.

Potential Bidders are requested to kindly note that all clarifications pertaining to the RfS, PPA and VGF Securitization Agreement documents may be sought latest by 16th November 2013, so that the same could be clarified by SECI during the pre-bid meeting.

Standard Power Purchase Agreement

Viability Gap Funding Securitization Agreement 

Clarifications to commonly asked questions pertaining to the RfS document have been provided here

For the convenience of potential Bidders, the Formats to be submitted in the response to RfS are hereby provided in Word format. Please click here to download the Word file.

JNNSM Phase-II: Batch-I:Request for Selection (RfS) Document for 750 MW Grid Connected Solar PV Projects, dated 28.10.2013 

Advertisement for Request for Selection of 750 MW Grid Connected Solar PV Projects

Cabinet approves for setting up of 750 MW Grid connected Solar PV Projects through Viability Gap Funding

About Ritesh Pothan

Ritesh Pothan, is an accomplished speaker and visionary in the Solar Energy space in India. Ritesh is from an Engineering Background with a Master’s Degree in Technology and had spent more than a decade as the Infrastructure Head for a public limited company with the last 9 years dedicated to Solar and Renewable Energy. He also runs the 2 largest India focused renewable energy groups on LinkedIn - Solar - India and Renewables - India
This entry was posted in Batch I, JNNSM, Manufacturing, MNRE, Phase II, PV, SECI, Solar Policy and tagged , , , , , , , , , . Bookmark the permalink.