Links
WebSite
-
Join 5,059 other subscribers
Solar Now
Follow me on Twitter
My TweetsTop Posts & Pages
- Charanka - Gujarat Solar Park
- Exemption of Electricity Duty to Open Access consumers who are exempted to pay Electricity Duty. MSEDCL
- Global Energy andClimate Model
- ภาพรวมอุตสาหกรรมโซลาร์เซลล์ของไทย
- Myanmar: Solar Investment Opportunities Emerging Markets
- Top Wind Energy Owners in the USA are Farming PTCs, not Just the Wind
- Commissioning Status of Solar PV Projects under Batch – I, Phase - I of JNNSM
- GROWTH OF ELECTRICITY SECTOR IN INDIA FROM 1947-2020
-
New Posts
- Solar Energy Policyin Uzbekistan: A Roadmap
- Southeast AsiaEnergy Outlook 2022
- Grid Integration ofElectric VehiclesA manual for policy makers
- Coal 2022 Analysis and forecast to 2025
- Mobilising Renewable Energy Projects in Small Island States
- Naturgy participa en el consorcio europeo NextFloat para acelerar el desarrollo industrial de la energía eólica marina
- RWE opera aerogeneradores en un dique
- Coal Analysis and forecast to 20242021
- An Energy SectorRoadmap to NetZero Emissions inIndonesia
- Security of CleanEnergy Transitions
Calendar
March 2023 M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Archives
Categories
Meta
- Andhra Pradesh
- Bioenergy
- Biomass
- capacity
- China
- Coal
- Concentrated Solar Power
- CSP
- Electricity
- Electricity generation
- energy
- Energy Storage
- environment
- First Solar
- Gas
- Generation
- Geothermal
- Germany
- Globally
- Government
- Grid
- Gujarat
- Hydro
- Hydropower
- India
- Japan
- Jawaharlal Nehru National Solar Mission
- JNNSM
- Karnataka
- Maharashtra
- Ministry of New and Renewable Energy
- mnre
- Nuclear
- Off-grid
- Oil
- Photovoltaic
- Photovoltaic system
- policy
- Power
- power generation
- power plants
- PV
- Rajasthan
- REC
- Renewable
- Renewable Energy
- Renewable Energy Certificates
- Renewables
- Solar
- solar blog india
- Solar cells
- Solar Development
- solar electricity
- solar energy
- solar hydrogen
- Solar India
- solar industry
- Solar Modules
- Solar Panel
- Solar Panels
- Solar Policy
- Solar Power
- solar power plants
- solar power projects
- Solar projects
- Solar PV
- solar renewable energy
- Solar Rooftop
- solar sector
- solar systems
- Tamil Nadu
- technology
- united states
- Wind
- Wind Power
Blog Followers
Category Archives: Regulations and Procedures
UPERC (Captive and Renewable Energy Generating Plants) Regulations, 2019 (hereinafter referred to as CRE Regulations, 2019).
These Regulations shall apply to: All the Generating Stations based on Captive generation, renewable sources of generation and co-generation, existing prior to 01.04.2019 in the State of Uttar Pradesh as on the date of notification of these Regulations. Generation based … Continue reading
Posted in Policy, Regulations and Procedures, Renewables, Solar Policy, Solar PV, Uttar Pradesh
Tagged Availability Based Tariff, Biomass Power, Clean Development Mechanism (CDM), Mini/ Micro hydro projects, Non-fossil fuel based generation and Cogeneration projects, Small Hydro Projects, Solar PV Projects, Wind, Wind based power plants
Leave a comment
New MNRE Guidelines for Solar Manufacturers to Keep Project Quality in Check
The Ministry of New and Renewable Energy (MNRE) has issued a set of guidelines to be followed by solar manufacturers for models of modules that will be utilized in government-owned projects and those set up for the sale of electricity to … Continue reading
Posted in Government, India, JERC, Policy, Regulations and Procedures, Renewables
Tagged Electricity generation, environment, India, Ministry of New and Renewable Energy, Photovoltaic, Photovoltaic system, PV, Renewable, Renewable Energy, Renewables, Solar, solar energy, Solar Panel, Solar Power, solar power plants, Solar PV
Leave a comment
Uttar Pradesh Electricity Regulatory Commission Rooftop Solar PV Grid Interactive Systems Gross & Net Metering Regulations January 2019
Posted in DISCOM, India, Policy, PV, Regulations and Procedures, Renewables, Residential, Rooftop
Tagged Photovoltaics, PV, Solar, Solar India, Solar PV, solar system, UPERC, Uttar Pradesh, Uttar Pradesh Solar Policy
Leave a comment
Major relief for solar power developers: Projects deadline extended
The government has granted major relief to solar power developers, allowing deadlines for project development to be extended in cases where there were delays caused by circumstances beyond their control. Developers had raised an alarm over a letter from the … Continue reading
GST Cell in MNRE
Posted in MNRE, Regulations and Procedures, Solar, tax exemption
Tagged GST, mnre, Ruchin Gupta
Leave a comment
Rooftops – Indian Solar’s New Frontier by Ritesh Pothan
Rooftops – Indian Solar’s New Frontier Post 2009, Solar has been buzzing with medium as well as large projects and has recently crossed 6500MW at the end of March 2016, though installed capacity with rooftops currently at less than 0.25% … Continue reading
Posted in CERC, Cross Subsidy Surcharge, DISCOM, Government, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Maharashtra, MNRE, Net Metering, Policy, Power Generation, Regulations and Procedures, Renewables, Residential, Rooftop, Solar, Subsidy
Tagged energy, environment, Gujarat, India, Jawaharlal Nehru National Solar Mission, JNNSM, Ministry of New and Renewable Energy, Solar India, Solar Power, solar power plants, Solar PV
Leave a comment
Draft Guidelines for Tariff Based Competitive Bidding Process for Grid Connected Solar PV Power Projects – 2016
Objectives of the Guidelines Promotion of competition in the electricity industry in India is one of the key objectives of the Electricity Act, 2003. Power purchase costs constitute the largest cost element for distribution licensees. Competitive procurement of electricity by … Continue reading
Posted in DISCOM, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Policy, Power Generation, Regulations and Procedures, Renewables, Solar
Tagged Guidelines, Jawaharlal Nehru National Solar Mission, Ministry of New and Renewable Energy, Photovoltaic, Photovoltaic system, power plants, Renewable Energy, Solar Guidelines, Solar India, Solar Power, solar power projects, Solar PV
Leave a comment
National Solar Mission – Implementation of State-Level Solar Rooftop Photovoltaic Programs in India – Best Practise Guide
National Solar Mission Implementation of State-Level Solar Rooftop Photovoltaic Programs in India The Ministry of New and Renewable Energy (MNRE), Government of India has announced an ambitious solar target of 100,000 megawatts (MW) installed capacity by 2022, of which 40,000 … Continue reading
Posted in DISCOM, Grid Interactive Distributed Solar Energy Systems, India, MNRE, Net Metering, Regulations and Procedures, Renewables, Residential, Rooftop, Solar
Tagged India, Ministry of New and Renewable Energy (India), mnre, Photovoltaic system, power plants, Renewable Energy, Solar, Solar India, solar power plants, solar power projects, Solar PV, Solar Rooftop
2 Comments
Determination of Benchmark Capital Cost Norm for Solar PV power projects and Solar Thermal power projects applicable during FY 2016-17
Determination of Benchmark Capital Cost Norm for Solar PV power projects and Solar Thermal power projects applicable during FY 2016-17 The Commission notified the Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 … Continue reading
Posted in CERC, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Power Generation, PV, Regulations and Procedures, Renewables, Solar
Tagged Benchmark Capital Cost Norm, Benchmark Capital Cost Norm for Solar PV power projects for the year 2015-16 (Petition No. SM/005/2015 ‐Suo‐Motu), central electricity regulatory commission, Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources, Concentrated Solar Power, CSP, India, Ministry of New and Renewable Energy, Photovoltaic, Photovoltaic system, RE Tariff Regulations, Renewable Energy, Solar India, solar power plants, solar power projects, Solar PV
Leave a comment
You must be logged in to post a comment.