Mexico conditionally approves 621 MW solar project in Veracruz – pv magazine Global

Mexico’s General Directorate of Environmental and Risk Impact (DGIRA), part of the Ministry of Environment and Natural Resources (Semarnat), has granted conditional environmental approval for the 621.17 MWp Cerro Colorado solar plant.
Developer Desarrollos y Soluciones Energéticas Eirene plans to build the project in the municipalities of Sayula de Alemán and Texistepec, in the state of Veracruz.
The project comprises 941,166 solar modules, each with a capacity of 660 W, and 1,803 Huawei SUN2000-330KTL-H1 inverters, each rated at 330 kW. The electrical infrastructure will include a 34.5 kV medium-voltage network and three 34.5/230 kV step-up substations.
The plant will cover a total area of 1,062.62 hectares across three sections, designated North, Central and South. Permanent infrastructure will occupy 296.90 hectares, equivalent to 27.94% of the project area, while 763.89 hectares will remain free of infrastructure.
The design also includes 19.86 km of new internal roads and the use of a further 13.67 km of existing roads. The environmental documentation also refers to battery energy storage systems (BESS), but does not specify their capacity.
The authorization allows two years for site preparation and construction, 30 years for plant operation and maintenance, and nine months for decommissioning.
Environmental conditions include the full conservation of 40.89 hectares of secondary vegetation in medium-height evergreen rainforest, as well as programs to monitor wildlife, conserve habitats and ecological connectivity, and restore riverbanks and riparian areas.
The developer submitted the regional environmental impact statement on Feb. 19, 2026. The environmental approval does not exempt the developer from obtaining the other federal, state and municipal permits required for the project.
From pv magazine Mexico
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].
Comments
Please login to comment
Day 1 | Europe’s Solar and Storage Markets 2027: What works where?
Day 2 | Solar + Storage Co-location: Three markets, three business cases
Day 3 | Solar Quality: Which technical risks still need better answers?
Day 4 | Cybersecurity and Procurement: What can European solar projects source in 2027 and beyond?
Tuesday, December 8, 2026
5:00 pm – 6:00 pm CET, Berlin, Paris, Madrid
Monday, December 14, 2026
4:00 pm – 5:00 pm CET, Berlin, Paris, Madrid | 12:00 pm –1:00 pm BRT, São Paulo, Brazil
 
Tuesday, December 15, 2026
10:00 am – 11:00 am CET, Berlin, Paris, Madrid
Explore Spain’s growing solar and energy storage markets.
Get your free copy of the Genera Special Edition.
Your guide to the U.S. solar and storage market!
Explore the free RE+ 26 Special Edition.
Book your 2027 advertising opportunities now!
Amplify your brand presence with the leading trade media platform for the solar and storage industry.
Reach your target audience across 13 websites in 7 languages, magazines, daily newsletters, industry events and more.

You have no items in your basket.

source

This entry was posted in Renewables. Bookmark the permalink.

Leave a Reply