SOLAR ENERGY CORPORATION OF INDIA
NEW DELHI-17
SECI/Cont./SRT-IV/70/2014/ 14-07-2014
Subject: Notification of the L1 bidders of different States in Part-A (Capex) and Part-B (RESCO) for price matching by L2, L3,L4….and so on.
1.0 The“Request for Selection(RfS)” was floated by SECI for Selection of bidders for implementation of 50 MW Grid Connected Roof Top Solar PV Projects (Phase-IV) vide RFS No.: SECI/Cont./SRT-IV/70/2014 dated 24.03.2014 and subsequent amendments and clarifications issued by SECI, dated 12th April, 2014, 17th April, 2014, 28th April, 2014, 2014 and 1st May, 2014. The Price bid opening of bids of qualified bidders was held on 10th July,2014,in front of representatives of the bidders who wished to be present.
2.0 Subsequent to evaluation of bids by SECI, following list of bidder’s stateswise is prepared in the ascending order of the price quoted by the bidders for different models viz. Part-A (CAPEX) and Part-B(RESCO).
Details are as follows:
Part-A
Andhra Pradesh [3 MW] | ||||
S No. |
Bidder |
Quoted Capacity
(kWp) |
Unit Rate
(Rs./Wp) |
Remarks |
1 | Tata Power Solar Systems Ltd. | 1500 | 67 | L1 |
Bihar[ 2MW] | ||||
S No. |
Bidder |
Quoted Capacity
(kWp) |
Unit Rate
(Rs./Wp) |
Remarks |
1 |
Premier Solar Powertech Pvt. Ltd. |
1000 |
75.97 |
L1 |
Gujarat[2 MW] | ||||
S No. |
Bidder |
QuotedCapacity
(kWp) |
UnitRate
(Rs./Wp) |
Remarks |
1 | Harsha Abakus solar Pvt.Ltd. | 1000 | 65 | L1 |
2 | Tata Power Solar Systems Ltd. | 1000 | 67 | L2 |
Haryana[2 MW] | ||||
S No. |
Bidder |
QuotedCapacity
(kWp) |
UnitRate
(Rs./Wp) |
Remarks |
1 | Hero Solar Energy Pvt.Ltd. | 1000 | 83 | L1 |
2 | Su-Kam Power Systems Ltd. | 1000 | 83.2 | L2 |
Jharkhand[2MW] | ||||
S No. |
Bidder |
QuotedCapacity
(kWp) |
UnitRate
(Rs./Wp) |
Remarks |
1 |
Premier Solar Powertech Pvt. Ltd |
1000 |
75.97 |
L1 |
2 | Fourth Partner Energy Pvt.Ltd. | 1000 | 78.6 | L2 |
Karnataka[2MW] |
S No. |
Bidder |
Quoted Capacity
(kWp) |
Unit Rate
(Rs./Wp) |
Remarks |
1 | Tata Power Solar Systems Ltd. | 1000 | 67 | L1 |
2 | Bosch Limited | 1000 | 77 | L2 |
Madhya Pradesh[1 MW] | ||||
S No. |
Bidder |
QuotedCapacity
(kWp) |
UnitRate
(Rs./Wp) |
Remarks |
1 | Ujaas Energy Limited | 500 | 78 | L1 |
2 | Hasan Marketing Pvt.Ltd. | 500 | 79.8 | L2 |
3 | Welspun Energy Pvt. Ltd. | 500 | 87.1 | L3 |
Maharashtra[ 3MW] | ||||
S No. |
Bidder |
QuotedCapacity
(kWp) |
UnitRate
(Rs./Wp) |
Remarks |
1 |
Sun Edison Solar PowerIndia Pvt. Ltd. |
1500 |
63 |
L1 |
2 | Thermax Limited | 1500 | 64.9 | L2 |
3 | Relyon Solar Pvt.Ltd. | 1500 | 67 | L3 |
4 | Tata Power Solar Systems Ltd. | 1500 | 67 | L3 |
5 | KPM Infrastructure Pvt.Ltd. | 1500 | 72 | L4 |
6 | Bosch Limited | 1500 | 78 | L5 |
Punjab[2MW] | ||||
S No. |
Bidder |
Quoted Capacity
(kWp) |
Unit Rate
(Rs./Wp) |
Remarks |
1 | HeroSolarEnergy Pvt.Ltd. | 1000 | 84.5 | L1 |
2 | AzurePowerIndia Pvt.Ltd. | 1000 | 86 | L2 |
Rajasthan[1 MW] | ||||
S No. |
Bidder |
QuotedCapacity
(kWp) |
UnitRate
(Rs./Wp) |
Remarks |
1 | Rays Power Experts(P) Ltd. | 500 | 71 | L1 |
2 |
Premier Solar Powertech Pvt. Ltd. |
500 |
75.98 |
L2 |
3 | Fourth Partner Energy Pvt.Ltd. | 500 | 78.6 | L3 |
4 |
Rajasthan Electronics & Instruments Limited |
500 |
90 |
L4 |
TamilNadu[3 MW] | ||||
S No. |
Bidder |
QuotedCapacity
(kWp) |
UnitRate
(Rs./Wp) |
Remarks |
1 | Thermax Limited | 1500 | 72.4 | L1 |
2 |
Mahindra EPC Services Pvt. |
1500 |
73 |
L2 |
3 | Jakson Engineers Limited | 1500 | 75 | L3 |
4 | Bosch Limited | 1500 | 79 | L4 |
Uttar Pradesh[ 3MW] | ||||
S No. |
Bidder |
QuotedCapacity
(kWp) |
UnitRate
(Rs./Wp) |
Remarks |
1 | Jakson Engineers Limited | 1500 | 73 | L1 |
2 |
Elcomponics Technologies India Pvt.Ltd. |
1500 |
79.92 |
L2 |
Part-B
Karnataka[1MW] | |||||
S No. |
Bidder |
Quoted
Capacity (kWp) |
Levellized
Tariff (Rs./kWh) |
Depreciation Method |
Remarks |
1 |
ReNew Solar Energy Pvt.Ltd. |
500 |
5.97 |
Without AD |
L1 |
2 |
Clean Max Enviro Energy Solutions Pvt. Ltd. |
500 |
6.209 |
Without AD |
L2 |
3 |
Madhav Infra Projects |
500 |
6.68 |
Without AD |
L3 |
AndhraPradesh
[2 MW] |
|||||
S No. |
Bidder |
Quoted
Capacity (kWp) |
Levellized
Tariff (Rs./kWh) |
Depreciation Method |
Remarks |
1 |
ReNew Solar Energy Pvt.Ltd. |
1000 |
5.97 |
Without AD |
L1 |
2 |
Clean Max Enviro Energy Solutions Pvt. Ltd. |
1000 |
6.339 |
Without AD |
L2 |
3 |
Mahindra EPC Services Pvt.Ltd. |
1000 |
6.355 |
Without AD |
L3 |
4 |
MadhavInfra Projects |
1000 |
6.68 |
Without AD |
L4 |
Delhi[ 2 MW] | |||||
S No. |
Bidder |
Quoted
Capacity (kWp) |
Levellized
Tariff (Rs./kWh) |
Depreciation Method |
Remarks |
1. |
Madhav Infra Projects |
1000 |
6.68 |
Without AD |
L1 bidderwithL1
price using“AD” will be Rs5.845/kWh. |
2.
|
Jakson Engineers Limited | 1000 | 6.685714 | – | BidderhasQuoted tariffRs.5.85/Wh with A.Dandhe is a L2bidder. |
3. | ReNew Solar Energy Pvt.Ltd. |
1000 |
6.69 |
Without AD |
L3 |
4. | Hero Solar Energy Pvt.Ltd. |
1000 |
6.745 |
Without AD |
L4 |
Maharashtra[ 2MW] | |||||
S No. |
Bidder |
Quoted Capacity (kWp) | Levellized Tariff (Rs./kWh) |
Depreciation Method |
Remarks |
1 |
Avant Garde Power Solutions Pvt.Ltd. | 1000 | 4.726 | Without AD |
L1 |
2 |
SunEdison Solar Power India Pvt. Ltd. |
1000 |
5.974 |
Without AD |
L2 |
3 |
Clean Max Enviro Energy Solutions Pvt. Ltd. |
1000 |
6.177 |
Without AD |
L3 |
4 |
ReNew Solar Energy Pvt.Ltd. |
1000 |
6.24 |
Without AD |
L4 |
5 |
Mahindra EPC Services Pvt.Ltd. |
1000 |
6.355 |
Without AD |
L5 |
6 |
Sunshine Solpower Generation Limited |
1000 |
6.481 |
Without AD |
L6 |
TamilNadu[2 MW] | |||||
S No. |
Bidder |
Quoted
Capacity (kWp) |
Levellized
Tariff (Rs./kWh) |
Depreciation Method |
Remarks |
1 |
SunEdison Solar Power India Pvt.Ltd. |
1000 |
6.322 |
Without AD |
L1 bidder with L1
price“AD”willbeRs 5.531/kWh. |
2 | Su-KamPower Systems Ltd. | 1000 | 6.395 | – | BidderhasQuoted tariffRs.5.596/kWh with A.D andhe isL2
bidder. |
3.0 All the bidders, other than L1 bidder of a state, can give their consent (in the format as attached herewith in Annexure-1) by 21st July, 2014, for matching the L1 price of the State in which he has submitted his offer for Part-A and for Part-B .After the receipt of consent, Capacity will be allocated to all the bidders at L1 price of the State.
As per the RFS, L1 bidder in a State is a successful bidder and subject to L1 price matching by other bidders of a State, other bidders shall also be called as Successful bidder(s).
For example: In Maharashtra, we have received bids for 9MW in Part-A against the tender capacity of 3MW. After the receipt of consent for matching the L1 price by all the bidders of the State, 9MW capacity can be allocated to all the bidders of the Maharashtra at L1 price. Same procedure may be adopted for other states as well where bids are in excess of tender capacity are received by SECI in Part-A and Part-B.
Note: Matching of L1 price in Part-B shall mean matching of entire tariff stream of 25 years.
4.0 In case if you require any clarification on above, please contact the undersigned.
(Avnish Parashar)
Dy. Manager(C)