Tag Archives: mnre

View Dr. Ashvini Kumar’s -Director (Solar) – Solar Energy Corporation of India (SECI) presentation on VGF (Viability Gap Funding) at the Solar Markets India 2013 conference

Dr. Ashvini Kumar, Director (Solar), Solar Energy Corporation of India, needs no introduction as the designated government organization responsible for taking forward the JNNSM Solar Commitments by the MNRE. Phase II envisages another 750MW to be setup under the VGF scheme by … Continue reading

Posted in JNNSM, Phase II, Renewables, SECI, Solar, Solar Policy | Tagged , , , , , , , , , , | 2 Comments

Methodology (Draft) for Implementation of 750 MW New grid connected Solar Power projects Under JNNSM Phase-II, Batch-I (Initial Draft*)

Solar Energy Corporation of India (A Govt of India Enterprise) This documents is prepared based on draft guide lines issued by MNRE for selection of 750 MW New grid connected Solar Power projects Under JNNSM Phase-II, Batch-I and may undergo changes. … Continue reading

Posted in Crystalline, JNNSM, Phase II, PV, Renewables, Solar, Solar Policy, Thin Film | Tagged , , , , , , , , , | 1 Comment

SECI Invites RFS for Implementation Of Grid Connected Roof Top Solar Pv System Scheme In Selected Cities/States In India (Phase-II) of 11.1 MW

SOLAR ENERGY CORPORATION OF INDIA (A GOVERNMENT OF INDIA ENTERPRISE) INVITES REQUEST FOR SELECTION OF BIDDERS (RFS) FOR IMPLEMENTATION OF GRID CONNECTED ROOF TOP SOLAR PV SYSTEM SCHEME IN SELECTED CITIES/STATES IN INDIA (PHASE-II) RFS No: SECI/Cont./SRT-II/58/2013 Dated: 01.05.2013 SOLAR ENERGY … Continue reading

Posted in JNNSM, Phase II, PV, Renewables, Rooftop, Solar, Solar Policy | Tagged , , , , , , , , , , , , | Leave a comment

Solar power producers oppose any anti-dumping duty on imported gears

(In the last batch of the projects…) Ten solar power producers, including Jackson Ltd, Vikram Solar, Symphony Vyapar Pvt Ltd and Lexicon Vanijya Pvt Ltd have written to the ministry of new and renewable energy ( MNRE) saying imposition of … Continue reading

Posted in Cells & Modules, Crystalline, PV | Tagged , , , , , , , , , , , , , , , , , , | 5 Comments

Inviting comments on Draft Guidelines for setting up of 750 MW Grid Solar PV power projects with Viability Gap Funding (VGF) under Jawaharlal Nehru National Solar Mission (JNNSM), Phase-II, Batch-I

No. 29/5/2012-13/JNNSNM Government of India Ministry of New and Renewable Energy Solar Power Division Subject:  Invitation for Comments on  Draft Guidelines for setting up of 750 MW Grid Solar PV power projects with Viability Gap Funding (VGF) under Jawaharlal Nehru … Continue reading

Posted in Cells & Modules, Crystalline, JNNSM, MNRE, Phase II, PV, Renewables, Solar, Solar Policy, Thin Film | Tagged , , , , , , , , , , , , | 4 Comments

India’s Off-grid Renewables Initiative Changing Lives in Ladakh

Ladakh, a remote district of India’s northernmost state, is currently benefiting from the largest off-grid renewable energy project in the world. The Ministry for New and Renewable Energy (MNRE) is spending INR473 billion (US$88.8 million) on decentralized solar and hydro … Continue reading

Posted in Crystalline, Off-grid, PV, Renewables, Rural Lighting, Solar, Thin Film, Transmission and Distribution | Tagged , , , , , , , , , , , , , , , , , , | 1 Comment

India achieves 1.44GW cumulative capacity for Solar PV

India has plans to install a further 800MW in this fiscal year. Image: Tata Power India has achieved a total a cumulative capacity of 1,447MW for grid-connected solar PV. According to statistics from the Indian Ministry of New and Renewable … Continue reading

Posted in Crystalline, PV, Renewables, Solar, Thin Film | Tagged , , , , , , , , , , , , | 4 Comments

15780 off-grid SPV Power Plants with total capacity of 13.25 MWp Sanctioned in 2012-13

The Ministry has sanctioned 15780 off-grid solar photovoltaic (SPV) power plants of total capacity of 13.25 MWp to be installed on individual houses in the country during 2012-13. Under the Off-grid and Decentralized Solar Applications Scheme of Jawaharlal Nehru National … Continue reading

Posted in Crystalline, Off-grid, PV, Rooftop, Solar | Tagged , , , , , , , , , , , , , | Leave a comment

US challenges India’s solar program restrictions at WTO

The United States on Wednesday filed a challenge with the World Trade Organisation over elements of India’s national solar program, which it said discriminates against foreign solar products in violation of a core global trade rule. The case comes as … Continue reading

Posted in Crystalline, JNNSM, Phase II, PV, Renewables, Solar, Solar Policy, Thin Film | Tagged , , , , , , , , , , , , , , , | Leave a comment

Opportunities and Challenges for Solar Minigrid Development in Rural India – NREL

  The goal of this report is to inform investors about the potential of solar minigrid technologies to serve India’s rural market. India, a rapidly emerging economy with the world’s second largest population, is facing a surging energy demand. A large portion … Continue reading

Posted in Renewables | Tagged , , , , , , , , , | Leave a comment

MNRE 30% subsidy available for up to 500KWp plants

In continuation of this Ministry’s recent sanction order of even of even number dated 30 th Oct. 2012 reg. additions/amendments in the above mentioned scheme , I am directed to convey the sanction of the President of India for re-fixing / … Continue reading

Posted in Crystalline, PV, Rooftop, Solar, Thin Film | Tagged , , | Leave a comment

Salient features of state policies, by MNRE

We had published the state policy salient features on a number of occasions and so has MNRE MNRE has published the salient features for the states with solar policies on 20th Nov 2012, click here for the detailed document. This … Continue reading

Posted in CSP, PV, Rooftop, Solar, Solar Policy, Solar Thermal | Tagged , , , , , , , , , , , , , , | Leave a comment

Modification/simplification of the existing procedure being followed for issue of Concessional Customs Duty Certificate (CCDC) and Excise Duty Exemption Certificates EDECs)

Modification/simplification of the existing procedure being followed for issue of Concessional Customs Duty Certificate (CCDC) and Excise Duty Exemption Certificates EDECs), in respect of items , equipment etc. required for initial setting up of Solar PV and Solar Thermal Solar Thermal power projects. … Continue reading

Posted in Crystalline, MNRE, PV, Solar Thermal, Thin Film | Tagged , , , , , , , , | Leave a comment

Suggestions / Recommendations for CERC Hearing on the 15th of January 2013

By Ritesh Pothan CERC, the governing body for electricity in India had instituted the REC mechanism for the balancing and motivation of renewable energy systems in India which is now facing a crisis due to the reluctance of DISCOMS to … Continue reading

Posted in Biomass, CSP, PV, Renewable Energy Certificates, Renewable Purchase Obligation, Renewables, Solar | Tagged , , , , , , , , , , , | 6 Comments

Recommendations for JNNSM Phase II Draft Policy

In my presentation at Solar Markets India, had touched upon each aspect of Solar Policy in India at the Centre and State which could be used as a recommendation baseline for the JNNSM Phase II policy draft. You can find … Continue reading

Posted in CSP, JNNSM, Phase II, PV, Rooftop, Rural Lighting, Solar, Solar Thermal | Tagged , , , , , , , , , , , , , , , , | 3 Comments

TN RE agency wants permission for subsidies in line with Kerala

The Tamil Nadu Energy Development Agency (TEDA), in charge of clean energy development in the State, is seeking permission from the Ministry of New and Renewable Energy so that it can on its own sanction subsidies for solar photo-voltaic projects. At present, TEDA sends … Continue reading

Posted in PV, Solar, Solar Thermal | Tagged , , , , , , , , | Leave a comment

MNRE revises off grid benchmark PV prices

In continuation of this Ministry’s recent sanction order of even of even number dated 30th Oct. 2012 reg. additions/amendments in the above mentioned scheme , I am directed to convey the sanction of the President of India for re-fixing / revising … Continue reading

Posted in MNRE, Off-grid, Rooftop, Solar | Tagged , , , , , | Leave a comment

JNNSM Phase II – Draft Policy

Moving forward after 2 successful bids, MNRE has now released the JNNSM_Phase_II_Dec_2012_Draft The draft policy makes for some good reading on the current scenario of Solar in India with information presented on the various facets of the prior policies and summaries … Continue reading

Posted in JNNSM, MNRE, Phase II, PV, Renewable Purchase Obligation, Rooftop, Rural Lighting, Solar, Solar Thermal | Tagged , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

All India Regionwise Generating Installed Capacity (MW) Of Power Utilities Including Allocated Shares

All India Regionwise Generating Installed Capacity (MW) Of Power Utilities Including Allocated Shares – Sept 2012 REGION THERMAL Nuclear HYDRO R.E.S.@ TOTAL COAL GAS DSL TOTAL (Renewable) (MNRE) Northern 29923.5 4671.26 12.99 34607.75 1620 15423.75 4437.65 56089.15 Western 43199.5 8254.81 … Continue reading

Posted in Nuclear, PV, Solar, Transmission and Distribution | Tagged , , | Leave a comment

JNNSM: Phase 1 Batch 1, project status and tariff reduction numbers

  Scheme Projects allotted Projects Commissioned Weighted Average bid tariff % Reduction in tariff No. MW No. MW Large PV projects through NVVN 30 150 26 130 12.16 Rs. / Unit 32 % 2 Projects Cancelled Migration Scheme SPV 13 … Continue reading

Posted in JNNSM, PV, Renewables, Solar, Solar Thermal | Tagged , , , , , , , , , , , , | 2 Comments

Solar Market in India 2012″ being held at Hyatt Regency, Bhikaji Cama Place, New Delhi on 29th August,2012.

Solar Energy Association of Gujarat is supporting an important National Seminar  “Solar Market in India 2012″  being held at Hyatt Regency, Bhikaji Cama Place, New Delhi on 29th August,2012. The Highlights of the Seminar are as follows: The Seminar is … Continue reading

Posted in Events, Renewables, Solar | Tagged , , , , , , , , , , , , , , , , , | Leave a comment

Off-grid subsidy details for Solar PV

For all those who are looking to deploy Solar in residential and commercial areas, here is the breakup of what you can avail off from MNRE Capital Subsidy: 30% of benchmark cost of photovoltaic systems with battery back-up support and … Continue reading

Posted in JNNSM, Micro Grid, Off-grid, Renewables, Solar | Tagged , , , , , , , , , , , , , | Leave a comment

Top 5 predictions for Solar PV in India for the year 2012 – Ritesh Pothan

There is a good amount of confusion reigning in the Solar PV arena and this post is to help clear up the air. I cannot guarantee the veracity of this post as the predictions are based on past inputs and … Continue reading

Posted in JNNSM, Renewables, Solar | Tagged , , , , , , , , , , , , , , , , , , , , , | 4 Comments

Solar Power bids below Rs. 9 per unit risky says Crisil Research

KOLKATA: CRISIL Research, believes that the pace of reduction in capital costs in solar power is expected to moderate in 2012. This will exert pressure on the margins of players, who have bid below Rs 9 per unit under batch 2 of Jawaharlal … Continue reading

Posted in JNNSM, News, Renewables, Solar | Tagged , , , , , , , , , , , , , , , , , , , | 4 Comments

India Banks Face Solar Setback As Projects Delayed, Fined

Banks may restrict loans to Indian solar projects after the government fined 13 projects for delays, including one owned by Indian Oil Corp. (IOCL) An inquiry found 13 of 20 projects in northwestern Rajasthan state missed their deadline, according to … Continue reading

Posted in JNNSM, News, Solar | Tagged , , , , , , , , , , , , , | 2 Comments

Tata Power helps lights up two villages in Maharashtra with solar energy through Nabard

Two villages in Maharashtra which had no electricity till now have been linked up by Tata Power’s solar power initiative. Tata Power Community Development Trust has provided power to about 50 households in Limbarvadi and Bhadaskonda of the Mulshi region … Continue reading

Posted in Micro Grid, Off-grid, Solar | Tagged , , , , , , , , , , | 2 Comments

List of Selected Projects under JNNSM Phase I Batch II

If you are interested in knowing the location and size of the allocated power plants under JNNSM Phase 1 Batch II, please click here

Posted in JNNSM, Solar | Tagged , , , , , , , , , , , , , , , | 2 Comments

Status of Commissioning of 20 Solar PV Projects located in the State of Rajasthan under JNNSM Phase-I, Batch-I: Notice inviting Comments

NVVN has recently posted the status of the solar power plants due for commissioning under JNNSM Phase 1 Batch 1 and have requested for any comments as well. Status of Commissioning of 20 Solar PV Projects located in the State … Continue reading

Posted in JNNSM, Solar | Tagged , , , , , , , , , , , , , , , | 2 Comments

JNNSM Phase-I Batch-I Details of Project Developers with existing Power Purchase Agreements

JNNSM Phase-I Batch-I Details of Project Developers with existing Power Purchase Agreements Please click here for an exhaustive list of developers in Phase 1 Batch 1

Posted in JNNSM, Solar | Tagged , , , , , , , , , , , , , , , , , , | Leave a comment

Status update of solar policies and allocations across India

  Last summer, Ritesh Pothan blogged about India’s Central Government Policy as well as certain key state policies for solar power in Part 2 of his Indian Solar Saga series. In this latest piece, he updates us on the state … Continue reading

Posted in JNNSM, Renewables, Solar | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | 2 Comments

Former chairman of Atomic Energy Commission (AEC), Anil Kakodkar, says he has been asked to head India’s Solar Programme

Former chairman of Atomic Energy Commission (AEC), Anil Kakodkar, on Thursday, May 24th 2012,  refuted media reports that he “refused” Rajya Sabha nomination. He said he could not accept the Prime Minister’s offer because he has his hands full with various government … Continue reading

Posted in JNNSM, News, Solar | Tagged , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Biomass-based power producers seek regulators’ help to resolve issues

Natgrp: Oddly enough over the last few years the biomass industry has faced a number of issues sourcing agricultural waste from local farmers due to the nearsightedness of not tying up the supply chain using professional methods which has led to the current … Continue reading

Posted in Biomass, News, Renewables | Tagged , , , , , , , , , , , , , | Leave a comment

Interview with Tarun Kapoor, Joint Secretary from the Ministry of New and Renewable Energy of India about the main drivers for the industry

PV Insider spoke with Tarun Kapoor, Joint Secretary from the Ministry of New and Renewable Energy of India about the main drivers for the industry today, including the latest developments and future outlook of the National Solar Mission. Get the … Continue reading

Posted in Interviews, JNNSM, Solar | Tagged , , , , , , , , , , , , , , , | 2 Comments

Rajasthan’s solar programme indefinitely postponed

Source: The Hindu Business The 200 MW solar programme of the state of Rajasthan has been indefinitely postponed. On Thursday, the Rajasthan Renewable Energy Corporation put up a circular on its website, which read: “Last date of receiving of bids … Continue reading

Posted in News, Renewables, Solar | Tagged , , , , , , , , , , , , , , , , , , , , | 2 Comments

PV Utility Scale Map India 2012

Researchers at PV Insider have completed their exclusive PV Utility Scale Map India 2012, the very first map of its kind released in India. The research team at PV Insider have finalized the first map of its kind for utility … Continue reading

Posted in JNNSM, Renewables, Solar | Tagged , , , , , , , , , , , , , , , , , , , , , , , , | 2 Comments

The Indian Biomass Power Sector – Part 1

by Jai Rathod In the first of a two-part blog piece, Ritesh Pothan’s colleague, Jai Rathod, takes a look at the milestones reached by India’s biomass sector. Jai reports that India’s biomass industry faces a number of challenges, but concludes that “in … Continue reading

Posted in Biomass, Renewables | Tagged , , , , , , , , , , , , , , , | 4 Comments

National Solar Mission completes 89% of allotted capacity

The National Solar Mission, which aims to install 20,000 MW capacity of solar energy by 2020, has commissioned 89% of its allotted capacity in its first stage, government officials said. The government had signed power purchase agreements (PPA) with 28 solar power developers for 140-MW … Continue reading

Posted in JNNSM, Solar | Tagged , , , , , , , , , , , , , , , , | 1 Comment

Government says Lanco Infratech flouted norms, but not involved in scam. NVVN turns a blind eye and forgives Lanco.

Lanco Infratech flouted norms of the national solar mission, but made up for it after a warning issued by the government, informed a senior official with the ministry of new and renewable energy. After completing the investigation against Lanco, ministry … Continue reading

Posted in Renewables, Solar | Tagged , , , , , , , , , | 2 Comments

India’s largest solar power plant inaugurated on April 1, 2012

JAISALMER: The desert state on Saturday achieved the glory of having the country’s biggestsolar power generation plant. The 40MW plant has been set up at Dhoodsar village near Pokhran in Jaisalmer district and the plant started power generation from Saturday. In … Continue reading

Posted in Renewables | Tagged , , , , , , , , , | Leave a comment

No more accelerated depreciation for Wind Turbines in India but GBI may continue

Spending on new wind farms in India, the world’s third-largest market for turbine producers such as Suzlon Energy Ltd. (SUEL) and Gamesa Corp. Tecnologica SA (GAM), may stall as the country cut a tax break this month, industry officials said. “Investment could come to … Continue reading

Posted in Renewables, Wind | Tagged , , , , , , , , | 3 Comments

Solar success depends on enforcement of renewable purchase obligation: Gireesh Pradhan

REC’s still a tough push – Secretary MNRE Mr Gireesh B. Pradhan, Secretary, Ministry of New and Renewable Energy (MNRE), was overheard today as saying that he found himself in the “right ministry” – a fact that indicates that the … Continue reading

Posted in Interviews, Solar | Tagged , , , , , , | 2 Comments

Lanco Group granted incorrect commissioning certificates for seven solar power plants as part of JNNSM Phase 1 Batch 1

In a major scam, seven associates of the Lanco Group, an infrastructure company owned by Congress MP Rajagopal Lagadapati, were granted commissioning certificates in January by a Rajasthan government body for seven 5 MW solar power plants each in Askandra village, Jaisalmer, … Continue reading

Posted in JNNSM, Renewables, Solar | Tagged , , , , , , , , , , , , , | 2 Comments

Wind to loose tax accelerated depreciation break come April 2012

Source: Bloomberg India will discontinue a tax break for wind farms starting in April, the beginning of the financial year, potentially stalling growth in a $3 billion market dominated by turbine-supplier Suzlon Energy Ltd. “Accelerated depreciation will go away in … Continue reading

Posted in Renewables, Wind | Tagged , , , , , | 1 Comment

Generation Based Incentives by IREDA for the 1st Solar 100MW (100KW-2MW) connected to the grid

The Ministry of New & Renewable Energy had already introduced Generation Based Incentive (GBI) schemes separately for wind and solar energy in 2009. Under the scheme for wind power, a GBI @ Rs. 0.50 per unit of electricity fed into … Continue reading

Posted in Renewables, Solar | Tagged , , , , , , , , , , | 1 Comment

Intersolar 2011 – a brief update on the conference

Jai Rathod, From NG, was at the recently concluded Inter Solar conference at the Leela and the subsequent exhibition at the Bombay Exhibition Centre, held from 13-16 December, 2011. Below is a synopsized version of the going ons and speaker … Continue reading

Posted in Events, Renewables, Solar | Tagged , , , , , , , , , , , , | Leave a comment

JNNSM – Phase 1 Batch 2 PPA bidding for 350MW of PV Power Projects

The Indian Ministry of New and Renewable Energy MNRE has now officially received the bids for the Second Batch of Solar Photovoltaic Power Projects under the JNNSM. As predicted in our previous posts on the allocations, the competition for projects … Continue reading

Posted in Events, Hydro, JNNSM, Renewables, Solar, Wind | Tagged , , , , , , , , , , , | 9 Comments

JNNSM – Phase 1 Batch 2 PPA bidding for 350MW of PV Power Projects

Please refer to the updated post here The Indian Ministry of New and Renewable Energy MNRE has now officially received the bids for the Second Batch of Solar Photovoltaic Power Projects under the JNNSM. As predicted in our previous posts … Continue reading

Posted in Renewables, Solar | Tagged , , , , , , , , , , , | Leave a comment

Events: Wind IPP Summit: 2012 – Scale, Offshore and Repowering: Building Future Wind Capacity

Wind IPP Summit: 2012 – Scale, Offshore and Repowering: Building Future Wind Capacity  17 – 18 January, 2012, Mumbai, India Wind energy is the largest source of renewable energy in India. Wind power in India has shown sharp growth, with … Continue reading

Posted in Renewables, Wind | Tagged , , , , , , , , , , , , , , , | Leave a comment

Australian Carbon Tax Legislation has now been passed and will convert into an emissions trading system in 2015

For all those Renewable Energy Projects who have written off carbon credits as a funding mechanism should take heart in the form of the Australian Carbon Tax legislation which allows for purchase of carbon credits from outside Australia post 2015, … Continue reading

Posted in Biomass, Hydro, Renewables, Solar, Wind | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Biomass – a Sustainable Renewable Energy Source for India

Biomass – a sustainable renewable energy source for India! Biomass has been man’s fuel of choice ever since the time he harnessed energy in the form of fire, and continues to have a considerable impact on rural populations especially in … Continue reading

Posted in Biomass, Renewables | Tagged , , , , , , , , , , | 2 Comments