Methodology (Draft) for Implementation of 750 MW New grid connected Solar Power projects Under JNNSM Phase-II, Batch-I (Initial Draft*)

Solar Energy Corporation of India (A Govt of India Enterprise)

This documents is prepared based on draft guide lines issued by MNRE for selection of 750 MW New grid connected Solar Power projects Under JNNSM Phase-II, Batch-I and may undergo changes. Further this document is intended for stakeholders’ consultation purpose only and suggestions/Feedback may be mailed to corporate.seci@gmail.com. SECI reserves the right to accept or reject suggestions/ feedback received on this document. Further SECI will not issue any clarification/conformation on various suggestions/feedback received.

Read the full document here

Please also mail your suggestions to ritesh [ @ ] natgrp.net and we will forward a consolidated list to SECI by the 20th of May 2013.

 

About Ritesh Pothan

Ritesh Pothan, is an accomplished speaker and visionary in the Solar Energy space in India. Ritesh is from an Engineering Background with a Master’s Degree in Technology and had spent more than a decade as the Infrastructure Head for a public limited company with the last 9 years dedicated to Solar and Renewable Energy. He also runs the 2 largest India focused renewable energy groups on LinkedIn - Solar - India and Renewables - India
This entry was posted in Crystalline, JNNSM, Phase II, PV, Renewables, Solar, Solar Policy, Thin Film and tagged , , , , , , , , , . Bookmark the permalink.

1 Response to Methodology (Draft) for Implementation of 750 MW New grid connected Solar Power projects Under JNNSM Phase-II, Batch-I (Initial Draft*)

  1. Pingback: Punjab discloses the names of successful solar developers with just 251 MW of the 300 MW taken | Natural Group

Comments are closed.