Daily Archives: November 11, 2019

CEEW – Demystifying India’s rooftop solar policies – A state-level analysis Issue Brief | November 2019

Glossary Sanctioned load/contracted load – Sanctioned load is the maximum demand which is to be supplied by the discom to the consumer as indicated in the agreement between them. It is denoted in kW, kVA, or HP. Distribution transformer (DT) capacity – … Continue reading

Posted in Cross Subsidy Surcharge, DISCOM, Grid Connected, MSEDCL, Net Metering, PV, Renewables, Rooftop, Solar, Transmission Charges | Tagged , , , , , | Leave a comment