Eskom extends registration deadline for home solar systems in South Africa – UA.NEWS

South African energy company Eskom has extended until September 30, 2026, the deadline for registering residential low-voltage solar photovoltaic systems and energy storage systems installed behind the meter. The company has also abandoned threats of fines or electricity disconnections for failure to register, Daily Maverick reports.
Initially, Eskom required such installations to be registered by March 31, 2026. The company also no longer requires an assessment by a specialist registered with the Engineering Council of South Africa. Instead, it will accept a certificate of compliance issued by a qualified electrician or electrical contractor registered with the Department of Employment and Labour.
At the same time, Eskom said it may discontinue electricity supply to a consumer if it considers their solar system or energy storage system unsafe. The Organisation Undoing Tax Abuse (Outa) disputes the legality of such a move against an owner holding a valid certificate of compliance.
According to Outa, Eskom should first prove that the certificate is invalid or was issued unlawfully. The organization notes that a certificate of compliance is a legal document confirming that an electrical installation meets technical and safety requirements under regulations adopted pursuant to the Occupational Health and Safety Act.
More current news is available on the UA.News Telegram channel Telegram.
Eskom justified its registration campaign by citing requirements of electricity regulation legislation, grid rules, risks to personnel safety, electricity supply quality, and the need to have data on the capacity of rooftop solar systems. Outa maintains that low-voltage systems with a capacity of up to 100 kW, connected on a consumer’s premises behind the meter, are not subject to registration with the energy regulator or distributor.
The organization also considers SANS 10142-1, rather than Eskom’s internal specifications, to be the mandatory technical standard. According to Outa’s position, an inverter that complies with this standard and has a valid certificate cannot feed electricity into the grid when the power supply is lost.
At a meeting with Outa on September 2, 2026, Eskom acknowledged that the vast majority of residential solar and battery installations connected to its grid remain unregistered. Despite this, the company insists that the September 30 deadline remains in force for now. Outa continues negotiations with Eskom and does not rule out a legal challenge if the company disconnects a consumer with a valid certificate of compliance after deeming the installation unsafe.

Read us on Telegram and Sends
Use of materials from the websites https://ua.news/ is permitted only if a reference (or, for online publications, a hyperlink) to UA.NEWS is included no later than the third paragraph.
Use of materials is permitted only upon receipt of written permission from the UA.NEWS editorial board and the mandatory placement of a direct hyperlink to the original publication https://ua.news/ in the first paragraph of the material, which must be open to indexing by search engines.
Materials marked with the “Advertisement” label are promotional and are published as advertisements. The editorial board may not share the views promoted therein. The editorial staff is not responsible for the facts and opinions published in advertising materials. In accordance with current Ukrainian legislation, the advertiser is responsible for the content of the advertisement.
Materials in the “Blogs” section represent the personal opinion of the blog author; the editorial staff may not share the author’s views.
Copyright infringement is prosecuted in accordance with the current legislation of Ukraine and the norms of international law.
The online media outlet UA.NEWS serves only an audience aged 21 and older. Online media entity; media identifier – R40-05225.
LLC “NEWS FLASH INFORMATION AGENCY.” All rights reserved.

source

This entry was posted in Renewables. Bookmark the permalink.

Leave a Reply