Category Archives: MSEDCL

CEEW – Demystifying India’s rooftop solar policies – A state-level analysis Issue Brief | November 2019

Glossary Sanctioned load/contracted load – Sanctioned load is the maximum demand which is to be supplied by the discom to the consumer as indicated in the agreement between them. It is denoted in kW, kVA, or HP. Distribution transformer (DT) capacity – … Continue reading

Posted in Cross Subsidy Surcharge, DISCOM, Grid Connected, MSEDCL, Net Metering, PV, Renewables, Rooftop, Solar, Transmission Charges | Tagged , , , , , | Leave a comment

Maharashtra State Electricity Transmission Draft Regulations – Oct 2019

Salient features of Draft MERC Rooftop RE Regulations 2019   Banked energy – excess than consumed in same TOD slot wherever applicable   1 MW capacity limit – but not for net billing   Can be owned by consumer, third … Continue reading

Posted in Commercial, DISCOM, Grid Connected, Industrial, MSEDCL, PV, Renewables, Residential, Rooftop, Solar | Tagged , , , , , | Leave a comment

Revision in Electricity Tariff with effect from 1 April, 2018 and Implementation thereof.

Comm_Cir Tariff 18-19_302 Revision in Electricity Tariff with effect from 1 April, 2018 and Implementation thereof. Subject: Revision in Electricity Tariff with effect from 1 April, 2018 and Implementation thereof. MAHAVITARAN Maharashtra State Electricity Distribution Co. Ltd. Maharashtra State Electricity … Continue reading

Posted in DISCOM, India, MSEDCL | Tagged , , , | 1 Comment

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD – Implementation of Goods & Services Tax (GST) in MSEDCL- General Awareness

All  Superintending Engineers, O&M and Civil Circles, MSEDCL. Sub : Implementation of Goods & Services Tax (GST) in MSEDCL- General Awareness . As we are all aware, the GST will be implemented w.e.f. 1st of July, 2017. Taxes which will … Continue reading

Posted in DISCOM, GST, MSEDCL, Taxes | Tagged , , , , | Leave a comment

Exemption of Electricity Duty to Open Access consumers who are exempted to pay Electricity Duty. MSEDCL

MAHAVITARAN Maharashtra State Electricity Distribution Co. Ltd. Maharashtra State Electricity Distribution Co. Ltd. Prakashgad, Plot No.G-9, Sandra (East), Mumbai – 400 051 (P) 26474753, (0) 26474211126472131, Fax- 26472366, E-Mail;-cecomm@mahadiscom.in   To, P-Com/Accts/EDI                                                            DEC 2016] All superintending Engineers                                                                                                        ‘ O&M … Continue reading

Posted in Cross Subsidy Surcharge, DISCOM, India, Maharashtra, MSEDCL | Tagged , , , , , , , , | Leave a comment

Grid Parity of Solar PV Rooftop Systems for the Commercial and Industrial Sectors

  Grid Parity of Solar PV Rooftop Systems for the Commercial and Industrial Sectors: New Delhi: The Energy and Resources Institute. 172 pp. Amazing Compilation of Details and a must read Grid Parity_SolarPV Rooftop

Posted in Commercial, DISCOM, Grid Connected, Ministry of Power, MSEDCL, Net Metering, PV, Renewables, Residential, Rooftop, Solar, Solar Policy, Solar PV, Tamil Nadu, Telangana, Transmission and Distribution | Tagged , , , , , , , , , , , | Leave a comment

RETAIL ELECTRICITY TARIFF OF MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. (‘MAHAVITARAN’) APPLICABLE FROM 1 NOVEMBER, 2016

RETAIL ELECTRICITY TARIFF OF MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. (‘MAHAVITARAN’) press-release-msedcl-tariff-order-english-03112016 APPLICABLE FROM 1 NOVEMBER, 2016 Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) is a Distribution Licensee in most of Maharashtra, including some areas in Mumbai. MSEDCL’s Petition for … Continue reading

Posted in DISCOM, Grid Connected, India, Industrial, Maharashtra, MERC, MSEDCL, Renewables, Transmission and Distribution | Tagged , , , , , , , , , | Leave a comment

Case No. 121 of 2014 In the matter of Petition of Maharashtra State Electricity Distribution Co. Ltd. for approval of Multi Year Tariff for Second Control Period FY 2013-14 to FY 2015-16

order-121of2014-26062015 Case No. 121 of 2014 In the matter of Petition of Maharashtra State Electricity Distribution Co. Ltd. for approval of Multi Year Tariff for Second Control Period FY 2013-14 to FY 2015-16 lettter-to-merc-dated-16-05-2016-2  

Posted in Cross Subsidy Surcharge, DISCOM, India, Maharashtra, MERC, MSEDCL, Transmission and Distribution, Transmission Charges | Tagged , , , | Leave a comment

Statements Of Reasons for Distribution Open Access Regulations, 2016 and Transmission Open Access Regulations, 2016

Statement of Reasons_DOA & TOA Regulations, 2016 Proposed in Draft DOA Regulations 3.1. Subject to the provisions of these Regulations, a Consumer having Contract Demand of 500 kW and above with a particular Distribution Licensee shall be eligible for Open … Continue reading

Posted in CERC, Cross Subsidy Surcharge, DISCOM, India, Maharashtra, MERC, MSEDCL, Transmission Charges | Tagged , , , , | Leave a comment

Maharashtra Electricity Regulatory Commission (Transmission Open Access) Regulations, 2016

Maharashtra Electricity Regulatory Commission (Transmission Open Access) Regulations, 2016 MERC (Net Metering for Roof-top Solar PV Systems) Regulations, 2015 MERC Distribution Open Access Regulations 2016 MERC Transmission Open Access Regulations,2016 Gazette Notification Dated 30 March, 2016 Statement of Reasons

Posted in DISCOM, Grid Interactive Distributed Solar Energy Systems, India, Maharashtra, MERC, MSEDCL, Renewables, Transmission Charges | Tagged , , , , , , , | Leave a comment