Determination of generic levellised generation tariff for the FY 2014-15 under Regulation 8 of the Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012.
ORDER
1. The Commission has notified the Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012, on 06.02.2012 (hereinafter referred to as “the RE Tariff Regulations”), which provide for terms and conditions and the procedure for determination of tariff of the following categories of Renewable Energy (RE) generating stations:
(a) Wind Power Project;
(b) Small Hydro Projects;
(c) Biomass Power Projects with Rankine Cycle technology;
(d) Non-fossil fuel-based co-generation Plants;
(e) Solar Photo voltaic (PV);
(f) Solar Thermal Power Projects;
(g) Biomass Gasifier based Power Projects;
(h) Biogas based Power Project.
Click here for the full order Cerc tariff revision 2014 May